岩石力学与工程学报 2001
FORMING CONDITIONS AND SLIDING MECHANISM OF SWITCH YARD SLOPE AT TIANHUANGPING POWER STATION
|
Abstract:
Tianhuangping pumped storage power station is located in Anji County, Zhejiang Province. The field of 500 KV switch yard is a pivotal project of the power station and formed by excavating mountain slope. The rock slope slid above the switch yard field during construction period on March 10, 1996. According to the research and treatment on this slope sliding, the forming conditions, influence factors and working mechanism of slope sliding are studied.