%0 Journal Article %T FORMING CONDITIONS AND SLIDING MECHANISM OF SWITCH YARD SLOPE AT TIANHUANGPING POWER STATION
天荒坪开关站滑坡的形成条件和滑动机理 %A Mei Qiyue %A
梅其岳 %J 岩石力学与工程学报 %D 2001 %I %X Tianhuangping pumped storage power station is located in Anji County, Zhejiang Province. The field of 500 KV switch yard is a pivotal project of the power station and formed by excavating mountain slope. The rock slope slid above the switch yard field during construction period on March 10, 1996. According to the research and treatment on this slope sliding, the forming conditions, influence factors and working mechanism of slope sliding are studied. %K switch yard slope %K sliding mechanism %K influent factors %K Tianhuangping pumped %K storage power station
滑动机理 %K 影响因素 %K 天荒坪抽水蓄能电站 %U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=D3421FAA1A0A0F0C&jid=35E747D791A1346351AFB523B7FA35CB&aid=145D33B31C54B272&yid=14E7EF987E4155E6&vid=A04140E723CB732E&iid=CA4FD0336C81A37A&sid=C5154311167311FE&eid=D3E34374A0D77D7F&journal_id=1000-6915&journal_name=岩石力学与工程学报&referenced_num=13&reference_num=13