Minimización de la tardanza para el flowshop flexible con setup utilizando heurísticas constructivas y un algoritmo genéticoDOI: 10.4067/S0718-33052012000100009 Keywords: flexible flowshop, genetic algorithms, constructive heuristics, anticipatory sequence dependent setup times, neighborhood search. Abstract: this paper studied the problem of sequencing n jobs in a k-stages flexible flowshop with different number of parallel machines per stage with anticipatory sequence dependent setup times (sdst) and tardiness minimization. the performance of constructive heuristics and the genetic algorithm are compared. the evaluation of the methods is made experimentally over a set of randomly generated test problems. the results indicate that the genetic algorithm do not outperforms all of the compared heuristics.
|