陈淮,吴红升,唐军.蒲山系杆拱桥吊杆张拉力的空间 计算分析[J].铁道科学与工程学报,2008,5(2): 12-16.CHEN Huai, WU Hong-sheng, TANG Jun.Spatial Analysis of Suspender Tensile Force for the Pushan CFST through Arch Bridge[J].Journal of Railway Science and Engineering,2008,5(2): 12-16.
[2]
吴文清,王成树,刘国昌,等.大跨度系杆拱桥柔性吊杆张力监测和参数识别研究[J].公路交通科技, 2007,24(1): 69-73.WU Wen-qing,WANG Cheng-shu,LIU Guo-chang,et al.Flexible Hanger Rods Tension Measurement and Parameter Identification in Large-span Tied Arch Bridge [J].Journal of Highway and Transportation Research and Development,2007,24(1): 69-73.
[3]
黄侨,吴红林,杨大伟.确定斜拉桥成桥索力多约束条件下最小能量法[J].哈尔滨工业大学学报, 2007,39(2): 288-291.HUANG Qiao,WU Hong-lin,YANG Da-wei.Minimum Energy Method with Multi-restrictions to Decide the Rational Completed Stage Force[J].Journal of Harbin Institute of Technology,2007,39(2): 288-291.
[4]
张峻峰,丁志威,罗学成.基于影响矩阵法的斜拉桥成桥索力优化[J].交通科技,2011(3): 4-6.ZHANG Jun-feng, DING Zhi-wei, LUO Xue-cheng.Optimization of Cable Forces for Cable-stayed Bridges Based on the Influence Matrix Method[J].Transportation Science & Technology,2011(3): 4-6.
[5]
杨俊,沈成武.基于影响矩阵法的自锚式悬索桥施工张拉力确定[J].武汉理工大学学报: 交通科学与工程版,2009,33(3): 588-591.YANG Jun,SHEN Cheng-wu.Determining Construction Suspender Force of Self-anchored Suspension Bridge on the Base of Influence Matrix[J].Journal of Wuhan University of Technology: Transportation Science & Engineering Edition,2009,33(3): 588-591.
[6]
张柳煜,刘来君,杨利峰.支架现浇大曲率斜拉桥初始索力确定方法[J].中国公路学报,2010,23(5): 58-63.ZHANG Liu-yu,LIU Lai-jun,YANG Li-feng.Method of Determining Initial Cable Forces for Large Curvature Cablestayed Bridge with Full Framing Cast-in-place[J].China Journal of Highway and Transport,2010,23(5): 58-63.
[7]
叶梅新,韩衍群,张敏.基于ANSYS 平台的斜拉桥调索方法研究[J].铁道学报, 2006, 28(4): 128-131.YE Mei-xin,HAN Yan-qun,ZHANG Min.Research on Adjusting Cable Forces of Cable-stayed Bridges Based on ANSYS[J].Journal of the China Railway Society,2006, 28(4): 128-131.
[8]
黄峰,章芳芳.考虑恒活载及结合处弯矩的混合梁斜拉桥索力优化[J].公路交通科技,2012,29(10): 66-70.HUANG Feng,ZHANG Fang-fang.Optimization on Cable Tensions of Completed Cable-stayed Bridge with Mixed Stiffening Girders Considering Dead and Live Loads and Moment at Junction Section[J].Journal of Highway and Transportation Research and Development, 2012, 29 (10): 66-70.
[9]
程进,肖汝诚,江见鲸.斜拉桥成桥初始恒载索力概率确定[J].土木工程学报,2003,36(12): 58-63.CHENG Jin, XIAO Ru-cheng, JIANG Jian-jing.Probabilistic Determination for Initial Cable Forces of Cable-stayed Bridges under Dead Loads[J].China Civil Engineering Journal,2003,36(12): 58-63.
[10]
刘邵平,段鸿杰,李求源.寒山大桥吊杆二次张拉索力计算[J].现代交通技术,2011,8(1): 28-31.LIU Shao-ping,DUAN Hong-jie, LI Qiu-yuan.Boom Secondary Cable-adjustment Calculation of Hanshan Bridge [J].Modern Transportation Technology,2011,8(1): 28-31.