全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Planejamento e Programa??o da Produ??o numa Fundi??o Cativa Automatizada de Grande Porte

Keywords: programa??o inteira mista, dimensionamento de lotes, programa??o da produ??o, fundi??o.

Full-Text   Cite this paper   Add to My Lib

Abstract:

this work consists of a case study in a large foundry, which has three molding lines and two sets of furnaces. the molding lines produce different types of items, which must be made of different alloys produced by the furnaces. in each period, the production programming in this foundry has two important levels of decision making which are linked: 1) which alloys should be produced in the furnace in each period and 2) the quantity of each item to be produced in each molding machine. initially, the productive process is described and then a mixed integer programming optimization model is proposed in which the lot-sizing of the items and the capacity programming of the furnaces are considered. a commercial package/software was utilized to obtain the computational results. a simulation lasting 5 working days was carried out and the computational results obtained from the model solution were compared with the ones obtained by the company, showing a significant increase in the productivity and reduction concerning delays of the delivery deadline.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133