Ghanaian construction projects encounter a number of challenges, including low health, safety, and environmental requirements, poor performance, and time and cost overruns. To provide value for money (VFM) on government infrastructure projects in Ghana, this research assesses the roles of project consultants, specifically architects and quantity surveyors, and highlights important obstacles. A cross-sectional survey design involving architects and quantity surveyors yielded a 96% response rate after 100 questionnaires were distributed. Consultants’ responsibilities also include monitoring standards compliance, providing advice on delays, controlling budgets, and advising on project completion dates. Difficulties encompass a lack of promptness in decision-making, unethical conduct, political pressure, and inadequate focus on contract administration and construction audits. Project urgency, longevity, political clout, timely decision-making, and team experience are important variables that impact VFM. Policy makers and construction management practitioners should take note of the implications for Ghana’s public infrastructure projects.
References
[1]
Dadzie, J., Abdul-Aziz, A.R. and Kwame, A. (2012) Performance of Consultants on Government Projects in Ghana: Client and Contractor Perspective. InternationalJournalofBusinessandSocialResearch, 2, 256-267.
[2]
Fugar, F.D. and Agyakwah-Baah, A.B. (2010) Delays in Building Construction Projects in Ghana. AustralasianJournalofConstructionEconomicsandBuilding, 10, 103-106. https://doi.org/10.5130/ajceb.v10i1/2.1592
[3]
Kwakye, A.A. (1997) Construction Project Administration in Practice. Longman.
[4]
Younis, J. (2019) The Role of Consultants in Construction Projects: How to Improve Your ROI. https://www.alpinme.com/the-role-of-consultants-in-construction-projects-how-to-improve-your-roi/
[5]
Teerds, H. and Avermaete, T. (2015) ‘The Roles of the Architect: Toward a Theory of Practice’, In: Frausto, S., Ed., LexiconNo1: OntheRoleoftheArchitect, The Berlage Center for Advanced Studies in Architecture and Urban Design, 7-11.
[6]
Duffy, F. and Rabeneck, A. (2013) Professionalism and Architects in the 21st Century. BuildingResearch&Information, 41, 115-122. https://doi.org/10.1080/09613218.2013.724541
[7]
Zakaria, I.B., Mohamed, M.R.B., Ahzahar, N. and Hashim, S.Z. (2015) A Study on Leadership Skills of Project Manager for a Successful Construction Project. InternationalAcademicResearchJournalofSocialScience, 1, 89-94.
[8]
Olatunji, S.O., Olawumi, T.O. and Awodele, O.A. (2017) Achieving Value for Money (VFM) in Construction Projects. JournalofCivilandEnvironmentalResearch, 9, 54-64.
[9]
Nsiah-Asare, E. and Prempeh, K.B. (2016) Measures of Ensuring Value for Money in Public Procurement: A Case of Selected Polytechnics in Ghana. JournalofLogisticsManagement, 5, 22-31.
[10]
Barnett, C., Barr, J., Christie, A., Duff, B. and Hert, S. (2010) Measuring the Impact and Value for Money of Governance and Conflict Programmes. Final Report, ITAD.
[11]
Jackson, P. (2012) Value for Money and International Development: Deconstructing Myths to Promote a More Constructive Discussion. Organization for Economic Cooperation and Development.
[12]
MacDonald, C., Walker, D.H.T. and Moussa, N. (2012) Value for Money in Project Alliances. InternationalJournalofManagingProjectsinBusiness, 5, 311-324. https://doi.org/10.1108/17538371211214969
[13]
World Bank (2016) The World Bank Procurement Regulations for IPF Borrowers. Procurement in Investment Project Financing, Goods, Works, Non-Consulting and Consulting Services. https://ewsdata.rightsindevelopment.org/files/documents/18/WB-P178418_czA4Hzx.pdf
[14]
NAO (2017) Assessing Value for Money.
[15]
Ofori-Kuragu, J.K., Owusu-Manu, D. and Ayarkwa, J. (2016) The Case for a Construction Industry Council in Ghana. JournalofConstructioninDevelopingCountries, 21, 131-149. https://doi.org/10.21315/jcdc2016.21.2.7
[16]
Ameyaw, C., Adjei-Kumi, T. and Owusu-Manu, D. (2015) Exploring Value for Money (VfM) Assessment Methods of Public-Private Partnership Projects in Ghana. JournalofFinancialManagementofPropertyandConstruction, 20, 268-285. https://doi.org/10.1108/jfmpc-01-2015-0003
[17]
Mohd-Rahim, F.A., Abd-Rahim, M.S., Zainon, N., Chuing, L.S. and Abd-Samad, Z. (2018) Project Life Cycle Risk of Public-Private Partnership (PPP) Projects for Construction Sustainability. JournalofDesignandBuiltEnvironment, No. 1, 39-53. https://doi.org/10.22452/jdbe.sp2018no1.4
[18]
Ayettey, D.N.A. and Danso, H. (2018) Contractor Selection Criteria in Ghanaian Construction Industry: Benefits and Challenges. JournalofBuildingConstructionandPlanningResearch, 6, 278-297. https://doi.org/10.4236/jbcpr.2018.64019
[19]
Ansell, M., Holmes, M., Evans, R., Pasquire, C. and Price, A. (2009) Delivering Best Value in Highways Major Maintenance Schemes: Case Study. JournalofConstructionEngineeringandManagement, 135, 235-245. https://doi.org/10.1061/(asce)0733-9364(2009)135:4(235)
[20]
Semen, K.K. (2014) Achievement of Value for Money in Local Government Authorities: A Case of Kahama Town Council. Master’s Degree, Mzumbe University.
[21]
Dadzie, E.B. (2019) The Effectiveness of Procurement Systems in Achieving Quality Service by MMDAS in Ghana African. JournalofProcurement, Logistics & SupplyChainManagement, 1, 58-89.
[22]
Jatarona, N.A., Yusof, A.M., Ismail, S. and Saar, C.C. (2016) Public Construction Projects Performance in Malaysia. JournalofSoutheastAsianResearch, 2016, Article ID: 940838. https://doi.org/10.5171/2016.940838
[23]
Sohail, M. and Cavill, S. (2008) Accountability to Prevent Corruption in Construction Projects. JournalofConstructionEngineeringandManagement, 134, 729-738. https://doi.org/10.1061/(asce)0733-9364(2008)134:9(729)
[24]
Twumasi-Ampofo, K., Osei-Tutu, E., Decardi-Nelson, I. and Ofori, P.A. (2014) A Model for Reactivating Abandoned Public Housing Projects in Ghana. CivilandEnvironmentalResearch, 6, 6-16.