全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

基于平衡更新过程的既有桥梁车辆荷载效应模型

, PP. 50-56

Keywords: 桥梁工程,桥梁荷载,平衡更新过程,车辆荷载效应,截尾分布,卷积公式

Full-Text   Cite this paper   Add to My Lib

Abstract:

?将不同车辆组成的车队等效成均布荷载,假定车辆匀速行驶于桥梁上,采用卷积公式计算不同车辆连续到达间距及总重的概率密度函数,应用平衡更新过程理论推导车队长度概率函数,依据中国现有车辆荷载统计数据,建立了既有公路桥梁车辆荷载效应模型。该模型通过截尾分布限定其中各参数的最大值、最小值来反映不同交通类型,通过影响线传递函数反映不同桥梁结构形式。研究结果表明:车辆间距、车长、车重及车速的分布是决定车辆荷载效应模型的关键;该模型适用于既有公路桥梁时变可靠性和剩余寿命评估。

References

[1]  NOWAK A S.Live Load Model for Highway Bridges[J].Structural Safety, 1993, 13(1/2):53-66.
[2]  NOWAK A S, FERRAND D M.Truck Load Models for Bridges[C]//BLANDFORD G E.Structures 2004-Building on the Past:Securing the Future (Proceeding of the 2004 Structures Congress).Nashville:ASCE, 2004:1-10.
[3]  GINDY M.Development of a Reliability-based Deflection Limit State for Steel Girder Bridges[D].Jersey City:The State University of New Jersey, 2004.
[4]  MIAO T J, CHAN T H T.Bridge Live Load Models from WIM Data[J].Engineering Structures, 2002, 24(8):1071-1084.
[5]  CRESPO-MINGUILLON C, CASAS J R.A Comprehensive Traffic Load Model for Bridge Safety Checking[J].Structural Safety, 1997, 19(4):339-359.
[6]  FU G K, HAG-ELSAFI O.Vehicular Overloads:Load Model, Bridge Safety, and Permit Checking[J].Journal of Bridge Engineering, 2000, 5(1):49-57.
[7]  VU K A T, STEWART M G.Structural Reliability of Concrete Bridges Including Improved Chloride-induced Corrosion Models[J].Structural Safety, 2000, 22(4):313-333.
[8]  DITLEVSEN O.Traffic Loads on Large Bridges
[9]  DITLEVSEN O, MADSEN H O.Stochastic Vehicle-queue-load Model for Large Bridges[J].Journal of Engineering Mechanics, 1994, 120(9):1829-1847.
[10]  LI Guang-hui, ZHANG Cun-chao, WANG Dong-wei, et al.Study on Live Load Parameter for Highway Bridge[J].Journal of Zhengzhou University:Engin-eering Science, 2005, 26(1):20-23.
[11]  YANG Wei-jun, LIANG Xing-wen, ZHANG Jian-ren.Analysis on Evaluation Loads on Service Bridges[J].Central South Highway Engineering, 2002, 27(3):31-33.
[12]  SUO Qing-hui, QIAN Yong-jiu, ZHANG Fang.Study of the Variable Load While Estimating Existing Bridge Structure[J].Engineering Science, 2004, 6(5):52-55.
[13]  GB/T 50283—1999, Unified Standard for Reliability Design of Highway Engineering Structures[S].
[14]  HE Shuan-hai, LU Ying-zhao.Reliability Research of Existing Reinforced Concrete Structures[J].Journal of Architecture and Civil Engineering, 2005, 22(1):71-75.
[15]  WANG Lei, ZHANG Jian-ren.Simulation on Different Vehicle Continuous Arrivals on Existing Highway Bridges[J].Journal of China & Foreign Highway, 2008, 28(2):83-88.
[16]  梁之舜, 邓永录.随机点过程及其应用[M].北京:科学出版社, 1998.
[17]  NOWAK A S, NASSIF H, DEFRAIN L.Effect of Truck Loads on Bridges[J].Journal of Transportation Engineering, 1993, 119(6):853-867.
[18]  CREMONA C.Optimal Extrapolation of Traffic Load Effects[J].Structural Safety, 2001, 23(1):31-46.
[19]  MIAO T J.Bridge Live Load Models with Special Reference to Hong Kong[D].Hong Kong:The Hong Kong Polytechnic University, 2001.
[20]  O'CONNOR A, O'BRIEN E J.Traffic Load Modelling and Factors Influencing the Accuracy of Predicted Extremes[J].Canadian Journal of Civil Engineering, 2005, 32:270-278.
[21]  CROCE P, SALVATORE W.Stochastic Model for Multilane Traffic Effects on Bridges[J].Journal of Bridge Engineering, 2001, 6(2):136-143.
[22]  MEI G, QIN Q, LIN D J.Bimodal Renewal Processes Models of Highway Vehicle Loads[J].Reliability Engineering & System Safety, 2004, 83(3):333-339.
[23]  KOBZA J E, SHEN Y C, REASOR R J.A Stochastic Model of Empty-vehicle Travel Time and Load Request Service Time in Light-traffic Material Handling Systems[J].IIE Transactions, 1998, 30(2):133-142.
[24]  Modeled as White-noise Fields[J].Journal of Engin-eering Mechanics, 1994, 120(4):681-694.
[25]  李广慧, 张存超, 王东炜, 等.高速公路桥梁活荷载参数研究[J].郑州大学学报:工学版, 2005, 26(1):20-23.
[26]  杨伟军, 梁兴文, 张建仁.服役桥梁评估荷载分析[J].中南公路工程, 2002, 27(3):31-33.
[27]  索清辉, 钱永久, 张 方.对公路桥梁剩余寿命评估时可变荷载取值的研究[J].中国工程科学, 2004, 6(5):52-55.
[28]  GB/T 50283—1999, 公路工程结构可靠度设计统一标准[S].
[29]  贺拴海, 吕颖钊.考虑材料耐久性的在役混凝土结构可靠度研究[J].建筑科学与工程学报, 2005, 22(1):71-75.
[30]  王 磊, 张建仁.既有公路桥梁不同车辆荷载连续到达过程模拟[J].中外公路, 2008, 28(2):83-88.
[31]  刁元盛.积分变换——工程数学[M].广州:华南理工大学出版社, 2003.
[32]  DIAO Yuan-sheng.Integral Transformation-Engin-eering Mathematics[M].Guangzhou:South China University of Technology Press, 2003.
[33]  LIANG Zhi-shun, DENG Yong-lu.Stochastic Point Process and Its Application[M].Beijing:Science Press, 1998.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133