Building failure remains a persistent cause of avoidable death and capital loss in rapidly urbanising African cities, yet the empirical literature has tended to treat it either as a technical problem of design or as a governance problem of enforcement, rarely examining the two explanations against a common physical outcome. This study recodes, from first principles, the national register of documented building failures compiled by the National Construction Authority of Kenya for the period 1990 to 2019. The register lists ninety-one rows, one pair of which duplicates a single incident, giving ninety distinct events; thirty-two are located in Nairobi City County. Each event was coded against eight pre-failure deficiency indicators under a rule that admits only conditions the register names, and the complete coded dataset is published as an appendix so that every statistic can be reproduced from the public source. The design is a case-only analysis of buildings that failed. It can describe the composition of the documented failure record and estimate correlates of the extent of failure conditional on a failure having been documented, but it cannot estimate the probability that a standing building will fail, because the register contains no non-failed buildings and no exposure denominators. Structural safety was operationalised as the extent of failure, distinguishing collapse of the primary structural frame (64 events) from localised failure of a secondary element (26 events). Within Nairobi records, poor workmanship is the most frequently named condition, at 59.4 per cent; against the rest of Kenya only inadequate maintenance is significantly more prevalent (21.9 versus 5.2 per cent, p = 0.031), while a pre-failure compliance breach is named in 37.5 versus 10.3 per cent of records (p = 0.005). Across the national failure corpus, substandard materials is the only indicator associated with escalation from localised defect to frame collapse (OR = 5.07, 95 per cent CI 1.09 to 23.61, p = 0.025); it retains that association under adjustment in a pre-specified reduced model and under Firth penalised estimation across all eight indicators, but it does not survive correction for multiple testing. The models explain between 10 and 16 per cent of the variation in failure extent and classify no better than the majority class, which is itself a finding about how little a short-form incident register records. All multivariable results describe the national failure corpus and not Nairobi City County specifically. Enforcement response is treated throughout as a
References
[1]
National Construction Authority (2020) Research on Failure and Collapse of Buildings in Kenya. National Construction Authority. https://www.nca.go.ke/media/RESEARCH_on_Building_Faillures_.pdf
[2]
World Bank Group (2019) Managing Risks for a Safer Built Environment in Kenya: Building Regulatory Capacity Assessment. World Bank Group. https://hdl.handle.net/10986/31325
[3]
Ahzahar, N., Karim, N.A., Hassan, S.H. and Eman, J. (2011) A Study of Contribution Factors to Building Failures and Defects in Construction Industry. ProcediaEngineering, 20, 249-255. https://doi.org/10.1016/j.proeng.2011.11.162
[4]
Khoso, A.R., Khan, J.S., Faiz, R.U., Akhund, M.A., Ahmed, A. and Memon, F. (2019) Identification of Building Failure Indicators. Engineering, Technology&AppliedScienceResearch, 9, 4591-4595. https://doi.org/10.48084/etasr.2872
[5]
Lagat, D., Kivaa, T., Njuguna, M., Nyakondo, S., Maklago, E., Onkangi, R., et al. (2024) Factors Affecting the Physical and Functional Performance of Buildings in Kenya. JournaloftheKenyaNationalCommissionforUNESCO, 4, 1-20. https://doi.org/10.62049/jkncu.v4i1.72
[6]
Van der Heijden, J. (2009) Building Regulatory Enforcement Regimes: Comparative Analysis of Private Sector Involvement in the Enforcement of Public Building Regulations. IOS Press.
