The Building Information Modelling (BIM) methodology is currently the main support for the development of integrated and collaborative projects within the construction industry, having been implemented in all sectors of activity worldwide. The present study aims to disseminate the collaborative capabilities of BIM platforms on the development of multi-disciplinary building projects, upon an integrated 3D BIM model, composed of architecture, structures, water network and electrical system disciplines. BIM design process requires the elaboration of a digital virtual model. The study describes the modelling processes of different disciplines, the analysis of conflicts between components, the establishment of the construction planning (4D BIM model) and the building cost estimation (5D BIM model). A case study project was considered, comprising several disciplines required in the building design. In order to cover in detail the various design components, the case study was limited to a specific area of a house, the sanitary room. This zone presents a sufficient complexity in the modelling process, in the identification and timing of construction steps associated with the necessary human resources, in the estimation of costs involved by discipline and construction component and in the application of VR software. The conflict analysis and the visual simulation of the construction planning were prepared using a BIM viewer. The study allows to analyze the main advantages introduced in the construction industry and the barriers found in all the processes concerning the creation of a complete collaborative BIM model. The innovative aspect of the BIM application is based on the detailed 4D/5D and the achievements in the design quality supported in VR/AR.
References
[1]
Al-Mohammad, M.S., Haron, A.T., Esa, M., Aloko, M.N., Alhammadi, Y., Anandh, K.S., et al. (2022) Factors Affecting BIM Implementation: Evidence from Countries with Different Income Levels. ConstructionInnovation, 23, 683-710. https://doi.org/10.1108/ci-11-2021-0217
[2]
Haggard, K.E. (2017) Case Study on Virtual Reality in Construction. https://www.researchgate.net/publication/319076947_Case_Study_on_Virtual_Reality_in_Construction
[3]
Sampaio, A.Z. and Gomes, A.M. (2022) Professional One-Day Training Course in BIM: A Practice Overview of Multi-Applicability in Construction. Journal of Software EngineeringandApplications, 15, 131-149. https://doi.org/10.4236/jsea.2022.155007
[4]
Sacks, R., Eastman, C., Lee, G. and Teicholz, P. (2018) BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. 3rd Edition, Wiley. https://doi.org/10.1002/9781119287568
Succar, B. (2009) Building Information Modelling Framework: A Research and Delivery Foundation for Industry Stakeholders. Automation in Construction, 18, 357-375. https://doi.org/10.1016/j.autcon.2008.10.003
[7]
Smith, P. (2014) BIM Implementation—Global Strategies. ProcediaEngineering, 85, 482-492. https://doi.org/10.1016/j.proeng.2014.10.575
[8]
Charef, R., Alaka, H. and Emmitt, S. (2018) Beyond the Third Dimension of BIM: A Systematic Review of Literature and Assessment of Professional Views. Journal of BuildingEngineering, 19, 242-257. https://doi.org/10.1016/j.jobe.2018.04.028
[9]
Ingram, J. (2020) Understanding BIM: The Past, Present and Future. Routledge, Taylor & Francis Group. https://api.taylorfrancis.com/content/books/mono/download?identifierName=doi&identifierValue=10.1201/9780429282300&type=googlepdf
[10]
Sacks, R., Wang, Z., Ouyang, B., Utkucu, D. and Chen, S. (2022) Toward Artificially Intelligent Cloud-Based Building Information Modelling for Collaborative Multidisciplinary Design. AdvancedEngineeringInformatics, 53, Article ID: 101711. https://doi.org/10.1016/j.aei.2022.101711
[11]
Sarmento, R.S. (2023) BIM Implementation in the Development of the Multidisciplinary Project: 4D and 5D Models and VR Integration. Master’s Thesis, University of Lisbon.
