Factors Affecting Implementation of Earned Value Management (EVM) in Construction Projects

DOI: 10.4236/jbcpr.2025.133004, PP. 79-107

Keywords: EVM, Project Management, Project Monitoring and Controlling, Construction Industry, EVM Implementation Barriers, Managerial Implications

Full-Text   Cite this paper   Add to My Lib

Abstract:

Earned Value Management (EVM) has emerged as an effective project monitoring and control method while the construction industry has lagged other industries, such as defense and aerospace, in adopting it. This research explored the barriers to effective EVM implementation for construction projects by investigating the factors affecting EVM adoption and utilization. The effort included a literature review and personal communications to obtain initial industry input to devise and distribute a survey questionnaire. Out of a total of 354 valid returns, 203 were familiar with (aware of) EVM while the remaining 151 respondents were not. Further, 77 respondents out of the group familiar with EVM indicated that they had not implemented EVM in their projects. Two categorical dependent variables and several categorical independent variables formulated from the survey data were statistically analyzed using cross tabulation and logistic regression. It was found that the first dependent variable (Is EVM implemented) was influenced by management commitment level, project budget range, availability of resources, extent of work breakdown structure (WBS) being aligned with schedule, difficulty of estimating earned value (EV), detail level of WBS, and accuracy of planned value (PV). The cost of EVM implementation was found to be the least important hindrance to its adoption. It was further concluded that the second dependent variable (how effectively is EVM implemented) was influenced by the extent execution follows schedule baseline, accuracy of PV, availability of resources, management commitment level, difficulty of estimating EV, extent WBS is aligned with schedule, and type of contract. The findings of the study were discussed and validated by a focus group of construction industry experts to close out this research effort. Interest in and support by senior management was identified as the most influential factor for EVM adoption and effective implementation.

