郝立光,张星臣.列车流到发车站的均衡性评价方法研究[J].铁道学报,2000,22(5):13-16. HAO Li-guang, ZHANG Xing-chen. Study on equilibrium evaluation of train flow arrived at and departure from a station[J]. Journal of the China Railway Society, 2000, 22(5): 13-16.(in Chinese)
[2]
梁明珠,赵 华.路网、区域性编组站现状评价及对策研究[J].中国铁道科学,2001,22(3):21-26. LIANG Ming-zhu, ZHAO Hua. Study on railway network and regional marshalling yard assessment and counter-measure[J]. China Railway Science, 2001, 22(3): 21-26.(in Chinese)
[3]
王万平,谢海红.非均衡运输条件下技术站能力计算方法的初步探讨[J].北方交通大学学报,2002,26(1):98-102. WANG Wan-ping, XIE Hai-hong. Primary study on calculation methods of technological station capacity under unbalanced transportation conditions[J]. Journal of Northern Jiaotong University, 2002, 26(1): 98-102.(in Chinese)
[4]
李海鹰,杨肇夏.基于不均衡运输的编组站能力计算方法探讨[J].北京交通大学学报,2005,29(6):9-12. LI Hai-ying, YANG Zhao-xia. Computation of capacity at marshalling yard based on imbalanced transport circumstances[J]. Journal of Beijing Jiaotong University, 2005, 29(6): 9-12.(in Chinese)
[5]
李海鹰,张 超.编组站到解系统通过能力计算方法[J].中国铁道科学,2010,31(3):120-125. LI Hai-ying, ZHANG Chao. Calculation method for the carrying capacity of the arriving and breaking up system in marshalling yard[J]. China Railway Science, 2010, 31(3): 120-125.(in Chinese)
[6]
王 焱.提速后不均衡运输对大型编组站能力的影响分析[D].北京:北京交通大学,2007. WANG Yan. Analysis of influence of unbalanced transport on the capacity of large marshalling yard after speeding-up[D]. Beijing: Beijing Jiaotong University, 2007.(in Chinese)
[7]
熊 坚,漆 昕,刘正喜.车流不均衡条件下编组站作业组织研究[J].铁道运输与经济,2011,33(8):5-9. XIONG Jian, QI Xin, LIU Zheng-xi. Operation organization of marshalling yard under unbalanced traffic flow[J]. Railway Transport and Economy, 2011, 33(8): 5-9.(in Chinese)
[8]
MORLOK E K, CHANG D J. Measuring capacity flexibility of a transportation system[J]. Transportation Research Part A: Policy and Practice, 2004, 38(6): 405-420.
[9]
YUAN Jia-xin, HANSEN I A. Optimizing capacity utilization of stations by estimating knock-on train delays[J]. Transportation Research Part B: Methodological, 2007, 41(2): 202-217.
[10]
D'ARIANO A, PACCIARELLI D, PRANZO M. A branch and bound algorithm for scheduling trains in a railway network[J]. European Journal of Operational Research, 2007, 183(2): 643-657.
[11]
D'ARIANO A, CORMAN F, PACCIARELLI D, et al. Reordering and local rerouting strategies to manage train traffic in real-time[J]. Transportation Science, 2008, 42(4): 405-419.
[12]
CORMAN F, D'ARIANO A, PACCIARELLI D, et al. A tabu search algorithm for rerouting trains during rail operations[J]. Transportation Research Part B: Methodological, 2010, 44(1): 175-192.
[13]
曲思源,徐行方.既有繁忙干线时段性通过能力规划模型及算法[J].交通运输工程学报,2010,10(1):77-81. QU Si-yuan, XU Xing-fang.Planning model and calculating method of period carrying capacity on busy existed railway main-lines[J]. Journal of Traffic and Transportation Engin-eering, 2010, 10(1): 77-81.(in Chinese)
[14]
汤 波,雷定猷,张英贵,等.铁路车站咽喉通过能力计算方法[J].交通运输工程学报,2010,10(6):69-74. TANG Bo, LEI Ding-you, ZHANG Ying-gui, et al. Calculating method of carrying capacity for railway station bottleneck[J]. Journal of Traffic and Transportation Engineering, 2010, 10(6): 69-74.(in Chinese)
[15]
刘 敏,韩宝明,李得伟.高速铁路车站通过能力计算和评估[J].铁道学报,2012,34(4):9-15. LIU Min, HAN Bao-ming, LI De-wei. Calculation and evaluation of carrying capacities at high-speed railway stations[J]. Journal of the China Railway Society, 2012, 34(4): 9-15.(in Chinese)
[16]
田亚明.铁路网编组站改变能力配置优化模型[J].铁道学报,2013,35(6):6-12. TIAN Ya-ming. Railway marshalling yards reclassification capacity configuration optimization model[J]. Journal of the China Railway Society, 2013, 35(6): 6-12.(in Chinese)
[17]
曲思源.不均衡运输条件下车流调整的优化[J].铁道运输与经济,2007,29(2):41-43,52. QU Si-yuan.Optimization for wagon-flow adjustment under unbalanced transportation conditions[J]. Railway Transport and Economy, 2007, 29(2): 41-43, 52.(in Chinese)
[18]
杨运贵.铁路车站能力的计算方法与查定技术研究[D].成都:西南交通大学,2010. YANG Yun-gui. Study on calculating methods and investigating-determining technologies of railway station capacity[D]. Chengdu: Southwest Jiaotong University, 2010.(in Chinese)
[19]
孟令云,杨肇夏,李海鹰.单线铁路区间能力失效条件下列车运行调整模型[J].系统工程理论与实践,2012,32(4):885-894. MENG Ling-yun, YANG Zhao-xia, LI Hai-ying. Train dispatching models under field capacity breakdowns on single-track railway lines [J]. Systems Engineering―Theory andPractice, 2012, 32(4): 885-894.(in Chinese)
[20]
郑建东.成都北站组号数量对驼峰解体能力的影响分析[J].铁道运输与经济,2013,35(6):43-45,70. ZHENG Jian-dong. Analysis on influence of group indication number in Chengdu North Station on hump uncoupling capacity[J]. Railway Transport and Economy, 2013, 35(6): 43-45, 70.(in Chinese)
[21]
LUKASZEWICZ P. Energy consumption and running time for trains: modelling of running resistance and driver behavior based on full scale testing [D]. Stockholm: KTH Royal Institute of Technology, 2001.