The construction projects’ dynamic and interconnected nature requires a comprehensive understanding of complexity during pre-construction. Traditional tools such as Gantt charts, CPM, and PERT often overlook uncertainties. This study identifies 20 complexity factors through expert interviews and literature, categorising them into six groups. The Analytical Hierarchy Process evaluated the significance of different factors, establishing their corresponding weights to enhance adaptive project scheduling. A system dynamics (SD) model is developed and tested to evaluate the dynamic behaviour of identified complexity factors. The model simulates the impact of complexity on total project duration (TPD), revealing significant deviations from initial deterministic estimates. Data collection and analysis for reliability tests, including normality and Cronbach alpha, to validate the model’s components and expert feedback. Sensitivity analysis confirmed a positive relationship between complexity and project duration, with higher complexity levels resulting in increased TPD. This relationship highlights the inadequacy of static planning approaches and underscores the importance of addressing complexity dynamically. The study provides a framework for enhancing planning systems through system dynamics and recommends expanding the model to ensure broader applicability in diverse construction projects.
References
[1]
Sanchez, F., Bonjour, E., Micaelli, J. and Monticolo, D. (2020) An Approach Based on Bayesian Network for Improving Project Management Maturity: An Application to Reduce Cost Overrun Risks in Engineering Projects. ComputersinIndustry, 119, Article 103227. https://doi.org/10.1016/j.compind.2020.103227
[2]
Koulinas, G., Xanthopoulos, A., Tsilipiras, T. and Koulouriotis, D. (2020) Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System. Buildings, 10, Article 134. https://doi.org/10.3390/buildings10080134
[3]
Guo, K. and Zhang, L. (2022) Multi-Objective Optimization for Improved Project Management: Current Status and Future Directions. AutomationinConstruction, 139, Article 104256. https://doi.org/10.1016/j.autcon.2022.104256
[4]
Hiebl, M.R.W. (2021) Sample Selection in Systematic Literature Reviews of Management Research. OrganizationalResearchMethods, 26, 229-261. https://doi.org/10.1177/1094428120986851
[5]
Lockyer, G. (1969) An Introduction to Critical Path Analysis. Pitman and Sons.
Andersen, E.S. (1996) Warning: Activity Planning Is Hazardous to Your Project’s Health! InternationalJournalofProjectManagement, 14, 89-94. https://doi.org/10.1016/0263-7863(95)00056-9
[8]
Charnes, A. and Cooper, W.W. (1963) Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints. OperationsResearch, 11, 18-39. https://doi.org/10.1287/opre.11.1.18
[9]
Elmaghraby, S.E. (1967) On the Expected Duration of PERT Type Networks. ManagementScience, 13, 299-306. https://doi.org/10.1287/mnsc.13.5.299
[10]
Kahraman, C., Gülbay, M. and Kabak, Ö. (2006). Applications of Fuzzy Sets in Industrial Engineering: A Topical Classification. In: Kahraman, C., Ed., Fuzzy Applications in Industrial Engineering, Springer, 1-55. https://doi.org/10.1007/3-540-33517-X_1
[11]
Chanas, S., Dubois, D. and Zielinski, P. (2002) On the Sure Criticality of Tasks in Activity Networks with Imprecise Durations. IEEETransactionsonSystems, ManandCybernetics, PartB (Cybernetics), 32, 393-407. https://doi.org/10.1109/tsmcb.2002.1018760
[12]
Saltelli, A., Ratto, M., Andres, T., Campolongo, F., Cariboni, J., Gatelli, D., etal. (2007) Global Sensitivity Analysis. The Primer. Wiley. https://doi.org/10.1002/9780470725184
[13]
Hall, N.G. and Posner, M.E. (2004) Sensitivity Analysis for Scheduling Problems. Journal of Scheduling, 7, 49-83. https://doi.org/10.1023/b:josh.0000013055.31639.f6
[14]
Herroelen, W. and Leus, R. (2004) Robust and Reactive Project Scheduling: A Review and Classification of Procedures. InternationalJournalofProductionResearch, 42, 1599-1620. https://doi.org/10.1080/00207540310001638055
[15]
Moazeni, S., Coleman, T.F. and Li, Y. (2013) Regularized Robust Optimization: The Optimal Portfolio Execution Case. ComputationalOptimizationandApplications, 55, 341-377. https://doi.org/10.1007/s10589-012-9526-3
[16]
Freeman, R.J. (1960) A Stochastic Model for Determining the Size and Allocation of the Research Budget. IRETransactionsonEngineeringManagement, 7, 2-7. https://doi.org/10.1109/iret-em.1960.5007523
[17]
Collyer, S. and Warren, C.M.J. (2009) Project Management Approaches for Dynamic Environments. InternationalJournalofProjectManagement, 27, 355-364. https://doi.org/10.1016/j.ijproman.2008.04.004
[18]
Senge, P. (1990) The Fifth Discipline: The Art and Practice of the Learning Organization. Bantam Doubleday Dell Publishing Group.
