A NEW TESTING METHOD OF GAS WELL POTENTIAL:BACKPRESSURE ISOCHRONAL TEST
气井产能测试新方法――回压等时试井

Keywords: Gas well,Single-point potential test,Production test,Isochronal,Backpressure test,New method
气井
,单点法,产能测试,等时,回压试井,新方法

Full-Text   Cite this paper   Add to My Lib

Abstract:

The single-point potential test has two merits. One is that in needs a short test time. Another is that the quantity of relief-gas is small. But it will cause a great error in evaluating a low permeability gas well productivity because the gas well will cost a long time to reach a pseudo steady state. To resolve the problem, based on backpressure test theory and superposition principle, this paper designed a new test method, named Backpressure Isochronal Test. It can accurately evlauate the productivity of gas wells with low permeability in a short test time which approximately equals to the time the single-point method needs. The analysis and contrast of analog wells reveal that the result is reliable.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133