核设施建造过程中一项不符合项处理研究及启示
|
Abstract:
核设施在建造、运行过程产生不符合项是正常现象。产生不符合项的原因及其责任是多方面的,安全质量管理人员对不符合项的存在认识不足。通过对核设施建造过程中的水泥配比这一不符合项处理案例的原因分析及后续采取的纠正预防措施,提升核从业人员对不符合项的正确认识。正确处理不符合项可以有效地提升管理和技术水平,针对不符合项的纠正整改,提出了对核设施相关单位的管理建议和监管建议。
It is normal for NCR to occur during the construction and operation of nuclear facilities. There are many reasons and responsibilities for NCR, and the safety and quality management personnel have an insufficient understanding of the existence of NCR. Through the analysis of the causes of the NCR treatment case of cement ratio in the construction process of nuclear facilities and the subsequent corrective and preventive measures, the correct understanding of nuclear practitioners on NCR is improved. The correct treatment of NCR can effectively improve the management and technical level. In view of the rectification of NCR items, the management and supervision suggestions for the relevant units of nuclear facilities are put forward.
[1] | 国家核安全局. 核电厂质量保证安全规定[Z]. 1991-07-27. |
[2] | 国家国防科技工业局. 军工核安全设备制造阶段不符合项监督管理要求(试行) [Z]. 军核安监[2021] 206号. |
[3] | 国防科工委. 国防科技工业军用核设施质量保证规定[Z]. 科工法[2005] 311号. |
[4] | 程建秀, 景文信, 杨树林. 核设施质量保证基础教程[M]. 北京: 原子能出版社, 2001. |
[5] | 吴涛, 尤完, 李君, 等. GB/T 50326-2017建筑工程项目管理规范[S]. 北京: 中国建筑工业出版社, 2017. |
[6] | 赵微微, 李可用. 建筑施工特殊过程控制分析[EB/OL]. https://www.gwyoo.com/lunwen/jianzhulunwen/jzhshglw/201708/651422.html, 2022-08-07. |
[7] | 丁威, 冷发光, 艾永祥, 等. JGJ 55-2011普通混凝土配合比设计规程[S]. 北京: 中国建筑工业出版社, 2011. |
[8] | 国家国防科技工业局. 国防科技工业军用核设施安全许可管理办法[Z]. 科工核应安[2020] 1196号. |