Status Report on the 5 Mev Iphi RFQ

Full-Text   Cite this paper   Add to My Lib

Abstract:

A 5-MeV RFQ designed for a proton current up to 100-mA CW is now under construction as part of the High Intensity Proton Injector project (IPHI). Its computed transmission is greater than 99 %. The main goals of the project are to verify the accuracy of the design codes, to gain the know-how on fabrication, tuning procedures and operations, to measure the output beam characteristics in order to optimise the higher energy part of the linac, and to reach a high availability with minimum beam trips. A cold model has been built to develop the tuning procedure. The present status of the IPHI RFQ is presented.