[7]
Twum-Darko, M. and Mazibuko, P.N. (2015) Compliance and Enforcement Challenges: A Case of the National Building Regulations’ Processes in South Africa. JournalofGovernanceandRegulation, 4, 679-684. https://doi.org/10.22495/jgr_v4_i4_c6_p2
[8]
Agapiou, A. and Yakubu, S. (2019) Determinants of Non-Compliance with Structural Building Code Standards in Nigeria. ProceedingsoftheInstitutionofCivilEngineers—Management, ProcurementandLaw, 172, 47-59. https://doi.org/10.1680/jmapl.18.00033
[9]
Mahmoud, A.S., Hamdan Ahmad, M., Mohd Yatim, Y. and Aminu Dodo, Y. (2021) Safety Performance Framework at Construction Site for Self-Regulation by Building Developers. Engineering, ConstructionandArchitecturalManagement, 29, 3394-3414. https://doi.org/10.1108/ecam-10-2020-0808
[10]
Lagat, D., Njuguna, M., Kivaa, T. and Mutungi, S. (2025) Exploring the Determinants of Regulatory Compliance in Construction Projects in Nairobi City County, Kenya. Engineering, Technology&AppliedScienceResearch, 15, 23189-23196. https://doi.org/10.48084/etasr.10298
[11]
Omollo, W.O. (2019) Barriers to the Effective Regulation of the Building Construction Industry: An Empirical Analysis. JournalofConstructionBusinessandManagement, 3, 49-58. https://doi.org/10.15641/jcbm.3.2.745
[12]
Wawak, S., Ljevo, ?. and Vukomanovi?, M. (2020) Understanding the Key Quality Factors in Construction Projects—A Systematic Literature Review. Sustainability, 12, Article 10376. https://doi.org/10.3390/su122410376
[13]
Mashwama, N., Aigbavboa, C. and Thwala, D. (2017) An Assessment of the Critical Success Factor for the Reduction of Cost of Poor Quality in Construction Projects in Swaziland. ProcediaEngineering, 196, 447-453. https://doi.org/10.1016/j.proeng.2017.07.223
[14]
Sei?, S., Fauth, J., Zheng, Y. and Poetz, A. (2025) Understanding and Conceptualizing Inspections in the Context of Building Permits. SmartandSustainableBuiltEnvironment. https://doi.org/10.1108/sasbe-11-2024-0492
[15]
Mwelu, N., Davis, P.R., Ke, Y. and Watundu, S. (2020) Compliance Mediating Role within Road Construction Regulatory Framework. JournalofPublicProcurement, 20, 209-233. https://doi.org/10.1108/jopp-12-2018-0052
[16]
Liu, J., Wang, Y. and Wang, Z. (2022) Effect of Pressure on Construction Company Compliance Attitudes: Moderating Role of Organizational Ethical Climate. JournalofConstructionEngineeringandManagement, 148, Article ID: 04022125. https://doi.org/10.1061/(asce)co.1943-7862.0002400
[17]
Liu, J., Zhao, X. and Li, Y. (2017) Exploring the Factors Inducing Contractors’ Unethical Behavior: Case of China. JournalofProfessionalIssuesinEngineeringEducationandPractice, 143, Article ID: 04016023. https://doi.org/10.1061/(asce)ei.1943-5541.0000316
[18]
Awe, O.O., Atofarati, E.O., Adeyinka, M.O., Musa, A.P. and Onasanya, E.O. (2023) Assessing the Factors Affecting Building Construction Collapse Casualty Using Machine Learning Techniques: A Case of Lagos, Nigeria. InternationalJournalofConstructionManagement, 24, 261-269. https://doi.org/10.1080/15623599.2023.2222966
[19]
Xu, H., Chang, R., Pan, M., Li, H., Liu, S., Webber, R.J., et al. (2022) Application of Artificial Neural Networks in Construction Management: A Scientometric Review. Buildings, 12, Article 952. https://doi.org/10.3390/buildings12070952
[20]
Firth, D. (1993) Bias Reduction of Maximum Likelihood Estimates. Biometrika, 80, 27-38. https://doi.org/10.1093/biomet/80.1.27
[21]
Heinze, G. and Schemper, M. (2002) A Solution to the Problem of Separation in Logistic Regression. StatisticsinMedicine, 21, 2409-2419. https://doi.org/10.1002/sim.1047
[22]
Figueroa Fernandez, R.H. (2014) Strategies to Reduce the Risk of Building Collapse in Developing Countries. Ph.D. Thesis, Carnegie Mellon University. https://kilthub.cmu.edu/articles/thesis/Strategies_to_Reduce_the_Risk_of_Building_Collapse_in_Developing_Countries/6723218
[23]
Hudson, F.S., Sutrisna, M. and Chawynski, G. (2020) A Certification Framework for Managing the Risks of Non-Compliance and Non-Conformance Building Products: A Western Australian Perspective. InternationalJournalofBuildingPathologyandAdaptation, 39, 312-343. https://doi.org/10.1108/ijbpa-11-2019-0097