Shen Jin’an,Li Fupu,Chen Jing,et al.Analysis and Preventive Techniques of Premature Damage of Asphalt Pavemeat in Expressway[M].Beijing:China Communications Press,2004:157-218.
[4]
[3] 黄卫,黄振东.高等沥青路面设计理论与方法[M].北京:科学出版社,2001:29-38.
[5]
Huang Wei,Huang Zhendong.Advanced Asphalt Pavement Design Theory and Method [M].Beijing:Science Press,2001:29-38.
[6]
[4] Huang Y H.Pavement Analysis and Design [M].Upper Saddle River:Pearson Education,Inc.,2004:76-93.
[7]
[7] 张肖宁.沥青与沥青混合料的黏弹力学[M].北京:人民交通出版社,2006:173-196.
[8]
Zhang Xiaoning.Study of Asphalt and Asphalt Mixture Sticky Elastic Mechanics [M].Beijing:China Communications Press,2006:173-196.
Liao Gongyun,Huang Xiaoming.The Application of ABAQUS Finite Element Software in Road Engineering [M].Nanjing: Southeast University Press,2008:200-225.
Zhang Jiupeng,Pei Jianzhong,Wang Binggang.Analysis of asphalt pavement rutting in continuously changing temperature field and early warning for high temperature [J].Journal of Tongji University:Natural Science,2011,39(2):242-246.
[13]
[10]Hua J.Finite Element Modeling and Analysis of Accelerated Pavement Testing Devices and Phenomenon [D].West Lafayette:Purdue University,2000.