|
系统工程理论与实践 1998
A New Way to Solve Cascade Hydropower Reservoirs Operation with Large Scale System Analysis
|
Abstract:
The operation scheme of cascade hydropower reservoirs is an important element for economic effects. In this paper, an optimizing method for large scale system has been used to solve practical problems, and a dispatch graph of cascade reservoirs has been designed in software to meet the needs of practical use. Finally, the application results to Ankang and Shiquan reservoirs are satisfying.