An Enhanced CPI-Based Framework for Risk Management in New Energy Vehicle Development

DOI: 10.4236/ajibm.2026.166032, PP. 615-631

Keywords: NEV Project, Risk Management, Risk Qualitative Assessment, Three-Dimensional Assessment

Full-Text   Cite this paper   Add to My Lib

Abstract:

The rapid expansion of the global new energy vehicle (NEV) industry has introduced unprecedented technical, operational, and systemic risks, driven by increasing system complexity and intelligent connectivity features. This study critically examines prevailing risk management practices in NEV development and evaluates the effectiveness of existing qualitative risk assessment approaches used by automakers. The analysis reveals significant methodological limitations, particularly in consistency, standardization, and decision-support capability. To address these gaps, this paper develops an enhanced Criticality Priority Index (CPI) framework that integrates maturity assessment into a structured three-dimensional risk evaluation model. By embedding technological maturity and process readiness into CPI calculations, the proposed approach strengthens the analytical rigor and comparability of qualitative risk assessments. The study validates the enhanced framework through empirical case applications, demonstrating its superiority over conventional qualitative methods in risk classification accuracy and managerial usability. Furthermore, the findings show that the enhanced CPI model improves risk-level discrimination, supports more precise resource prioritization, and enhances project-level decision-making under uncertainty. Overall, the research advances risk management methodology for complex engineering projects and provides a practical, multi-dimensional assessment tool tailored to the technologically intensive environment of NEV development.

References

[1]  Barghi, B., & Shadrokh Sikari, S. (2020). Qualitative and Quantitative Project Risk Assessment Using a Hybrid PMBOK Model Developed under Uncertainty Conditions. Heliyon, 6, e03097.
https://doi.org/10.1016/j.heliyon.2019.e03097
[2]  Cagno, E., Caron, F., & Mancini, M. (2007). A Multi-Dimensional Analysis of Major Risks in Complex Projects. Risk Management, 9, 1-18.
https://doi.org/10.1057/palgrave.rm.8250014
[3]  Cervone, H. F. (2006). Project Risk Management. OCLC Systems & Services: International digital library perspectives, 22, 256-262.
https://doi.org/10.1108/10650750610706970
[4]  Cox Jr., L. A., Babayev, D., & Huber, W. (2005). Some Limitations of Qualitative Risk Rating Systems. Risk Analysis, 25, 651-662.
https://doi.org/10.1111/j.1539-6924.2005.00615.x
[5]  Dias, G. C., Hernandez, C. T., & Oliveira, U. R. d. (2020). Supply Chain Risk Management and Risk Ranking in the Automotive Industry. Gest?o & Produ??o, 27, e3800.
https://doi.org/10.1590/0104-530x3800-20
[6]  Dionne, G. (2013). Risk Management: History, Definition, and Critique. Risk Management and Insurance Review, 16, 147-166.
https://doi.org/10.1111/rmir.12016
[7]  Fang, C., & Marle, F. (2012). A Simulation-Based Risk Network Model for Decision Support in Project Risk Management. Decision Support Systems, 52, 635-644.
https://doi.org/10.1016/j.dss.2011.10.021
[8]  Huang, Y. (2025). Exploring the Principle of Multi-Dimensional Risk Analysis and a Case Study in Two-Dimensional Risk. Risks, 13, Article 79.
https://doi.org/10.3390/risks13040079
[9]  Jones, C. (1994). Assessment and Control of Software Risks. Yourdon Press.
[10]  Kendrick, T. (2015). Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project. Amacom.
[11]  Lansdowne, Z. F. (1999). Risk Matrix: An Approach for Prioritizing Risks and Tracking Risk Mitigation Progress. In Proceedings of the 30th Annual Project Management Institute.
[12]  Lincoln, Y. S., & Guba, E. G. (1985). Naturaltstu Inquiry. Sage.
[13]  Ochieng, P. A. (2009). An Analysis of the Strengths and Limitation of Qualitative and Quantitative Research Paradigms. Problems of Education in the 21st Century, 13, 13-18.
[14]  Schwandt, T. A. (1989). The Politics of Verifying Trustworthiness in Evaluation Auditing. Evaluation Practice, 10, 33-40.
https://doi.org/10.1177/109821408901000405
[15]  Tomanek, M., & Juricek, J. (2015). Project Risk Management Model Based on PRINCE2 and Scrum Frameworks. International Journal of Software Engineering & Applications, 6, 81-88.
https://doi.org/10.5121/ijsea.2015.6107
[16]  Virine, L. (2013). Integrated Qualitative and Quantitative Risk Analysis of Project Portfolios. InProceedings of 2013 Enterprise Risk Management Symposium (pp. 22-24).
[17]  Xu, Z., & Shi, J. (2025). Research on the National Security Risk Assessment Model. Humanities and Social Sciences Communications, 12, Article No. 906.
https://doi.org/10.1057/s41599-025-05278-w
[18]  Yan, Q., Zhang, M., Li, W., & Qin, G. (2020). Risk Assessment of New Energy Vehicle Supply Chain Based on Variable Weight Theory and Cloud Model: A Case Study in China. Sustainability, 12, Article 3150.
https://doi.org/10.3390/su12083150