[M].北京:人民交通出版社,2002.ZHANG Qisen,ZHANG Yaping.The Research of Road Capacity
[3]
[M].Beijing:China Communications Press,2002.
[4]
杨小宝,张宁,黄留兵.通行能力仿真中的换道模型研究
[5]
[J].公路交通科技,2007,24(5):109-112.YANG Xiaobao,ZHANG Ning,HUANG Liubing.Lane Changing Model in Road Capacity Simulation
[6]
[J].中国市政工程,2007(6):4-6.ZENG Shengnan,BAI Xu,DU Yuchuan,et al.Research of Free Speed on Shanghai Urban Expressway Based on Statistics
[7]
[J].China Municipal Engineering,2007 (6):4-6.
[8]
李洪萍,裴玉龙,杨中良.快速路自由流速度及其影响因素
[9]
[J].吉林大学学报,2007,37(4):772-776.LI Hongping,PEI Yulong,YANG Zhongliang.Factors Influencing Free Speed on Expressway
[10]
[J].Journal of Jilin University,2007,37 (4):772-776.
[11]
[J].Journal of Highway Transportation Research and Development,2007,24(5):109-112.
[12]
荣建,刘小明,任福田,等.基于跟驰时间和随机因素的通行能力理论计算模型
[13]
[J].中国公路学报,2001,14(3):81-85.RONG Jian,LIU Xiaoming,REN Futian,et al.Theoretic Capacity Model Considering with Variable Following Time and Random Factors
[14]
[J].China Journal of Highway and Transport,2001,14(3):81-85.
[15]
刘江,荣建,任福田.基于可变减速时间的通行能力理论模型研究
[16]
[J].武汉理工大学学报,2005,29(6):891-894.LIU Jiang,RONG Jian,BEN Futian.Theoretical Model of Highway Capacity Based on Variable Deceleration Time
[17]
[J].Journal of Wuhan University of Technology,2005,29(6):891-894.
Transportation Research Board.Highway Copacity Manual
[23]
[M/CD].Washington,D.C.:TRB,National Research Council,2000.
[24]
钟连德,荣建,周荣贵,等.城市快速路路与高速公路交通流特性的对比分析
[25]
[J].公路交通科技,2005,22(1):48-51.ZHONG Liande,RONG Jian,ZHOU Ronggui,et al.Contrasting Analysis of Traffic Stream Characteristics between Urban and Intercity Expressways
[26]
[J].Journal of Highway and Transportation Research and Development,2005,22 (1):48-51.
[27]
钟连德,李秀文,荣建,等.城市快速路基本路段通行能力的确定
[28]
[J].北京工业大学学报,2006,32(7):605-609.ZHONG Liande,LI Xiuwen,RONG Jian,et al.Confirmation of the Capacity of Urban Expressway Basic Segment
[29]
[J].Journal of Beijing University of Technology,2006,32 (7):605-609.