An Evolving Fuzzy Neural Network for Characterizing and Predicting Asymmetric-Information Risk Causes in Road Maintenance Projects: A Kenyan Case Study
Asymmetric information, meaning the uneven spread of project-relevant knowledge among clients, contractors and consultants, is a persistent but weakly quantified source of construction risk, and it matters a great deal for publicly funded road maintenance in developing economies. This paper characterises the asymmetric-information risk causes of a Kenyan urban road maintenance project, the Periodic Maintenance and Spot Improvement of Kinoo Shopping Centre Loop (Tender No. KURA/DEV/HQ/311/2024-2025), and develops an evolving fuzzy neural network (EFuNN) that tracks them while remaining interpretable. Ten risk indicators covering the contractor, client, consultant and external domains were read off the tender document, the conditions of contract and its data sheet, the bills of quantities, the Form 7 schedule of construction material basic prices and the environmental management plan. Each indicator was given an explicit scoring rule tied to a named clause and fuzzified into three Gaussian linguistic granules. Because the weekly progress records for the case lot were not released, the indicator stream was reconstructed rather than observed: the clause-derived scores set the level of each trajectory, contract provisions set its shape over the project lifecycle, and bounded random variation was added to give 208 weekly samples across the case lot and seven comparable KURA maintenance lots. A five-layer evolving Takagi-Sugeno-Kang network with novelty-based rule creation, utility pruning and recursive-least-squares adaptation was trained prequentially on this stream. It grew a compact seven-rule base and recovered the specified composite risk index with a root-mean-square error of 0.031, a mean absolute error of 0.024 and a coefficient of determination of 0.83. These figures measure how closely the network reproduces a reference index that this paper defines in Equations (2) and (3); they are not a test against realised claims, delays or cost growth, and they should be read as evidence of online structural identification rather than empirical validation. The fuzzy categorisation points to market volatility, time pressure and liquidated-damages exposure as the most adverse causes, each traceable to a specific clause of the contract. The study contributes a documented and auditable route from contract clauses to a continuous, time-varying risk signal, together with evidence that an evolving neuro-fuzzy predictor can follow such a signal while staying small enough to read.
References
[1]
Alaloul, W.S., Musarat, M.A., Rabbani, M.B.A., Iqbal, Q., Maqsoom, A. and Farooq, W. (2021) Construction Sector Contribution to Economic Stability: Malaysian GDP Distribution. Sustainability, 13, Article 5012. https://doi.org/10.3390/su13095012
[2]
Almashhour, R., Al-Mhdawi, M.K.S., Daghfous, A., Qazi, A. and Ojiako, U. (2025) Traditional to Sustainable Risk Management in the Construction Industry: A Systematic Literature Review. InternationalJournalofManagingProjectsinBusiness, 18, 528-565. https://doi.org/10.1108/ijmpb-01-2025-0021
[3]
Albasyouni, W., Kamara, J. and Heidrich, O. (2025) Key Challenges and Opportunities to Improve Risk Assessments in the Construction Industry. Buildings, 15, Article 1832. https://doi.org/10.3390/buildings15111832
[4]
Ivi?, I. and Ceri?, A. (2023) Risks Caused by Information Asymmetry in Construction Projects: A Systematic Literature Review. Sustainability, 15, Article 9979. https://doi.org/10.3390/su15139979
[5]
Ivi?, I. and Ceri?, A. (2024) Mitigation Measures for Information Asymmetry between Participants in Construction Projects: The Impact of Trust. Sustainability, 16, Article 6808. https://doi.org/10.3390/su16166808
[6]
Ridho, M. and Djamil, N. (2023) The Effect of the Proportion of the Board of Commissioners, Audit Committee, Asymmetric Information and Company Size on Earnings Management Practices. JAWI: Journal of Ahkam WaIqtishad, 1, 95-100.
