EISENSTEIR Z D.Large Undersea Tunnels and the progress of Tunnel Lining Technology
[5]
[J].Tunnel Ling and Underground Space Technology,1994,9(3):283-292.
[6]
李德武.断层破碎带隧道衬砌受力特性研究
[7]
[J].岩石力学与工程学报,2005,24 (7):1274-1275.LI Dewu.Research on the Stress Features of Tunnel Lining in the Fault-rupture Zone
[8]
[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(7):1274-1275.
[9]
姜忻良,宋丽梅.软土地层中地下隧道结构地震反应分析
[10]
[J].地震工程与工程振动,1999,19 (1):65-69.JIANG Xinliang,SONG Limei.Seismic Response Analysis of Underground Tunnel in Soft Soil
[11]
[J].Earthquake Engineering And Engineering Vibration,1999,19 (1):65-69.
[12]
熊良宵.活断层地区隧道抗震问题的数值模拟研究
[13]
[D].成都:成都理工大学,2006.XIONG Liangxiao.Anti-seismic Numerical Simulation Study of Tunnel in Active Fault Areas
[14]
[D].Chengdu:Chengdu University of Technology,2006.
[15]
李育枢.山岭隧道地震动力响应及减震措施研究
[16]
[D].上海:同济大学,2006.LI Yushu.Study on Earthquake Responses and Vibrationabsorption Measures for Mountain Tunnel
[17]
[D].Shanghai:Tongji University,2006.
[18]
HASHASH Y,HOOK J J,SCHMIDT B,et al.Seismic Design and Analysis of Underground Structures
[19]
[J].Tunnelling and Underground Space Technology,2001,16(4):247-293.
[20]
高峰,李德武.隧道三维地震反应分析若干问题的研究
[21]
[J].岩土工程学报,1998,20 (4):48-53.GAO Feng,LI Dewu.A study on Some Problems Concerning 3D Analysis of Seismic Responses of Tunnels
[22]
[J].Chinese Journal of Geotechnical Engineering,1998,20 (4):48-53.
[23]
黄胜,陈卫忠,杨建平,等.地下工程地震动力响应及抗震研究
[24]
[J].岩石力学与工程学报,2009,28(3):483-490.HUANG Sheng,CHEN Weizhong,YANG Jianping,et al.Research on Earthquake-induced Dynamic Responses and Aseismic Measures for Underground Engineering
[25]
[J].Chinese Journal of Rock Mechanics and Engineering,2009,28 (3):483-490.
[26]
伍国军,陈卫忠,刘豆豆,等.基于连续介质模型的隧道衬砌结构可靠性研究
[27]
[J].岩土力学,2006,27(s1):359-363.WU Guojun,CHEN Weizhong,LIU Doudou,et al.Reliability Analysis of Tunnel Lining Based on Continuum Model
[28]
[J].Rock and soil mechanics,2006,27 (s1):359-363.
[29]
甘肃省交通规划勘察设计院有限责任公司.华亭至庄浪二级公路两阶段施工图设计
[30]
[R].兰州:甘肃省交通规划勘察设计院有限责任公司,2004.Gansu Provincial Transportation Planning,Survey and Design Institute Co.Ltd.Huating to Zhuanglang Secondclass Highway Construction Documents Design in Two Stages
[31]
[R].Lanzhou:Gansu Provincial Transportation Planning,Survey and Design Institute Co.Ltd,2004.
[32]
韩友续、李德武、谢永利,等.关山隧道断层破碎带衬砌受力特性及承压水处置技术研究
[33]
[R].兰州:兰州交通大学,2007.HAN Youxu,LI Dewu,XIE Yongli.Research of Lining Mechanical Behavior in Fault Zone and Confined Water Disposal Technology of Guanshan Tunnel
[34]
[R].Lanzhou:Lanzhou Jiaotong University,2004.
[35]
阎盛海.地下结构抗震
[36]
[M].大连:大连理工大学出版社,1989.YAN Shenghai.Earthquake Resistance of Underground Structures
[37]
[M].Dalian:Dalian University of Technology Press,1989.
[38]
严松宏,梁波,高波.地下结构纵向抗震动力可靠度分析
[39]
[J].岩石力学与工程学报,2005,24(1):73-78.YANSonghong,LIANG Bo,GAO Bo.Dynamic Analysis of Longitudinal Aseismic Reliability of Underground Structures
[40]
[J].Chinese Journal of Rock Mechanics and Engineering,2005,24 (1):73-78.