%0 Journal Article
%T A New Way to Solve Cascade Hydropower Reservoirs Operation with Large Scale System Analysis
用大系统分析方法解决梯级水电站群调度问题的新途径
%A Tian Fengwei
%A
田峰巍
%A 解建仓
%J 系统工程理论与实践
%D 1998
%I
%X The operation scheme of cascade hydropower reservoirs is an important element for economic effects. In this paper, an optimizing method for large scale system has been used to solve practical problems, and a dispatch graph of cascade reservoirs has been designed in software to meet the needs of practical use. Finally, the application results to Ankang and Shiquan reservoirs are satisfying.
%K cascade hydropower reservoirs
%K optimal dispatching
%K large scale system analysis
梯级水电站群
%K 优化调度
%K 大系统分析
%U http://www.alljournals.cn/get_abstract_url.aspx?pcid=01BA20E8BA813E1908F3698710BBFEFEE816345F465FEBA5&cid=962324E222C1AC1D&jid=1D057D9E7CAD6BEE9FA97306E08E48D3&aid=F79112217D7A22E66456DE2D1A7BA67C&yid=8CAA3A429E3EA654&vid=13553B2D12F347E8&iid=94C357A881DFC066&sid=4BB057F167CF3A60&eid=7555FB9CC973F695&journal_id=1000-6788&journal_name=系统工程理论与实践&referenced_num=5&reference_num=0