可再生能源项目外源性风险评估研究
Research on the Exogenous Risk Assessment of Renewable Energy Projects

DOI: 10.12677/ecl.2025.143838, PP. 1384-1396

Keywords: 可再生能源项目,风险评估,AHP-熵权法组合权重,未确知测度
Renewable Energy Projects
, Risk Assessment, AHP-Entropy Weight Method for Combined Weighting, Uncertainty Measure Theory

Full-Text   Cite this paper   Add to My Lib

Abstract:

截止到2024年底,“一带一路”倡议提出已逾十年,它根源于中国的愿望,即通过加强国际合作,促进沿线国家的互利共赢,推动全球化进程。研究“一带一路”倡议下沿线国家中可再生能源的发展对经济增长的影响具有深远的意义。本文从政治风险、经济风险、社会风险和自然风险四个方面构建外源性风险评估指标体系。研究采用AHP-熵权法确定指标权重,结合未确知测度理论构建了风险评估模型。以巴基斯坦乌子高水电站为案例,运用本文所构建的风险评估模型,评估其项目风险等级为“较高”,实证证明了该模型具有较强的可靠性与实用性。本文构建了较为全面的风险评估指标体系,丰富了可再生能源项目外源性风险评估的相关研究,对促进相关项目的可持续发展具有现实意义。
By the end of 2024, the Belt and Road Initiative has been proposed for more than ten years. It is rooted in China’s desire to promote mutual benefit and win-win results among countries along the route through strengthening international cooperation and promoting the process of globalization. It is of far-reaching significance to study the impact of the development of renewable energy on economic growth in countries along the Belt and Road. This article constructs an exogenous risk assessment index system from four aspects: political risk, economic risk, social risk, and natural risk. The study used the AHP-entropy weight method to determine the weight of indicators, and combined with the unascertained measurement theory to construct a risk assessment model. Using the Wuzi Gao Hydropower Station in Pakistan as a case study, utilizing the risk assessment model constructed in this paper, the project’s risk level is evaluated as “high”, it is empirically demonstrated that the model exhibits strong reliability and practicality. This article constructs a comprehensive risk assessment index system, enriches the relevant research on exogenous risk assessment of renewable energy projects, and has practical significance for promoting the sustainable development of related projects.

References

[1]  盛斌, 黎峰. “一带一路”倡议的国际政治经济分析[J]. 南开学报(哲学社会科学版), 2016(1): 52-64.
[2]  马振东. “人大能源指数”开启对“一带一路”国家投资风险评估[J]. 中国国情国力, 2016(3): 81.
[3]  刘家国, 郭君雨, 崔进. 21世纪海上丝绸之路沿线国家投资风险研究[J]. 中国石油大学学报(社会科学版), 2019, 35(5): 15-26.
[4]  Yuan, J., Zeng, Y., Guo, X., Ai, Y. and Xiong, M. (2018) Electric Power Investment Risk Assessment for Belt and Road Initiative Nations. Sustainability, 10, Article No. 3119.
https://doi.org/10.3390/su10093119
[5]  Zhang, H. (2011) Two Schools of Risk Analysis: A Review of Past Research on Project Risk. Project Management Journal, 42, 5-18.
https://doi.org/10.1002/pmj.20250
[6]  王达, 毕可为. 公路工程项目社会稳定风险评估模型[J]. 市政技术, 2023, 41(5): 90-95+111.
[7]  Mican, C., Fernandes, G. and Araújo, M. (2022) A Method for Project Portfolio Risk Assessment Considering Risk Interdependencies—A Network Perspective. Procedia Computer Science, 196, 948-955.
https://doi.org/10.1016/j.procs.2021.12.096
[8]  Nigam, M.K., Avikal, S. and Ram, M. (2021) Risk Assessment in ERP Project by COPRAS Method under Fuzzy Environment. International Journal of Reliability, Quality and Safety Engineering, 28, Article ID: 2140006.
https://doi.org/10.1142/s0218539321400064
[9]  舒亚辉. “一带一路”背景下海外建筑项目财务风险研究——以塞内加尔A项目为例[J]. 国际商务财会, 2023(21): 9-14+22.
[10]  李永奎, 盛昭瀚, 丁荣贵, 等. 基于复杂系统思维的国际重大项目治理: “一带一路”视域下的创新思考[J]. 中国软科学, 2023(11): 12-22.
[11]  熊泽. “一带一路” PPP项目审计风险识别研究[J]. 市场周刊, 2023, 36(10): 124-128.
[12]  李军. JX公司赞比亚项目风险管理研究[D]: [硕士学位论文]. 南昌: 江西财经大学, 2023.
[13]  孙丹阳. 基于ISM和Multi-Agent仿真模拟的涉外EPC项目设计变更风险管理[D]: [硕士学位论文]. 南昌: 江西科技师范大学, 2023.
[14]  李林卿, 吕敏, 刘艳华, 等. 基于BWM-WASPAS的“一带一路”沿线基础设施投资风险评估[J/OL]. 综合运输: 1-10.
http://kns.cnki.net/kcms/detail/11.1197.u.20230328.1424.006.html, 2024-02-28.
[15]  刘佳. W公司苏丹农业投资项目风险管理研究[D]: [硕士学位论文]. 济南: 山东财经大学, 2024.
[16]  张淼臣. S电建公司沙特地区国际工程项目风险管理研究[D]: [硕士学位论文]. 济南: 山东大学, 2024.
[17]  吴西. 四川KF集团的海外项目风险管理研究[D]: [硕士学位论文]. 成都: 电子科技大学, 2024.
[18]  王昱睿. 东道国风险对中国“一带一路”项目投资的影响研究[D]: [博士学位论文]. 大连: 东北财经大学, 2023.
[19]  黄煜东. 国际工程CH公路改建项目风险评价研究[D]: [硕士学位论文]. 南京: 南京工业大学, 2022.
[20]  陈洁, 魏海蕊. “一带一路”背景下海外工程项目重大件物流风险评价研究[J]. 物流工程与管理, 2022, 44(8): 6-9.
[21]  赵洪帝, 刘敬贤, 刘奕, 等. 基于改进未确知测度模型的内河客船夜航风险评价[J]. 交通信息与安全, 2018, 36(1): 28-34.
[22]  李丹阳, 赵云胜, 史小棒, 等. 基于改进未确知测度法的光伏发电项目应急能力成熟度评估模型研究[J]. 工程管理学报, 2017, 31(5): 117-122.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133