王树仁,何满潮,刘招伟岩溶隧道突水灾变过程分析及控制技术[J]北京科技大学学报,2006, 28(7):613一618.WANG Shu-ren, HE Man-chao, LIU Zhao-wei. Analysis on the Process of Wtiter Burst Catastrophe and It's Prevention Countermeasures in A Karst Tunnel [J] Journal of University of Science and Technology Beijing 2006, 28 (7):613一618
[2]
刘新荣,张旭东,黄明,等深埋隧道填充型溶腔溃水机制及风险识别[J]重庆大学学报,2012, 35(7):28一34.LIU Xin-rong, ZHANG Xu-dong, HUANG Ming, et al.Feature and Risk Identification of Super Karst Wtiter Burst in Deeply Buried Karst Tunnel[T].Journal of Chongqing University 2012 35 (7):28一34
[3]
刘招伟,何满潮,王树仁圆梁山隧道岩溶突水机理及防治对策研究[J]岩土力学,2006, 27 (2):228一232.LIU Zhao-wei, HE Man-zhao, WANG Shu-ren. Study on Karst Waterburst Mechanism and Prevention Countermeasures in Yuanliangshan Tunnel [T]. Rock and Soil Mechanics,2006, 27 (2):228一232
[4]
戎凯,曹大明,王荣劲长函子隧道岩溶突水、突泥特征及控制因素分析[J]现代隧道技术,2010, 47(5):26一31.BONG Kai,CAO Da-ming,WANG Rong-jin. Analysis of Control Factors for Water-gushing and Mud一outburst in Changdangzi Karst Tunnel [J]Modern Tunnelling Technology, 2010,47 (s):26一31
[5]
匡星,白明洲,王成亮,等基于模糊评价方法的隧道岩溶突水地质灾害综合预警方法[J]公路交通科技,2010, 27 (11):100一103.KUANG Xing, BAI Ming-zhou, WANG Cheng-liang, et al. Research of Comprehensive Warning of Water Inrush Hazards in Karst Tunnel Based on Fuzzy Evaluation Method [J]. Journal of Highway and Transportation Research and Development 2010 27(11):100一103
[6]
李术才,薛诩国,张庆松,等高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究田岩石力学与工程学报,2008, 27 (7):1297一1307.LI Shu-cai, XUE Yi-guo, ZHANG Qingsongs et al. Key Technology Study on Comprehensive Prediction and Early-warning of Geological Hazards during Tunnel Construction in High-risk Karst Areas . Chinese Journal of Rock Mechanics and Engineering 2008,27 (7):1297一1307
[7]
葛颜慧,李术才,张庆松,等基于风险评价的岩溶隧道综合超前地质预报技术研究[J]岩石力学与工程学报,2010, 32 (7):1124一1130.GE Yan-hui, LI Shu-cai, ZHANG Qing-song, et al.Comprehensive Geological Prediction Based on Risk Evaluation during Tunneling in Karst Area [T]. Chinese Journal of Geotechnical Engineering 2010,32(7):1124一1130
[8]
刘新荣,张旭东,黄明隧道岩溶溃水延滞性特征分析及其安全风险规避[J]岩土工程学报,2011, 33(9):1326一1332.LIU Xin-rong, ZHANG Xu-dong, HUANG Ming. Delay Characteristics and Risk Mitigation of Karst Water Burst Flood of Tunnels [J]. Chinese Journal of Geotechnical Engineering 2011,33 (9):1326一1332
[9]
张旭东,汪海滨,封明君,等释能降压工法在高压富水岩溶隧道风险规避中的应用研究[J]岩石力学与工程学报,2010, 29(增1):2782一2791.ZHANG Xu-dong, WANG Hai-bin, FEND Ming-jun, et al. Study of The Application of Energy Releasing and Pressure Reducing Aim to Evade Risk in Water-Enriched High Hydraulics Pressure Latent Karst Tunnel [J] Chinese Journal of Rock Mechanics and Engineering 2010,29 (S1):2782一2791
[10]
湖北省交通规划设计院大坪山隧道施工设计图[R]武汉:湖北省交通规划设计院,2010.Hubei Communications Planning and Design Institute Design Drawings of Dapingshan Tunnel [R]. Wuhan: Hubei Communications Planning and Design Institute,2010.
[11]
徐国峰,杨建峰,陈侃福台绍高速公路苍岭隧道水文地勘察与涌水量预测[J]岩石力学与工程学报,2005, 24(增2):5531一5542. XU Guo-feng,YANG Jian-feng,CHEN Kan-fu. Surveying of Hydrogeology Condition and Forecasting of Wtiter Inflow in Gangling Tunnel Taizhou-Jinyun Highway [J]. Chinese Journal of Rock Mechanics and Engineering 2005,24.(S2):5531一5542
[12]
杨兵宜万铁路马鹿答隧道岩溶灾害的工程处治技术田地下空间与工程学报,2011, 7 (3):581 -586.YANG Bing. Treatment Techniques for Karst Disaster of Maluding Tunnel on Yichang Wanzhou Railway [J]Chinese Journal of Underground Space and Engineering 2011,7 (3):581一586.
[13]
薛诩国,李术才,苏茂鑫,等隧道施工期超前地质预报实施方法研究田岩土力学,2011, 32 (8):2416一2422.XUE Yi-guo, LI Shu-cai, SU Mao-xin, et al. Study of Geological Prediction Implementation Method in Tunnel Construction [J]. Rock and Soil Mechanics,2011,32.(8):2416一2422