[19]
Helbing, D. (2013) Globally Networked Risks and How to Respond. Nature, 497, 51-59. https://doi.org/10.1038/nature12047
[20]
Gao, J. (2013) Complex Systems and Emergence: How Theory Meets Reality. Advances in Mechanics, 43, 359-389. https://doi.org/10.6052/1000-0992-13-046
[21]
Baccarini, D. (1996) The Concept of Project Complexity—A Review. InternationalJournalofProjectManagement, 14, 201-204. https://doi.org/10.1016/0263-7863(95)00093-3
[22]
Williams, T.M. (1999) The Need for New Paradigms for Complex Projects. InternationalJournalofProjectManagement, 17, 269-273. https://doi.org/10.1016/s0263-7863(98)00047-7
[23]
Gidado, K.I. (1996) Project Complexity: The Focal Point of Construction Production Planning. ConstructionManagementandEconomics, 14, 213-225. https://doi.org/10.1080/014461996373476
[24]
Vidal, L. and Marle, F. (2008) Understanding Project Complexity: Implications on Project Management. Kybernetes, 37, 1094-1110. https://doi.org/10.1108/03684920810884928
[25]
Xia, B. and Chan, A.P.C. (2012) Measuring Complexity for Building Projects: A Delphi Study. Engineering, ConstructionandArchitecturalManagement, 19, 7-24. https://doi.org/10.1108/09699981211192544
[26]
Luo, L., He, Q., Jaselskis, E.J. and Xie, J. (2017) Construction Project Complexity: Research Trends and Implications. JournalofConstructionEngineeringandManagement, 143. https://doi.org/10.1061/(asce)co.1943-7862.0001306
[27]
Dao, B., Kermanshachi, S., Shane, J., Anderson, S. and Hare, E. (2016) Identifying and Measuring Project Complexity. ProcediaEngineering, 145, 476-482. https://doi.org/10.1016/j.proeng.2016.04.024
[28]
Ma, L. and Fu, H. (2020) Exploring the Influence of Project Complexity on the Mega Construction Project Success: A Qualitative Comparative Analysis (QCA) Method. Engineering, ConstructionandArchitecturalManagement, 27, 2429-2449. https://doi.org/10.1108/ecam-12-2019-0679
[29]
Remington, K. and Pollack, J. (2008) Complex Projects: What Are They and How Can We Manage Them More Effectively? Proceedings of the 2008 AIPM Project Management Conference, Canberra, 1 Jan 2008, 1-10.
