LIU Zhi-gang,LIU Xiu-feng.Determination of Tunnel Fault by the Method of Fault Parameter Forecast[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(9):1547-1550.
[2]
WANG Chang-hong,YANG You-hai.The Elastic-visco Displacement Back Analysis of Wushaoling Tunnel F7 Fault[J].Journal of the China Railway Society,2007,29(2):132-135.
[3]
HU Zhi-ping,PENG Jian-bing,HUANG Qiang-bing,et al.Physical Modeling Test on Shield Tunnel Crossing Ground Fissure with 30°[J].Journal of Chang'an University:Natural Science Edition,2009,29(4):63-68.
[4]
LIU Ai-wen,HU Yu-xian,LI Xiao-jun,et al.Damage Behavior of Large-diameter Buried Steel Pipelines Under Fault Movements[J].Engineering Mechanics,2005,22(3):82-87.
[5]
ZHANG Su-ling,XU Jian-dong,CAO Hua-ming,et al.A Study of Buried Pipeline Damages Caused by Earthquake Faulting[J].Seismology and Geology,2001,23(3):432-438.
[6]
LIU Ai-wen,HU Yu-xian,ZHAO Feng-xin,et al.An Equivalent-boundary Method for the Shell Analysis of Buried Pipelines Under Fault Movement[J].Acta Seismologica Sinica,2004,26(S1):141-147.
[7]
FENG Qi-min,ZHAO Lin.Buckling Analysis of Buried Pipes Subjected to Fault Movements[J].Earthquake Engineering and Engineering Vibration,2001,21(4):80-87.
[8]
LIN Jun-qi,HU Ming-yi.Seismic Responses of Buried Pipeline Crossing Fault[J].Journal of Earthquake Engineering and Engineering Vibration,2007,27(5):129-133.
[9]
WANG Tong-ning,LIU Jian-xin,YU Yong-bo.Spatial Dynamic Analysis of Isolated Bridges Subjected to Near-fault Ground Motion [J].Journal of Traffic and Transportation Engineering,2009,9(5):20-25.
[10]
SHI Yu-ling,MEN Yu-ming,LIU Yang,et al.Research on the Destruction Mechanism of City Overpass by Ground Fissure in Xi'an City and the Controlling Measures[J].Journal of Earth Sciences and En-vironment,2009,31(1):89-93.
[11]
JIANG Tao,XU Wei-ya,CHEN Hong,et al.Numer-ical Analysis of Stability for Rock Mass in Arch Dam Abutment Impacted by Fault and Simulation of Fault Treatment[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(S2):5840-5844.
[12]
WANG Jin-an,LIU Hang,LI Tie.Study on Numer-ical Simulation of Dynamic Risk Regionalization During Exploitation Approaching to Faults[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(1):28-35.
[13]
JIANG Zhong-ming,FU Sheng,LI Shang-gao,et al.High Pressure Permeability Test on Hydraulic Tunnel with Steep Obliquity Faults Under High Pressure[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(11):2318-2323.
[14]
LIU Xue-zeng,HAMADA M.Experiments on Rupture Propagation of Active Faults in Soil[J].Chinese Journal of Geotechnical Engineering,2004,26(3):425-427.
[15]
DENG Long-sheng,FAN Wen,PENG Jian-bing,et al.Study on the Break-down Mechanism of Road Structure Induced by Dip-slip Active Fault[J].Journal of Safety and Environment,2009,9(3):123-131.
[16]
BRANDT J R T.Behavior of Soil-concrete Interfaces[D].Alberta:The University of Alberta,1985.
[17]
CHEN Hui-yuan.Study on the Friction Contact Element[J].Journal of Hydraulic Engineering,1985(4):44-49.
[18]
LIU Yu-hai.The Classification and Evaluation of Active Faults in Engineering Geology[J].Journal of Xi'an College of Geology,1987,9(4):40-47.
[19]
HUANG Sheng-wen,SI Tie-han,CHEN Wen-sheng,et al.Finite Element Analyses of Influence of Fault on Large-span Tunnel Surrounding Rock Stress[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(S2):3788-3793.