[12]
Teng, Y., Xu, J., Pan, W. and Zhang, Y. (2022) A Systematic Review of the Integration of Building Information Modeling into Life Cycle Assessment. Building and Environment, 221, Article ID: 109260. https://doi.org/10.1016/j.buildenv.2022.109260
[13]
Sanchez-Lite, A., Zulueta, P., Sampaio, A.Z. and Gonzalez-Gaya, C. (2022) BIM for the Realization of Sustainable Digital Models in a University-Business Collaborative Learning Environment: Assessment of Use and Students’ Perception. Buildings, 12, Article 971. https://doi.org/10.3390/buildings12070971
[14]
Wang, J., Wang, X., Shou, W., Chong, H. and Guo, J. (2016) Building Information Modeling-Based Integration of MEP Layout Designs and Constructability. AutomationinConstruction, 61, 134-146. https://doi.org/10.1016/j.autcon.2015.10.003
[15]
Salzano, A., Miano, A., Prota, A. and Jacobsson, R. (2022) The Use of the BIM Approach from the Conceptual Planning to the Construction Phase: The Case Study of the Ship Experiment. Designs, 6, Article 48. https://doi.org/10.3390/designs6030048
[16]
Yu, X., Yu, P., Wan, C., Wang, D., Shi, W., Shou, W., et al. (2022) Integrating Virtual Reality and Building Information Modeling for Improving Highway Tunnel Emergency Response Training. Buildings, 12, Article 1523. https://doi.org/10.3390/buildings12101523
[17]
Terreno, S., Anumba, C.J., Gannon, E. and Dubler, C. (2015) The Benefits of BIM Integration with Facilities Management: A Preliminary Case Study. ComputinginCivilEngineering 2015, Austin, TX, 21-23 June 2015, 675-683. https://doi.org/10.1061/9780784479247.084
[18]
van Nederveen, G.A. and Tolman, F.P. (1992) Modelling Multiple Views on Buildings. Automation in Construction, 1, 215-224. https://doi.org/10.1016/0926-5805(92)90014-b
[19]
Eastman, C.M. (1975) The Use of Computers Instead of Drawings in Building Design. AIAJournal, 63, 46-50. https://www.researchgate.net/publication/234643558_The_Use_of_Computers_Instead_of_Drawings_in_Building_Design
[20]
Wong, J.K.W. and Zhou, J. (2015) Enhancing Environmental Sustainability over Building Life Cycles through Green BIM: A Review. AutomationinConstruction, 57, 156-165. https://doi.org/10.1016/j.autcon.2015.06.003
[21]
Sampaio, A.Z. (2021) Maturity of BIM Implementation in the Construction Industry: Governmental Policies. International Journal of Engineering Trends and Technology, 69, 92-100. https://doi.org/10.14445/22315381/ijett-v69i7p214
[22]
Shehzad, H.M.F., Ibrahim, R.B., Yusof, A.F. and Khaidzir, K.A.M. (2019) Building Information Modeling: Factors Affecting the Adoption in the AEC Industry. 2019 6thInternational Conference on Research and Innovation in Information Systems (ICRIIS), Johor Bahru 2-3 December 2019, 1-6. https://doi.org/10.1109/icriis48246.2019.9073581
[23]
Birkemo, A.S., Hjortland, S.C. and Samarakoon, S.M.S.M.K. (2019). Improvements for the Workflow Interoperability between BIM and FEM Tools. WIT Transactions ontheBuiltEnvironment, 192, 317-327. https://doi.org/10.2495/bim190271
[24]
Gomes, A.M., Azevedo, G., Sampaio, A.Z. and Lite, A.S. (2022) BIM in Structural Project: Interoperability Analyses and Data Management. Applied Sciences, 12, Article 8814. https://doi.org/10.3390/app12178814
[25]
Gigante, M.A. (1993) Virtual Reality: Definitions, History and Applications. In: Earnshaw, R.A., Gigante, M.A. and Jones, H., Eds., VirtualRealitySystems, Elsevier, 3-14. https://doi.org/10.1016/b978-0-12-227748-1.50009-3
[26]
Sutherland, I.E. (2003) Computer Laboratory Sketchpad: A Man-Machine Graphical Communication System. Technical Report, UCAM-CL-TR-574. https://www.cl.cam.ac.uk/techreports/UCAM-CL-TR-574.html
[27]
Johansson, M. and Roupé, M. (2024) Real-World Applications of BIM and Immersive VR in Construction. AutomationinConstruction, 158, Article ID: 105233. https://doi.org/10.1016/j.autcon.2023.105233
[28]
Revit (Autodesk). https://www.autodesk.com/
[29]
EPAL’s Building Networks Manual (2023) EPAL documentation, Lisbon, Portugal. (In Portuguese)
[30]
Fuzor. https://www.kalloctech.com
[31]
Arkio. https://www.arkio.is
[32]
Unity. https://unity.com/pt
[33]
SENTIO VR. https://www.sentiovr.com
[34]
Enscape. https://enscape3d.com
[35]
Unreal Engine. https://www.unrealengine.com/en-US
[36]
AUGmenture. https://www.augmentecture.com
[37]
Tang, S., Shelden, D.R., Eastman, C.M., Pishdad-Bozorgi, P. and Gao, X. (2019) A Review of Building Information Modeling (BIM) and the Internet of Things (IoT) Devices Integration: Present Status and Future Trends. Automation in Construction, 101, 127-139. https://doi.org/10.1016/j.autcon.2019.01.020
[38]
Koutamanis, A. (2020) Dimensionality in BIM: Why BIM Cannot Have More than Four Dimensions? AutomationinConstruction, 114, Article ID: 103153. https://doi.org/10.1016/j.autcon.2020.103153
[39]
Schley, M., Haines, B., Roperm, K. and Williams, B. (2016) BIM for Facility Management, Version 2.1. https://it.ifma.org/wp-content/uploads/2019/04/BIM-FM-Consortium-BIM-Guide-v2_1.pdf
[40]
Ershadi, M., Jefferies, M., Davis, P. and Mojtahedi, M. (2022) Implementation of Building Information Modelling in Infrastructure Construction Projects: A Study of Dimensions and Strategies. International Journal of Information Systems and Project Management, 9, 43-59. https://doi.org/10.12821/ijispm090403