张文亮,武斌,李武峰,等.我国纯电动汽车的发展方向及能源供给模式的探讨[J].电网技术,2009,33(4):1-5.Zhang Wenliang,Wu Bin,Li Wufeng,et al.Discussion on development trend of battery electric vehicles in China and its energy supply mode[J].Power System Technology,2009,33(4):1-5(in Chinese).
[2]
宋永华,阳岳希,胡泽春.电动汽车电池的现状及发展趋势[J].电网技术,2011,35(4):1-7.Song Yonghua,Yang Yuexi,Hu Zechun.Present status and development trend of batteries for electric vehicles[J].Power System Technology,2011,35(4):1-7(in Chinese).
[3]
Smith M.Batteries versus biomass as a transport solution[J].Nature,2009,457(7231):785.
[4]
张维戈,张帝,温家鹏,等.电动公交更换式充电站的优化设计[J].北京交通大学学报,2012,36(2):100-104.Zhang Weige,Zhang Di,Wen Jiapeng,et al.Optimized design of electric bus battery swap station[J].Journal of Beijing Jiaotong University,2012,36(2):100-104(in Chinese).
[5]
张维戈,颉飞翔,黄梅,等.快换式公交充电站短期负荷预测方法的研究[J].电力系统保护与控制,2012,40(11):61-66.Zhang Weige,Xie Feixiang,Huang Mei,et al.Research on short-term load forecasting methods of electric buses charging station[J].Power System Protection and Control,2012,40(11):61-66(in Chinese).
[6]
李娜,黄梅.不同类型电动汽车充电机接入后电力系统的谐波分析[J].电网技术,2011,35(1):170-174.Li Na,Huang Mei.Analysis on harmonics caused by connecting different types of electric vehicle chargers with power network[J].Power system Technology,2011,35(1):170-174(in Chinese).
[7]
黄梅,黄少芳.电动汽车充电站谐波的工程计算方法[J].电网技术,2008,32(20):20-23.Huang Mei,Huang Shaofang.A harmonic engineering calculation method for electric vehicle charging station[J].Power system Technology,2008,32(20):20-23(in Chinese).
[8]
李亚芬,黄梅,张维戈.电动出租车日负荷估算方法[J].电力系统自动化,2014,38(10):55-60.Li Yafen,Huang Mei,Zhang Weige.An estimation method of daily charging load of electric taxis[J].Automation of Electric Power Systems,2014,38(10):55-60(in Chinese).
[9]
李如琦,苏浩益.基于排队论的电动汽车充电设施优化配置[J].电力系统自动化,2011,35(14):58-61.Li Ruqi,Su Haoyi.Optimal allocation of charging facilities for electric vehicles based on queuing theory[J].Automation of Electric Power Systems,2011,35(14):58-61(in Chinese).
[10]
熊虎,向铁元,祝勇刚,等.电动汽车公共充电站布局的最优规划[J].电力系统自动化,2012,36(23):65-70.Xiong Hu,Xiang Tieyuan,Zhu Yonggang,et al.Electric vehicle public charging stations location optimal planning[J].Automation of Electric Power Systems,2012,36(23):65-70(in Chinese).
[11]
葛少云,冯亮,刘洪,等.考虑车流信息与配电网络容量约束的充电站规划[J].电网技术,2013,37(3):582-589.Ge Shaoyun,Feng Liang,Liu Hong,et al.Planning of charging stations considering traffic flow and capacity constraints of distribution network[J].Power System Technology,2013,37(3):582-589(in Chinese).
Kimura,Toshikazu.Diffusion approximation for an M/G/m queue [J].Operations Research,1983,31(2):304-321.
[16]
张智勇,荣建,郑弘,等.基于M/G/K排队模型的北京地区高速公路收费站通行能力研究[J].公路,2001(7):128-133.Zhang Zhiyong,Rong Jian,Zheng Hong,et al.The capacity of expressway toll-gate on the basis of M/G/K queuing model in Beijing region[J].Journal of Highway,2001(7):128-133(in Chinese).
[17]
廖固.高速公路收费站通行能力分析[J].公路工程,2010,35(3):153-155.Liao Gu.Analysis of expressway tollgate capacity[J].Highway Engineering,2010,35(3):153-155(in Chinese).