References

[1]  Bryde, D., Unterhitzenberger, C. and Joby, R. (2018) Conditions of Success for Earned Value Analysis in Projects. International Journal of Project Management, 36, 474-484.
https://doi.org/10.1016/j.ijproman.2017.12.002
[2]  Batselier, J. and Vanhoucke, M. (2015) Construction and Evaluation Framework for a Real-Life Project Database. International Journal of Project Management, 33, 697-710.
https://doi.org/10.1016/j.ijproman.2014.09.004
[3]  Kerzner, H. (2017) Project Management: A Systems Approach to Planning, Scheduling, and Controlling. John Wiley & Sons.
[4]  Solís-Carcaño, R.G., Corona-Suárez, G.A. and García-Ibarra, A.J. (2015) The Use of Project Time Management Processes and the Schedule Performance of Construction Projects in Mexico. Journal of Construction Engineering, 2015, Article ID: 868479.
https://doi.org/10.1155/2015/868479
[5]  Fleming, Q.W. and Koppelman, J.M. (2002) Using Earned Value Management. Cost Engineering, 44, 32-36.
[6]  Lipke, W. (2003) Schedule Is Different. The Measurable News, 31, 31-34.
[7]  Lukas, J.A. (2008) EVM.01 Earned Value Analysis—Why It Doesn’t Work. AACE International Transactions, 240-243.
https://leanconstruction.org/wp-content/uploads/2022/09/LukasPaper_Earned-Value-Analysis_EVM-1.pdf
[8]  Vanhoucke, M. and Vandevoorde, S. (2007) A Simulation and Evaluation of Earned Value Metrics to Forecast the Project Duration. Journal of the Operational Research Society, 58, 1361-1374.
https://doi.org/10.1057/palgrave.jors.2602296
[9]  Kim, E., Wells, W.G. and Duffey, M.R. (2003) A Model for Effective Implementation of Earned Value Management Methodology. International Journal of Project Management, 21, 375-382.
https://doi.org/10.1016/s0263-7863(02)00049-2
[10]  Kwak, Y.H. and Anbari, F.T. (2010) Project Management in Government: An Introduction to Earned Value Management (EVM). IBM Center for the Business of Government.
[11]  Kwak, Y.H. and Anbari, F.T. (2012) History, Practices, and Future of Earned Value Management in Government: Perspectives from NASA. Project Management Journal, 43, 77-90.
https://doi.org/10.1002/pmj.20272
[12]  Sutrisna, M., Pellicer, E., Torres-Machi, C. and Picornell, M. (2018) Exploring Earned Value Management in the Spanish Construction Industry as a Pathway to Competitive Advantage. International Journal of Construction Management, 20, 1-12.
https://doi.org/10.1080/15623599.2018.1459155
[13]  Zhan, Z., Wang, C., Yap, J.B.H., Samsudin, S. and Abdul-Rahman, H. (2019) Earned Value Analysis, Implementation Barriers, and Maturity Level in Oil & Gas Production. South African Journal of Industrial Engineering, 30, 44-59.
https://doi.org/10.7166/30-4-2030
[14]  Abba, W. (2000) How Earned Value Got to Primetime: A Short Look Back and a Glance Ahead. The Measurable News, 9, 1-4.
[15]  McGregor, J.S. (2019) Department of Defense Earned Value Management Implementation Guide (EVMIG). Department of Defense.
[16]  Anbari, F.T. (2003) Earned Value Project Management Method and Extensions. Project Management Journal, 34, 12-23.
https://doi.org/10.1177/875697280303400403
[17]  Henderson, K. (2003) Earned Schedule: A Breakthrough Extension to Earned Value Theory? A Retrospective Analysis of Real Project Data. The Measurable News, 1, 13-23.
[18]  Keng, T.C and Shahdan, N. (2015) The Application of Earned Value Management (EVM) in Construction Project Management. Journal of Technology Management and Business, 2, 1-11.
[19]  Morad, M. and El-Sayegh, S.M. (2016) Use of Earned Value Management in the UAE Construction Industry. 2016 International Conference on Industrial Engineering, Management Science and Application (ICIMSA), Jeju, 23-26 May 2016, 1-5.
https://doi.org/10.1109/icimsa.2016.7504044
[20]  Terrell, S.M. and Richards, B.W. (2018) Earned Value Management (EVM) Implementation Handbook, NASA Technical Reports Server (NTRS).
[21]  Vanhoucke, M. (2012) Project Management with Dynamic Scheduling. Springer.
https://doi.org/10.1007/978-3-642-25175-7
[22]  Buyse, P., Vandenbussche, T. and Vanhoucke, M. (2010) Performance Analysis of Earned Value Management in the Construction Industry. Master Thesis Faculteit Economie en Bedrijfskunde, Gent University.
[23]  Fleming, Q.W. and Koppelman, J.M. (2002) Earned Value Management: Mitigating the Risks Associated with Construction Projects. Program Manager, 31, 90-95.
[24]  Kim, S., Park, C., Lee, S. and Son, J. (2008) Integrated Cost and Schedule Control in the Korean Construction Industry Based on a Modified Work-Packaging Model. Canadian Journal of Civil Engineering, 35, 225-235.
https://doi.org/10.1139/l07-094
[25]  Chang, H., Yu, W. and Cheng, S. (2017). A Risk-Based Critical Path Scheduling Method (I): Model and Prototype Application System. Proceedings of the International Symposium on Automation and Robotics in Construction (IAARC), July 2017, 527-535.
https://doi.org/10.22260/isarc2017/0072
[26]  Fleming, Q.W. and Koppelman, J.M. (2009) The Two Most Useful Earned Value Metrics: The CPI and the TCPI. Cost Engineering, 51, 16-18.
[27]  Chen, H.L., Chen, W.T. and Lin, Y.L. (2016) Earned Value Project Management: Improving the Predictive Power of Planned Value. International Journal of Project Management, 34, 22-29.
https://doi.org/10.1016/j.ijproman.2015.09.008
[28]  Chen, S. and Zhang, X. (2012) An Analytic Review of Earned Value Management Studies in the Construction Industry. Construction Research Congress 2012, West Lafayette, 21-23 May 2012, 236-246.
https://doi.org/10.1061/9780784412329.025
[29]  Lipke, W. (2011) Schedule Adherence and Rework. PM World Today, 13, 1-14.
[30]  Wilson, B., Frolick, M. and Ariyachandra, T. (2013) Earned Value Management Systems: Challenges and Future Direction. Journal of Integrated Enterprise Systems, 2, 9-17.
[31]  Aibinu, A.A. and Odeyinka, H.A. (2006) Construction Delays and Their Causative Factors in Nigeria. Journal of Construction Engineering and Management, 132, 667-677.
https://doi.org/10.1061/(asce)0733-9364(2006)132:7(667)
[32]  Tabachnick, B.G. and Fidell, L.S. (2013) Using Multivariate Statistics. 6th Edition, Pearson Education Inc.
[33]  Healey, J.F. (2016) The Essentials of Statistics: A Tool for Social Research. 4th Edition, Cengage Learning.
[34]  Cakan, H. (2012) Analysis and Modeling of Roofer and Steel Worker Fall Accidents. Ph.D. Thesis, Wayne State University.
[35]  Kazan, E.E. (2013) Analysis of Fatal and Nonfatal Accidents Involving Earthmoving Equipment Operators and On-Foot Workers. Ph.D. Thesis, Wayne State University.
[36]  Cakan, H., Kazan, E. and Usmen, M. (2014) Investigation of Factors Contributing to Fatal and Nonfatal Roofer Fall Accidents. International Journal of Construction Education and Research, 10, 300-317.
https://doi.org/10.1080/15578771.2013.868843
[37]  Fang, D., Chen, Y. and Wong, L. (2006) Safety Climate in Construction Industry: A Case Study in China (Hong Kong). Journal of Construction Engineering and Management, 132, 573-584.
https://doi.org/10.1061/(asce)0733-9364(2006)132:6(573)
[38]  Wong, C.H. (2004) Contractor Performance Prediction Model for the United Kingdom Construction Contractor: Study of Logistic Regression Approach. Journal of Construction Engineering and Management, 130, 691-698.
https://doi.org/10.1061/(asce)0733-9364(2004)130:5(691)
[39]  Hosmer, D.W., Lemeshow, S. and Sturdivant, R.X. (2013) Applied Logistic Regression. 3rd Edition, Wiley.
https://doi.org/10.1002/9781118548387
[40]  Williams, A. and Katz, L. (2001) The Use of Focus Group Methodology in Education: Some Theoretical and Practical Considerations. IEJLL: International Electronic Journal for Leadership in Learning, 5, 1-10.
[41]  Sunarti, N., Pakir Mastan, Z. and Seon Cin, L. (2018) The Application and Challenges of Earned Value Management (EVM) as Cost Monitoring Tool in the Construction Industry. International Journal of Engineering & Technology, 7, 96-100.
https://doi.org/10.14419/ijet.v7i3.36.29086

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133