Research on Improvement of Electric Smoothie Machine Production Management Based on Industrial Engineering Methods

DOI: 10.4236/eng.2025.177021, PP. 355-369

Keywords: Production Line Balance, Industrial Engineering, Operation Analysis, 5W1H, ECRS

Full-Text   Cite this paper   Add to My Lib

Abstract:

This paper focuses on the low production line balance rate and prominent bottleneck processes in smoothie machine production line. It employs industrial engineering methodologies to conduct optimization research. The stopwatch time research method is used to determine the operation time of each workstation, and the standard time of the process is determined by standardization analysis, then the operation status of the production line is diagnosed and evaluated, and the 5W1H question technology and ECRS principle are used to optimize the process. In view of the bottleneck process, the two-hand operation was analyzed, and the operator’s two-hand action was improved according to the principle of action economy. The results show that the balance rate, balance rate, loss rate, production takt time and daily capacity of the improved production line have been greatly improved. This study provides effective methodologies and practical case references for household appliance manufacturing.

References

[1]  Gupta, H., Chaudhary, G. Singh, K.M., Kumar, D. and Malik, A. (2018) Application of Industrial Engineering to Increase the Productivity of an E-Rickshaw Factory. International Journal of Trend in Scientific Research and Development, 2, 492-501.
https://doi.org/10.31142/ijtsrd12969
[2]  Pei, X. and Xu, Q. (2017) Study on the Application of Industrial Engineering Methods on Production Line Balancing Problem in T Company. Proceedings of the 2nd International Conference on Mechatronics Engineering and Information Technology (ICMEIT 2017), Dalian, 13-14 May 2017, 1015-1019.
https://doi.org/10.2991/icmeit-17.2017.8
[3]  Liu, W. and Lu, S. (2023) Optimization of Automotive Wire Harness Production Process Based on Lean Manufacturing. Proceedings of the 2nd International Conference on Engineering Management and Information Science, Chengdu, 24-26 February 2023, 24-26.
https://doi.org/10.4108/eai.24-2-2023.2330620
[4]  Dev Singh, M., Singh, S., Keyur, D., Saumil, S., Niki, P. and Harshal, P. (2015) Overall Productivity Improvement in Casting Industry by Using Various Industrial Engineering Techniques. International Journal of Innovative Research in Science, Engineering and Technology, 4, 18713-18721.
https://doi.org/10.15680/ijirset.2015.0401050
[5]  Ishak, A., Faiz Zubair, A. and Sekar Cendani, A. (2020) Production Line Simulation in Vise Using the Flexsim Application. IOP Conference Series: Materials Science and Engineering, 1003, Article 012103.
https://doi.org/10.1088/1757-899x/1003/1/012103
[6]  Yang, X., Wei, W. and Huang, Q.T. (2020) Study on Optimization of Fabric Processing Area Based on Man-Machine Operation Analysis. China Forest Products Industry, 57, 60-63.
[7]  Pinarbasi, M., Alakas, H.M. and Yuzukirmizi, M. (2019) A Constraint Programming Approach to Type-2 Assembly Line Balancing Problem with Assignment Restrictions. Assembly Automation, 39, 813-826.
https://doi.org/10.1108/aa-12-2018-0262
[8]  Abdous, M., Delorme, X., Battini, D., Sgarbossa, F. and Berger-Douce, S. (2022) Assembly Line Balancing Problem with Ergonomics: A New Fatigue and Recovery Model. International Journal of Production Research, 61, 693-706.
https://doi.org/10.1080/00207543.2021.2015081

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133