[7]
Shi, G., Tong, J., Chen, Z.C. and Wang, Y. (2025) Optimal Time-Based and Cost-Based Contracts in Construction Projects under Asymmetric Information. JournalofCivilEngineeringandManagement, 31, 299-317. https://doi.org/10.3846/jcem.2025.23318
[8]
Koc, K. and Gurgun, A.P. (2022) Ambiguity Factors in Construction Contracts Entailing Conflicts. Engineering, ConstructionandArchitecturalManagement, 29, 1946-1964. https://doi.org/10.1108/ecam-04-2020-0254
[9]
Tang, H.H. and Ahmad, N.S. (2024) Fuzzy Logic Approach for Controlling Uncertain and Nonlinear Systems: A Comprehensive Review of Applications and Advances. Systems Science & Control Engineering, 12, Article ID: 2394429. https://doi.org/10.1080/21642583.2024.2394429
[10]
Kulkarni, A. and kulkarni, N. (2020) Fuzzy Neural Network for Pattern Classification. Procedia Computer Science, 167, 2606-2616. https://doi.org/10.1016/j.procs.2020.03.321
[11]
Walia, N., Singh, H. and Sharma, A. (2015) ANFIS: Adaptive Neuro-Fuzzy Inference System—A Survey. International Journal of Computer Applications, 123, 32-38. https://doi.org/10.5120/ijca2015905635
[12]
Alateeq, M. and Pedrycz, W. (2024) Logic-Oriented Fuzzy Neural Networks: A Survey. Expert Systems with Applications, 257, Article ID: 125120. https://doi.org/10.1016/j.eswa.2024.125120
[13]
Angelov, P. (2009) Evolving Fuzzy Systems. In: Lin, T.Y., Liau, C.J. and Kacprzyk, J., Eds., Granular, Fuzzy, and Soft Computing, Springer, Springer, 725-741. https://doi.org/10.1007/978-1-0716-2628-3_192
[14]
Gu, X., Angelov, P., Han, J. and Shen, Q. (2023) Multilayer Evolving Fuzzy Neural Networks. IEEETransactionsonFuzzySystems, 31, 4158-4169. https://doi.org/10.1109/tfuzz.2023.3276263
[15]
Lughofer, E. (2011) Evolving Fuzzy Systems-Methodologies, Advanced Concepts and Applications. Springer.
Pesek, A.E., Smithwick, J.B., Saseendran, A. and Sullivan, K.T. (2019) Information Asymmetry on Heavy Civil Projects: Deficiency Identification by Contractors and Owners. JournalofManagementinEngineering, 35, Article ID: 04019008. https://doi.org/10.1061/(asce)me.1943-5479.0000694
[18]
Li, X., Li, H., Zhang, R., Yin, Y., Sun, S., Bai, J., et al. (2024) Impact of Asymmetric Trust on Construction Project Management Performance: The Mediating Role of Knowledge Sharing. Engineering, ConstructionandArchitecturalManagement, 31, 4538-4561. https://doi.org/10.1108/ecam-05-2022-0400
[19]
Marinho, A., Couto, J. and Teixeira, J. (2021) Relational Contracting and Its Combination with the Bim Methodology in Mitigating Asymmetric Information Problems in Construction Projects. JournalofCivilEngineeringandManagement, 27, 217-229. https://doi.org/10.3846/jcem.2021.14742
[20]
Ceri?, A. (2021) Reducing Information Asymmetry and Building Trust in Projects Using Blockchain Technology. Gra?evinar, 73, 967-978.
[21]
Nalbant, K.G. (2025) An Application of the Interval Type-2 Fuzzy TOPSIS Method for the Selection of Project Managers. EngineeringManagementJournal, 1-14. https://doi.org/10.1080/10429247.2025.2492617
[22]
Banerjee Chattapadhyay, D., Putta, J. and Rao P, R.M. (2021) Risk Identification, Assessments, and Prediction for Mega Construction Projects: A Risk Prediction Paradigm Based on Cross Analytical-Machine Learning Model. Buildings, 11, Article 172. https://doi.org/10.3390/buildings11040172
[23]
Rafiei, H. and Akbarzadeh-T., M.R. (2023) Reliable Fuzzy Neural Networks for Systems Identification and Control. IEEETransactionsonFuzzySystems, 31, 2251-2263. https://doi.org/10.1109/tfuzz.2022.3222036
[24]
Abuhussain, M.A. (2024) Integrated Fuzzy Technique for Order Preference by Similarity to Ideal Solution and Emotional Artificial Neural Network Model for Comprehensive Risk Prioritization in Green Construction Projects. Sustainability, 16, Article 9784. https://doi.org/10.3390/su16229784