The rapid expansion of the global new energy vehicle (NEV) industry has introduced unprecedented technical, operational, and systemic risks, driven by increasing system complexity and intelligent connectivity features. This study critically examines prevailing risk management practices in NEV development and evaluates the effectiveness of existing qualitative risk assessment approaches used by automakers. The analysis reveals significant methodological limitations, particularly in consistency, standardization, and decision-support capability. To address these gaps, this paper develops an enhanced Criticality Priority Index (CPI) framework that integrates maturity assessment into a structured three-dimensional risk evaluation model. By embedding technological maturity and process readiness into CPI calculations, the proposed approach strengthens the analytical rigor and comparability of qualitative risk assessments. The study validates the enhanced framework through empirical case applications, demonstrating its superiority over conventional qualitative methods in risk classification accuracy and managerial usability. Furthermore, the findings show that the enhanced CPI model improves risk-level discrimination, supports more precise resource prioritization, and enhances project-level decision-making under uncertainty. Overall, the research advances risk management methodology for complex engineering projects and provides a practical, multi-dimensional assessment tool tailored to the technologically intensive environment of NEV development.
References
[1]
Barghi, B., & Shadrokh Sikari, S. (2020). Qualitative and Quantitative Project Risk Assessment Using a Hybrid PMBOK Model Developed under Uncertainty Conditions. Heliyon,6, e03097. https://doi.org/10.1016/j.heliyon.2019.e03097
[2]
Cagno, E., Caron, F., & Mancini, M. (2007). A Multi-Dimensional Analysis of Major Risks in Complex Projects. RiskManagement,9, 1-18. https://doi.org/10.1057/palgrave.rm.8250014
[3]
Cervone, H. F. (2006). Project Risk Management. OCLCSystems&Services:Internationaldigitallibraryperspectives,22, 256-262. https://doi.org/10.1108/10650750610706970
[4]
Cox Jr., L. A., Babayev, D., & Huber, W. (2005). Some Limitations of Qualitative Risk Rating Systems. RiskAnalysis,25, 651-662. https://doi.org/10.1111/j.1539-6924.2005.00615.x
[5]
Dias, G. C., Hernandez, C. T., & Oliveira, U. R. d. (2020). Supply Chain Risk Management and Risk Ranking in the Automotive Industry. Gest?o&Produ??o,27, e3800. https://doi.org/10.1590/0104-530x3800-20
[6]
Dionne, G. (2013). Risk Management: History, Definition, and Critique. RiskManagementandInsuranceReview,16, 147-166. https://doi.org/10.1111/rmir.12016
[7]
Fang, C., & Marle, F. (2012). A Simulation-Based Risk Network Model for Decision Support in Project Risk Management. DecisionSupportSystems,52, 635-644. https://doi.org/10.1016/j.dss.2011.10.021
[8]
Huang, Y. (2025). Exploring the Principle of Multi-Dimensional Risk Analysis and a Case Study in Two-Dimensional Risk. Risks,13, Article 79. https://doi.org/10.3390/risks13040079
[9]
Jones, C. (1994). Assessment and Control of Software Risks. Yourdon Press.
[10]
Kendrick, T. (2015). Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project. Amacom.
[11]
Lansdowne, Z. F. (1999). Risk Matrix: An Approach for Prioritizing Risks and Tracking Risk Mitigation Progress. In Proceedings of the 30th Annual Project Management Institute.
[12]
Lincoln, Y. S., & Guba, E. G. (1985). Naturaltstu Inquiry. Sage.
[13]
Ochieng, P. A. (2009). An Analysis of the Strengths and Limitation of Qualitative and Quantitative Research Paradigms. Problems of Education in the 21st Century, 13, 13-18.
[14]
Schwandt, T. A. (1989). The Politics of Verifying Trustworthiness in Evaluation Auditing. Evaluation Practice, 10, 33-40. https://doi.org/10.1177/109821408901000405
[15]
Tomanek, M., & Juricek, J. (2015). Project Risk Management Model Based on PRINCE2 and Scrum Frameworks. InternationalJournalofSoftwareEngineering&Applications,6, 81-88. https://doi.org/10.5121/ijsea.2015.6107
[16]
Virine, L. (2013). Integrated Qualitative and Quantitative Risk Analysis of Project Portfolios. InProceedings of 2013 Enterprise Risk Management Symposium (pp. 22-24).
[17]
Xu, Z., & Shi, J. (2025). Research on the National Security Risk Assessment Model. HumanitiesandSocialSciencesCommunications,12, Article No. 906. https://doi.org/10.1057/s41599-025-05278-w
[18]
Yan, Q., Zhang, M., Li, W., & Qin, G. (2020). Risk Assessment of New Energy Vehicle Supply Chain Based on Variable Weight Theory and Cloud Model: A Case Study in China. Sustainability,12, Article 3150. https://doi.org/10.3390/su12083150