杨进.泰州长江公路大桥主桥三塔悬索桥方案设计的技术理念[J].桥梁建设,2007,(3):33- 35. YANG Jin. Technical Ideas of Conceptual Design of Three Tower Suspension Bridge for Main Bridge of Taizhou Changjiang River Highway Bridge[J].Bridge Construction,2007 (3):33- 35.
[2]
杨进,徐恭义,韩大章,等.泰州长江公路大桥三塔两跨悬索桥总体设计与结构选型[J]. 桥梁建设,2008,38(1):37- 40. YANG Jin,XU Gong-yi,HAN Da-zhang,et al. Overall Design and Structural Type Selection of Three-Tower and Two-span Suspension Bridge of Taizhou Changjiang River Highway Bridge[J]. Bridge Construction,2008,38(1):37- 40.
[3]
JI Lin. Research on Key Technologies in Design of Middle Pylon of Taizhou Bridge [J]. Engineering Sciences,2012,10(3):2-7.
[4]
钟建驰. 泰州大桥-世界首座千米级三塔悬索桥[J].中国工程科学,2010,12(4):4-8. ZHONG Jian-chi. Taizhou Bridge: The First Kilometer Level Three-tower Two-span Suspension Bridge in the World
[5]
[J]. Engineering Sciences,2010,12(4):4-8.
[6]
吉林,王陶,吴寒亮. 基于实际工作状态的多塔连跨悬索桥中间塔模型试验设计[J]. 中国工程科学,2012,14 (5):66-70. JI Lin,WANG Tao,WU Han-Liang. Model Design of Static Experiment for the Middle Tower of Multi-span Suspension Bridge Based on Actual Working Condition [J]. Engineering Science,2012,14 (5):66-70.
[7]
阮新,阮静,陈艾荣,等.泰州大桥中间塔鞍座抗滑安全性评估[J].中国工程科学,2012,14(5):71-74. RUAN Xin,RUAN Jing,CHEN Ai-rong,et al. Anti-sliding Safety Assessment for Main Saddle on Middle Tower of Taizhou Bridge [J]. Engineering Sciences, 2012,14(5):71-74.
[8]
DENG Ting,LUO Xi-heng. Study foe Reasonable Value of Friction Coefficient Between Main Cable and Saddle [J]. Engineering Sciences: English Edition,2012,10(3):72-76.
[9]
冯兆祥,张磊,吴冲. 泰州长江大桥钢塔疲劳计算随机车辆荷载模拟[J]. 公路交通科技,2008,25(12):127- 138. FENG Zhao-xiang,ZHANG Lei,WU Chong. Simulation of Random Vehicle Load for Fatigue Calculation of Steel Pylon of Taizhou Yangtze River Bridge [J]. Journal of Highway and Transportation Research and Development,2008,25(12):127-138.
[10]
杨宁,肖文福,吉林. 泰州长江公路大桥中塔沉井定位方案研究[J]. 桥梁建设,2009,39(4):64-68. YANG Ning,XIAO Wen-fu,JI Lin. Research of Positioning Scheme for Caisson of Intermediate Tower of Taizhou Changjiang River Highway Bridge[J]. Bridge Construction,2009,39(4):64-68.
[11]
刘建波,杨炎华,翟世鸿,等.泰州长江大桥特大型深水沉井基础施工关键技术[J].施工技术,2011,40(8):74- 82. LIU Jian-bo,YANG Yan-hua,ZHAI Shi-hong,et al. Key Construction Technology of Large Deepwater Open-caisson Foundation in Taizhou Yangtze River Bridge[J].Construction Technology,2011,40(8):74- 82. [11] 肖文福,傅琼阁,刘建波,等.泰州大桥中塔超大沉井下沉监控技术[J].现代交通技术,2009,(2):58- 60. XIAO Wen-fu,FU Qiong-ge,LIU Jian-bo,et al. Subsidence Monitoring Technology of Extra Large Caisson in Taizhou Bridge[J]. Modern Transportation Technology,2009 (2):58- 60.
[12]
张向群,王琳,游新鹏. 泰州大桥钢中塔线形控制误差调整方法[J].中国工程科学,2012,14(5):29-32. ZHANG Xiang-qun,WANG Lin,YOU Xin-peng. The Error Adjusting Method of Line-shape Control for the Middle Steel Tower of Taizhou Bridge[J]. Engineering Sciences,2012,14(5):29-32.