|
轨道交通车辆基地防洪防涝措施研究
|
Abstract:
近年来极端降雨天气频发,对轨道交通设计、建设、运营提出了新的要求和挑战,为进一步提升轨道交通车辆基地防洪防涝能力,通过调研“720特大暴雨”后轨道交通车辆基地受淹情况,提出车辆基地防洪防涝提升建议及方案。
The frequent occurrence of extreme precipitation in recent years has brought new requirements and challenges to the design, construction and operation of rail transit. In order to further improve the flood control and waterlogging prevention capacity of the rail transit vehicle base, the suggestions and schemes for improving the flood control and waterlogging prevention of the vehicle base are proposed by investigating the flooding situation of the rail transit vehicle base after the “7-20” extreme rainfall event.
[1] | 刘宗泽. 郑州地铁6号线花园口车辆段全自动无人驾驶车辆基地方案设计[J]. 现代城市轨道交通, 2018(2): 42-45. |
[2] | 周启国, 李前明, 陈凡, 等. GB 50187-2012. 工业企业总平面设计规范[S]. 北京: 中国计划出版社, 2012. |
[3] | 施仲衡, 杨秀仁, 周庆瑞, 等. GB 50157-2013. 地铁设计规范[S]. 北京: 中国建筑工业出版社, 2013. |
[4] | 高华. 城市轨道交通车辆基地站场排水设计[J]. 铁道建筑技术, 2019(9): 49-52, 117. |