Ren Juanjuan, Liu Xueyi. Calculation method and influencing factors on the crack of continuous track slab [J]. Journal of Southwest Jiaotong University, 2010, 45(1): 34―38. (in Chinese)
[2]
DB Netz A G. Requirements catalog for the construction of the permanent way (AKFF) [S]. 4th Revised Edition. Frankfurt: DB System Technik-Ober Bautechnik, 2002.
[3]
Bachmann H, Mohr W, Kowalski M. The Rheda 2000 ballastless track system [J]. European Railway Review, 2003, 8(1): 44―51.
Liu Xueyi, Zhao Pingrui. The theory and method on ballastless track design of passenger dedicated line [M]. Chengdu: Southwest Jiaotong University Publishing House, 2010: 161―170. (in Chinese)
[6]
何华武. 无砟轨道技术[M]. 北京: 中国铁道出版社, 2005: 50―70.
[7]
He Huawu. The technology of ballastless track [M]. Beijing: China Railway Publishing House, 2005: 50―70. (in Chinese)
[8]
李成辉. 轨道[M]. 成都: 西南交通大学出版社, 2005: 80―81.
[9]
Li Chenghui. Track [M]. Chengdu: Southwest Jiaotong University Publishing House, 2005: 80―81. (in Chinese)
Liu Zhenmin, Qian Zhendi, Zhang Lei. The analysis and control of concrete crack of double-block ballastless track slab [J]. Railway Engineering, 2007(6): 99―101. (in Chinese)