In view of the waste of transport capacity caused by a single train formation mode due to the uneven temporal and spatial distribution of passenger flow in the early stage of intercity railway opening, starting from the train operation cost, the operation schemes of large and small marshalling trains with various stop modes are studied. Taking the minimization of train operation cost as the objective function, taking the number of running trains and parking scheme of large and small marshalling trains as decision variables, and comprehensively considering the constraints such as train section full load rate and OD service frequency, the operation scheme model of large and small marshalling trains is constructed. The genetic algorithm is used to solve the problem, and the operation scheme of large and small marshalling trains in the whole day is obtained. Taking Guangqing intercity railway and Guangzhou east ring intercity railway as an example, compared with the current train operation scheme, the large and small marshalling train operation scheme with multi stop mode can reduce the train operation cost by 59%, and the average daily section load ratio can be increased from 0.2888 to 0.8665, which shows that the large and small marshalling train operation scheme with multi stop mode can effectively reduce the train operation cost and improve the section full load rate.
References
[1]
Bi, Y. X., Liu, J. H., & Jiang, Z. B. (2006). Analysis on the Impact of Mixed Operation of Different Groups of Trains on Urban Rapid Rail Transit Lines. Urban Rail Transit Research, 9, 54-57.
[2]
Chang, Y. H., Yeh, C. H., & Shen, C. C. (2000). A Multiobjective Model for Passenger Train Services Planning: Application to Taiwan Region’s High-Speed Rail Line. Transportation Research Part B: Methodological, 34, 91-106. https://doi.org/10.1016/S0191-2615(99)00013-2
[3]
Claessens, M. T., Dijk, N. M. V., & Zwaneveld, P. J. (2007). Cost Optimal Allocation of Rail Passenger Lines. European Journal of Operational Research, 110, 474-489. https://doi.org/10.1016/S0377-2217(97)00271-3
[4]
Goossensaab, J. W. (2006). On Solving Multi-Type Railway Line Planning Problems. European Journal of Operational Research, 168,403-424. https://doi.org/10.1016/j.ejor.2004.04.036
[5]
He, B. S. (2014). Research on the Theory and Method of Coordinated Optimization of High-Speed Railway Train Operation Scheme and Train Operation Diagram. PhD Dissertation, Beijing: Beijing Jiaotong University.
[6]
Huang, Z. P. (2015). Research on Intercity Train Operation Scheme Based on Passenger Travel Choice Behavior. Journal of Wuhan University of Technology (Traffic Science and Engineering Edition), No. 6, 1135-1136.
[7]
Huang, Z. P. (2018). Intercity Train Operation Scheme Based on Travel Time Satisfaction. Journal of Lanzhou Jiaotong University, 37, 22-25.
[8]
Jiang, M. M. (2015). Research on Optimization of Intercity Railway Train Stopover Scheme. MA Thesis, Beijing: Beijing Jiaotong University.
[9]
Liu, S. (2020). Study on the Effect of Multi-Group Train Operation Scheme of Intercity Railway. MA Thesis, Beijing: Beijing Jiaotong University.
[10]
Miao, W. L., Ni, S. Q., Pang, T., & Wang, W. X. (2017). Research on Optimization of Intercity Train Frequency Based on Time Period Division. Railway Transportation and Economy, 39, 7-8.
[11]
Sun, R. J., & Lu, Y. (2017). Research on Intercity Railway Commuter Travel Based on Passenger Travel Characteristics of Beijing-Tianjin. Smart City, No. 6, 63-64.
[12]
Tian, Y. L. (2020). Optimization of Standardized Train Operation Scheme of Changzhutan Intercity Railway. Smart City, No. 20, 11-13.
[13]
Xu, R. H., & Zou, X. L. (2005). Research on Optimization Method of Passenger Dedicated Line Train Operation Scheme. Journal of Tongji University (Natural Science Edition), 33, 1608-1611.
[14]
Yang, X. Y. (2011). Characteristics of Passenger Travel Behavior of Chengmianle Intercity Railway.MA Thesis, Beijing: Beijing Jiaotong University.