|
金沙江下游梯级水库设计洪水复核计算
|
Abstract:
金沙江下游建有乌东德~白鹤滩~溪洛渡~向家坝梯级水库,各水库初设坝址设计洪水成果采用的水文系列资料分别止于2008年、2009年、1998年和1998年。为考虑初设之后水文资料对设计成果的影响,采用华弹站、屏山站实测日径流资料及上游水库群实际运行资料,根据马斯京根法将两站序列还原并延长至2020年,进行梯级水库设计洪水复核计算。复核结果表明:1) 华弹站和屏山站设计洪水峰量的均值稍有增减(均变化0.6%左右)、Cv和Cs稍有减小,两者之比即Cs/Cv不变;2) 与原设计成果相比,乌东德、白鹤滩、溪洛渡和向家坝不同频率设计洪水的变幅基本控制在5%、3%、3%和3%以内;3) 设计洪水复核结果与初设误差基本控制在5%以内,且频率曲线也基本与原审定结果相符,可继续沿用初设成果。
There are Wudongde~Baihetan~Xiluodu~Xiangjiaba cascade reservoirs in the downstream Jinsha River, and the hydrological series data used for the design flood results of each reservoir site in the preliminary design stage end at 2008, 2009, 1998, and 1998, respectively. To consider the influence of floods on the hydrological results in the years after the preliminary design, the actual measured daily runoff data of Huatan and Pingshan hydrological station and the actual operation information of the upstream reservoir group were used, and the series of the two stations were naturalized and extended to 2020 according to the Maskingen method for the design flood recheck calculation of the cascade reservoirs. The results show that: 1) the mean values of the design flood peaks at the Huatan and Pingshan stations change slightly (both by 0.6%). Cv and Cs decrease slightly, while Cs/Cv remain unchanged; 2) the variations of the design floods of Wudongde, Baihetan, Xiluodu and Xiangjiaba with different frequencies are mainly within 5%, 3%, 3% and 3%; 3) the design floods of the cascade reservoirs in the downstream Jinsha River are within 5% of the original design error, and the flood frequency curves are basically consistent with the original audited results, which is recommended to follow.
[1] | 熊丰, 郭生练, 陈柯兵, 等. 金沙江下游梯级水库运行期设计洪水及汛控水位[J]. 水科学进展, 2019, 30(3): 401-410.
XIONG Feng, GUO Shenglian, CHEN Kebin, et al. Design flood and control water levels for cascade reservoirs during operation period in the downstream Jinsha River. Advances in Water Science, 2019, 30(3): 401-410. (in Chinese) |
[2] | 何绍坤, 郭生练, 刘攀, 等. 金沙江梯级与三峡水库群联合蓄水优化调度[J]. 水力发电学报, 2019, 38(8): 27-36.
HE Shaokun, GUO Shenglian, LIU Pan, et al. Joint and optimal impoundment operation of Jinsha River's cascade reservoirs and Three Gorges Reservoir. Journal of Hydroelectric Engineering, 2019, 38(8): 27-36. (in Chinese) |
[3] | 王俊. 2016年长江洪水特点与启示[J]. 人民长江, 2017, 48(4): 54-57+65.
WANG Jun. Characteristics and enlightenment of 2016 Changjiang River flood. Yangtze River, 2017, 48(4): 54-57+65. (in Chinese) |
[4] | 陈桂亚, 冯宝飞. “20?8”洪水金沙江流域水库群调度对川渝河段的防洪作用[J]. 长江科学院院报, 2021, 38(9): 1-6+13.
CHEN Guiya, FENG Baofei. Benefits of dispatching reservoir group on Jinsha River to flood control in Sichuan-Chongqing reach during the floods in August 2020. Journal of Yangtze River Scientific Research Institute, 2021, 38(9): 1-6+13. (in Chinese) |
[5] | 郭生练, 尹家波, 李丹, 等. 丹江口水库设计洪水复核及偏大原因分析[J]. 水力发电学报, 2017, 36(2): 1-8.
GUO Shenglian, YIN Jiabo, LI Dan, et al. Rational check of design floods for Danjiangkou Reservoir. Journal of Hydroelectric Engineering, 2017, 36(2): 1-8. (in Chinese) |
[6] | 钱名开, 孙勇, 费永法, 等. 淮河流域水文设计成果修订研究[J]. 水文, 2018, 38(5): 85-90.
QIAN Mingkai, SUN Yong, FEI Yongfa, et al. Study on the revision of hydrological design results in the Huaihe basin. Journal of China Hydrology, 2018, 38(5): 85-90. (in Chinese) |
[7] | 林荷娟, 刘敏. 太湖流域水文设计成果修订研究[J]. 水文, 2019, 39(4): 84-89.
LIN Hejuan, LIU Min. Analytical review of hydrological design for Taihu basin. Journal of China Hydrology, 2019, 39(4): 84-89. (in Chinese) |
[8] | 中华人民共和国水利部. SL 44-2006水利水电工程设计洪水计算规范[S]. 北京: 中国水利水电出版社, 2006.
Ministry of Water Resources. SL 44-2006 Design flood calculation regulations for water resources and hydropower engineering. Beijing: Hydropower and Electrical Press, 2006. (in Chinese) |
[9] | 熊丰, 郭生练, 杨浩, 等. 气候变化及水利工程综合影响下的三峡水库超标准设计洪水[J]. 水资源研究, 2021, 10(5): 449-458.
XIONG Feng, GUO Shenglian, YANG Hao, et al. Hyper standard design flood of Three Gorges Reservoir under the influence of climate change and hydraulic engineering. Journal of Water Resources Research, 2021, 10(5): 449-458. (in Chinese) |
[10] | 郭生练, 刘章君, 熊立华. 设计洪水计算方法研究进展与评价[J]. 水利学报, 2016, 47(3): 302-314.
GUO Shenglian, LIU Zhangjun, and XIONG Lihua. Advances and assessment on design flood estimation methods. Journal of Hydraulic Engineering, 2016, 47(3): 302-314. (in Chinese) |