[1] Adeli H,Jiang X M.Neuro-fuzzy logic model for freeway work zone capacity estimation[J].Journal of Transportation Engineering,2003,129(5):484-493.
[2]
[2] Radhakrishnan R V,Sun C,Bham G H,et al.Traffic flow characteristics of a congested work zone in Missouri[C]// Proceedings of the 2007 Mid-Continent Transportation Research Symposium.Ames,Iowa:Iowa State University,2007.
[3]
[3] Khattak A J,Khattak A J,Council F M.Effects of work zone presence on injury and non-injury crashes[J].Accident Analysis and Prevention,2002,34(1):19-29.
[4]
[4] Federal Highway Administmtion (FHWA).National Highway Work Zone Safety Program[S].Washington,D. C.:Airport Planning and Programming,1995.
[5]
[7] Transportation Research Board.Highway Capacity Manual[M].4th ed.Washington,D.C.:Transportation Research Board,2000.
Zhang Xiuhong,Hu Gang,Fu Hui.Study on the traffic flow distribution at construction area on the urban road[J].Western China Communications Science & Technology,2011(12):13-18.
Shi Haiman,Liu Wei.Right of way and traffic flow distribution in case of lanes occupied by construction[J].Transportation Standardization,2011(24):119-123.