Zhou Huaxing,Zheng Baoyou,Li Jinhe.An approach to the limiting value for the flow conditions at the entrance area of shiplock approach channel[J].Port & Waterway Engineering,2002(1):38-42.
Lu Wenlei,Chen Zuoqiang.Study of navigation flow condition of the entrance area and the connecting section of the navigation structures[J].Southwest Highway,2008(3):69-75.
Liu Xin,Ma Dianguang,Zhao Jiaqiang.Flow conditions and improvement measures in Goupitan hydro-power station downstream[J].Port & Waterway Engineering,2009(9):118-123.
Wang Bo,Cheng Zibing,Jin Feng.Hydraulic experimental study of hollow-type separation levee of approach channel in hydropower station[J].Yangtze River,2012,43(7):67-69.
Chen Guifu,Zhang Xiaoming,Wang Zhaobing.Influence of open-type guide works on flow condition for navigation of shiplock[J].Port & Waterway Engineering,2006(9):56-59.
Yang Wenjun,Sun Eryu,Yang Wei,et al.Research on the influence of unsteady flow produced by operation of TGP on navigation :upper and lower access channels[J].Journal of Hydroelectric Engineering,2006,25(1):45-49.
Dai Huichao,Zhu Hongbing.Research of navigable channel scheme and sediment deposit in Three Gorges project[J].Journal of Hydroelectric Engineering,2005,24(2):46-51.
Cheng Yongkui,Wang Lie,Yang Chun,et al.Investigation on oblique flow characteristics in upstream approach entrance region of Tgp’S lock[J].Journal of Yangtze River Scientific Research Institute,1999,16(2):1-6.