刘钊. 两座大型斜拉桥索塔锚固区模型试验及对比研究 [J]. 中国工程科学,2003,5 (12): 49-53.LIU Zhao. Model Tests and Comparative Study of the Pylon'sAnchorage Zone of Two Long-span Cable-stayed Bridges[J]. Engineering Science,2003,5 (12): 49-53.
[2]
彭苗,陈升平,余天庆,等. 巴东长江大桥索塔锚固区节段模型试验与空间应与力分析 [J]. 武汉理工大学学 报: 交 通 科 学 与 工 程 版,2004,28 (5):760-762.PENG Miao,CHEN Sheng-ping,YU Tian-qing,et al.Anchorage Zone of Cable-stayed Tower in Badong ChangJiang Highway Bridge: Model Test and Spatial StressAnalysis [J ]. Journal of Wuhan University ofTechnology: Transportation Science & EngineeringEdition,2004,28 (5): 760-762.
[3]
张望喜,易伟建,陈建阳,等. 武汉军山长江公路大桥索塔锚固区带锚块足尺节段模型试验研究 [J]. 中南公路工程,2001,26 (4): 33-35.ZHANG Wang-xi,YI Wei-jian,CHEN Jian-yang,et al.The Full-scale Model Test of the Segment with AnchorBlock in the Anchorage Region of Cable Pylon of WuhanJunshan Changjiang River Bridge [J]. Central SouthHighway Engineering,2001,26 (4) : 33-35.
[4]
项贻强. 陈国强. 鄱阳湖口大桥索塔节段足尺模型试验与分析研究 [J]. 中国公路学报,2000,13 (4):74-78.XIANG Yi-qiang,CHEN Guo-qiang. The Test and SpatialAnalysis for the Full Scale Segment Model of the CablePylon of Poyanghukou Bridge [J]. China Journal ofHighway and Transport,2000,13 (4): 74-78.
[5]
刘世建. #字型预应力体系在索塔锚固区的应用及试验研究 [D]. 重庆: 重庆交通大学,2008.LIU Shi-jian. Application and Experimental Analysis of #-type Prestressed System in Cable Tower Anchorage Zone ofCable-stayed Bridge [D]. Chongqing: Chongqing JiaotongUniversity,2008.
[6]
曾明根. 公轨共用大跨斜拉桥索塔锚固区节段试验研究 [J]. 中国铁路科学,2008,29 (4): 54-57.ZENG Ming-gen. Test Study on the Cable-pylon AnchorageZone of Highway and Light Railway Long-span Cable-stayed Bridge [J]. China Railway Science,2008,29(4): 54-57.
[7]
王存国,刘兆丰,赵人达. 甬江斜拉桥索塔锚固区应力分析 [J]. 公路工程,2009,34 (6): 136-139.WANG Cun-guo,LIU Zhao-feng,ZHAO Ren-da. StressAnalysis of Anchorage Zone of Pylon for Yongjiang Cable-stayed Bridge [J]. Highway Engineering,2009,34(6): 136-139.
[8]
ZHANG Hui, DESROCHESB R. Experimental andAnalytical Studies on a Streamlined Steel Box Girder [J].Journal of Constructional Steel Research, 2010,66 (7):906-914.
ACI 318 M- 05. Building Code Requirements forStructural Concrete and Commentary[S].
[11]
FARAHAN K,MOFID M,VAFAI A. A Solution Methodfor General Contact-impact Problems [J]. ComputerMethods in Applied Mechanics and Engineering,2000,187 (1-2): 69-77.