[30]
Parekh, R. (2024) Automating the Design Process for Smart Building Technologies. WorldJournalofAdvancedResearchandReviews, 23, 1213-1234. https://doi.org/10.30574/wjarr.2024.23.2.2461
[31]
Stoop, P.P.M. and Wiers, V.C.S. (1996) The Complexity of Scheduling in Practice. InternationalJournalofOperations&ProductionManagement, 16, 37-53. https://doi.org/10.1108/01443579610130682
[32]
Nosakhare, U.H. and Bright, A.F. (2017) Evaluation of Techniques for Univariate Normality Test Using Monte Carlo Simulation. AmericanJournalofTheoreticalandAppliedStatistics, 6, 51-61.
[33]
Easa, N.F. and Bazzi, A.M. (2021) COVID-19 and Lack of Socialization: Does Service Innovation Become an Imperative for Universities? InternationalJournalofDisruptiveInnovationinGovernment, 1, 82-103. https://doi.org/10.1108/ijdig-11-2020-0006
[34]
Hair, J.F., Hult, G.T.M., Ringle, C.M. and Sarstedt, M. (2017) A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM), 2 Edition, Sage Publications.
[35]
Wright, D.B. and Herrington, J.A. (2011) Problematic Standard Errors and Confidence Intervals for Skewness and Kurtosis. BehaviorResearchMethods, 43, 8-17. https://doi.org/10.3758/s13428-010-0044-x
[36]
Morgan, D. (1997). Focus Groups as Qualitative Research. SAGE Publications, Inc. https://doi.org/10.4135/9781412984287
[37]
Curran, P.J., West, S.G. and Finch, J.F. (1996) The Robustness of Test Statistics to Nonnormality and Specification Error in Confirmatory Factor Analysis. PsychologicalMethods, 1, 16-29. https://doi.org/10.1037//1082-989x.1.1.16
Heo, M., Kim, N. and Faith, M.S. (2015) Statistical Power as a Function of Cronbach Alpha of Instrument Questionnaire Items. BMCMedicalResearchMethodology, 15, Article No. 86. https://doi.org/10.1186/s12874-015-0070-6
[40]
Bujang, M.A., Omar, E.D. and Baharum, N.A. (2018) A Review on Sample Size Determination for Cronbach’s Alpha Test: A Simple Guide for Researchers. MalaysianJournalofMedicalSciences, 25, 85-99. https://doi.org/10.21315/mjms2018.25.6.9
[41]
Saaty, T.L. (2008) Decision Making with the Analytic Hierarchy Process. InternationalJournalofServicesSciences, 1, 83-98. https://doi.org/10.1504/ijssci.2008.017590
[42]
Forrester, J.W. (1994) System Dynamics, Systems Thinking, and Soft OR. SystemDynamicsReview, 10, 245-256. https://doi.org/10.1002/sdr.4260100211
[43]
Pidd, M. (2010) Why Modelling and Model Use Matter. JournaloftheOperationalResearchSociety, 61, 14-24. https://doi.org/10.1057/jors.2009.141
[44]
Senge P.M. and Forrester, J.W. (1980) Tests for Building Confidence in System Dynamics Models. System Dynamics, TIMS Studies in Management Sciences, 14, 209-228.
[45]
Barlas, Y. (1989) Multiple Tests for Validation of System Dynamics Type of Simulation Models. EuropeanJournalofOperationalResearch, 42, 59-87. https://doi.org/10.1016/0377-2217(89)90059-3
[46]
Jaafari, A. (2003) Project Management in the Age of Complexity and Change. Project Management Journal, 34, 47-57. https://doi.org/10.1177/875697280303400407
[47]
Dangerfield, B., Green, S. and Austin, S. (2010) Understanding Construction Competitiveness: The Contribution of System Dynamics. Construction Innovation, 10, 408-420. https://doi.org/10.1108/14714171011083579
[48]
Coyle, G. (1998) The Practice of System Dynamics: Milestones, Lessons and Ideas from 30 Years Experience. System Dynamics Review, 14, 343-365. https://doi.org/10.1002/(sici)1099-1727(199824)14:4<343::aid-sdr156>3.0.co;2-d