APPLICATION OF GEODRAIN-LOADING METHOD TO RECLAMATION ENGINGEERING
塑料排水带堆载法在围海造陆工程中的应用

Keywords: ground treatment,consolidation settlement,prefabricated strip,dredger-reclaimed sand,reclamation engineering
固结沉降
,塑料排水带,吹填砂,围海造陆工程,地基处理

Full-Text   Cite this paper   Add to My Lib

Abstract:

An engineering example is introduced,which applies prefabricated strip to treat the deep silt with dredger-reclaimed sand as load in Zhanjiang reclamation project. With careful monitoring, considering the accordance of the construction schedule and the loading speed, the reclaiming process is integrated with the treatment of soft soil in this case. The investment is therefore decreased and the term of works is shorten. The result of the long-term settlement observation shows that the degree of consolidation of the 13-meter-thick silt is above 80% at the end of the first two years, which indicates that the method can increase the consolidation speed.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133