随机供给与随机需求的交通网络设计模型

, PP. 67-74

Keywords: 交通规划,离散交通网络,不确定性理论,双层规划理论,蒙特卡洛模拟,遗传算法

Full-Text   Cite this paper   Add to My Lib

Abstract:

为了改进以确定供给与确定需求为基础的传统交通网络设计方案,根据双层规划理论与交通分配理论,建立了基于随机供给与随机需求的离散交通网络设计模型。将MonteCarlo模拟、遗传算法和交通分配算法应用于模型求解过程,并应用Nguyen-Dupuis交通网络求解模型。计算结果表明当OD需求增大时,总走行时间增大;当建设预算增大时,总走行时间下降;当供给与需求均不确定时,增加建设预算对降低总走行时间的效果更加明显;在不同工况下,总走行时间最大值为1.69×105h,最小值为8.89×104h;当OD需求均值为350veh?h-1,建设预算从1000万元增大到1500万元,且供给确定时,总走行时间下降3.47%。供给与需求的不确定程度对交通网络的设计方案具有重要影响。

References

[1]  YANG Hai, BELL M G H. Models and algorithms for road network design: a review and some new developments[J]. Transport Reviews, 1998, 18(3): 257-278.
[2]  WONG S C, YANG Hai. Reserve capacity for a signal controlled road network[J]. Transportation Research Part B: Methodological, 1997, 31(5): 397-402.
[3]  许 良,高自友.基于连通可靠性的城市道路交通离散网络设计问题[J].燕山大学学报,2007,31(2):159-163. XU Liang, GAO Zi-you. Urban road transportation discrete network design based on connectivity reliability[J]. Journal of Yanshan University, 2007, 31(2): 159-163.(in Chinese)
[4]  刘娟娟,范炳全,祝炳发.双层规划在城市交通污染控制中的一个应用[J].管理工程学报,2005,19(4):87-90. LIU Juan-juan, FAN Bing-quan, ZHU Bing-fa. An apply of bilevle programming in the urban transport pollution control[J]. Journal of Industrial Engineering and Engineering Management, 2005, 19(4): 87-90.(in Chinese)
[5]  MENG Qiang, YANG Hai. Benefit distribution and equity in road network design[J]. Transportation Research Part B: Methodological, 2002, 36(1): 19-35.
[6]  FRIESZ T L, ANANDALINGAM G, MEHTA N J, et al. The multiobjective equilibrium network design problem revisited: a simulated annealing approach[J]. European Journal of Operational Research, 1993, 65(1): 44-57.
[7]  TZENG G H, TSAUR S H. Application of multiple criteria decision making for network improvement plan model[J]. Journal of Advanced Transportation, 1997, 31(1): 48-74.
[8]  UKKUSUI S V, MATHEW T V, WALLER S T. Robust transportation network design under demand uncertainty[J]. Computer-Aided Civil and Infrastructure Engineering, 2007, 22(1): 6-18.
[9]  YIN Ya-feng, MADANAT S M, LU Xiao-yun. Robust improvement schemes for road networks under demand uncertainty[J]. European Journal of Operational Research, 2009, 198(2): 470-479.
[10]  WATLING D. A second order stochastic network equilibrium model, I: theoretical foundation[J]. Transportation Science, 2002, 36(2): 149-183.
[11]  CLARK S, WATLING D. Modeling network travel time reliability under stochastic demand[J]. Transportation Research Part B: Methodological, 2005, 39(2): 119-140.
[12]  SHAO Hu, LAM W H K, TAM M L. A reliability-based stochastic traffic assignment model for network with multiple user classes under uncertainty in demand[J]. Networks and Spatial Economics, 2006, 6(3): 173-204.
[13]  KAROONSOONTAWONG A, WALLER S T. Integrated network capacity expansion and traffic signal optimization problem: robust bi-level dynamic formulation[J]. Network and Spatial Economics, 2009, 10(4): 525-550.
[14]  CHEN A, YANG Hai, LO H K, et al. A capacity related reliability for transportation network[J]. Journal of Advanced Transportation, 1999, 33(2): 183-200.
[15]  LO H K, LUO X W, SIU B W Y. Degradable transport network: travel time budget of travellers with heterogeneous risk aversion[J]. Transportation Research Part B: Methodological, 2006, 40(9): 792-806.
[16]  SIU B W Y, LO H K. Doubly uncertain transportation network: degradable capacity and stochastic demand[J]. European Journal of Operational Research, 2008, 191(1): 166-181.
[17]  LAM W H K, SHAO Hu, SUMALEE A. Modeling impacts of adverse weather conditions on a road network with uncertainties in demand and supply[J]. Transportation Research Part B: Methodological, 2008, 42(10): 890-910.
[18]  NGUYEN S, DUPUIS C. An efficient method for computing traffic equilibria in networks with asymmetric transportation costs[J]. Transportation Science, 1984, 18(2): 185-202.
[19]  陆化普,蔚欣欣,卞长志.发生吸引量不确定的离散交通网络设计模型[J].统计与决策,2011(6):8-12. LU Hua-pu, YU Xin-xin, BIAN Chang-zhi. Model and algorithm of discrete network design problem under trip production-attraction uncertainty[J]. Statistics and Decision, 2011(6): 8-12.(in Chinese)

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133