天然气地球科学 2004
A NEW TESTING METHOD OF GAS WELL POTENTIAL:BACKPRESSURE ISOCHRONAL TEST
|
Abstract:
The single-point potential test has two merits. One is that in needs a short test time. Another is that the quantity of relief-gas is small. But it will cause a great error in evaluating a low permeability gas well productivity because the gas well will cost a long time to reach a pseudo steady state. To resolve the problem, based on backpressure test theory and superposition principle, this paper designed a new test method, named Backpressure Isochronal Test. It can accurately evlauate the productivity of gas wells with low permeability in a short test time which approximately equals to the time the single-point method needs. The analysis and contrast of analog wells reveal that the result is reliable.