The development of prefabricated buildings is changing rapidly, and production scheduling has an important impact on its development, so the optimization of production scheduling for prefabricated building components has been of particular concern to the construction industry in recent years. This paper conducts bibliometric and visuals analysis of production scheduling literature in the Scopus database by using VOS viewer analysis software, and study in-depth a series of methods and optimization techniques developed and adopted in recent years for production scheduling of prefabricated buildings. This paper summarizes the general trends in production scheduling for prefabricated buildings in the last decade and provides insights into the technologies and methods that have enabled the optimization of production scheduling problems in recent years. The potential for effective integration and consolidation between these new technologies in the context of production scheduling is also explored in the future with the rise of emerging technologies such as artificial intelligence techniques and machine learning. In conclusion, production scheduling optimization methods for prefabricated buildings should be continuously innovated and effectively integrated so as to effectively promote the development of prefabricated buildings and accelerate the transformation and upgrading of the construction industry.
References
[1]
Bataglin, F. S., Viana, D. D., Formoso, C. T., & Bulhões, I. R. (2020). Model for Planning and Controlling the Delivery and Assembly of Engineer-to-Order Prefabricated Building Systems: Exploring Synergies between Lean and BIM. Canadian Journal of Civil Engineering, 47, 165-177. https://doi.org/10.1139/cjce-2018-0462
[2]
Chang, C., Wang, M., & Wang, S. (2022). Production Scheduling Optimization of Prefabricated Components Based on Improved Artificial Fish Swarm Algorithm. In Proceedings of the 6th International Conference on Computer Science and Application Engineering (pp. 1-5). Association for Computing Machinery. https://doi.org/10.1145/3565387.3565427
[3]
Chen, J., & Liu, X. (2023). GEP Algorithm-Based Optimization Method for PCs Production Scheduling under Due Date Variation. In 2023 4th International Conference on Computer Engineering and Application (ICCEA) (pp. 347-352). IEEE. https://doi.org/10.1109/ICCEA58433.2023.10135444
[4]
Chen, W., Zhao, Y., Yu, Y., Chen, K., & Arashpour, M. (2020). Collaborative Scheduling of On-Site and Off-Site Operations in Prefabrication. Sustainability, 12, Article 9266. https://doi.org/10.3390/su12219266
[5]
Du, J., Dong, P., & Sugumaran, V. (2020). Dynamic Production Scheduling for Prefabricated Components Considering the Demand Fluctuation. Intelligent Automation & Soft Computing, 26, 715-723. https://doi.org/10.32604/iasc.2020.010105
[6]
Guo, K., & Zhang, L. (2022). Multi-Objective Optimization for Improved Project Management: Current Status and Future Directions. Automation in Construction, 139, Article 104256. https://doi.org/10.1016/j.autcon.2022.104256
[7]
Huang, R., Li, K., Liu, G., Shrestha, A., Chang, R., & Tang, X. (2022). A Bi-Level Model and Hybrid Heuristic Algorithm for the Optimal Location of Prefabricated Building Industrial Park. Engineering Applications of Artificial Intelligence, 116, Article 105393. https://doi.org/10.1016/j.engappai.2022.105393
[8]
Jiang, W., & Wu, L. (2021). Flow Shop Optimization of Hybrid Make-to-Order and Make-to-Stock in Precast Concrete Component Production. Journal of Cleaner Production, 297, Article 126708. https://doi.org/10.1016/j.jclepro.2021.126708
[9]
Li, J., Bai, S.-C., Duan, P., Sang, H., Han, Y., & Zheng, Z. (2019a). An Improved Artificial Bee Colony Algorithm for Addressing Distributed Flow Shop with Distance Coefficient in a prefabricated System. International Journal of Production Research, 57, 6922-6942. https://doi.org/10.1080/00207543.2019.1571687
[10]
Li, X., Shen, G. Q., Wu, P., Xue, F., Chi, H., & Li, C. Z. (2019b). Developing a Conceptual Framework of Smart Work Packaging for Constraints Management in Prefabrication Housing Production. Advanced Engineering Informatics, 42, Article 100938. https://doi.org/10.1016/j.aei.2019.100938
[11]
Liu, W., Tao, X., Mao, C., & He, W. (2023). Scheduling Optimization for Production of Prefabricated Components with Parallel Work of Serial Machines. Automation in Construction, 148, Article 104770. https://doi.org/10.1016/j.autcon.2023.104770
[12]
Peiris, A., Hui, F. K. P., Duffield, C., & Ngo, T. (2023). Production Scheduling in Modular Construction: Metaheuristics and Future Directions. Automation in Construction, 150, Article 104851. https://doi.org/10.1016/j.autcon.2023.104851
[13]
Ruan, M., & Xu, F. (2022). Improved Eight-Process Model of Precast Component Production Scheduling Considering Resource Constraints. Journal of Civil Engineering and Management, 28, 208-222. https://doi.org/10.3846/jcem.2022.16454
[14]
Song, Y., Wang, J., Lu, J., & Si, X. (2023). Research on Collaborative Scheduling of Multiple Projects of Prefabricated Building Based on the Niche Genetic-Raccoon Family Optimization Algorithm. Alexandria Engineering Journal, 64, 1015-1033. https://doi.org/10.1016/j.aej.2022.08.054
[15]
Wang, D., Liu, G., Li, K., Wang, T., Shrestha, A., Martek, I., & Tao, X. (2018a). Layout Optimization Model for the Production Planning of Precast Concrete Building Components. Sustainability, 10, Article 1807. https://doi.org/10.3390/su10061807
[16]
Wang, J., & Liu, H. (2023). Integrated Optimization of Stochastic Resource Scheduling and Machine Maintenance in Prefabricated Component Production Processes. Automation in Construction, 154, Article 105030. https://doi.org/10.1016/j.autcon.2023.105030
[17]
Wang, Q., Xu, X., Ding, X., Chen, T., & Deng, R. (2023). Quality Evaluation Approach for Prefabricated Buildings Using Ant Colony Algorithm and Simulated Annealing Algorithm to Optimize the Projection Pursuit Model. Buildings, 13, Article 2307. https://doi.org/10.3390/buildings13092307
[18]
Wang, Z., Hu, H., & Gong, J. (2018b). Framework for Modeling Operational Uncertainty to Optimize Offsite Production Scheduling of Precast Components. Automation in Construction, 86, 69-80. https://doi.org/10.1016/j.autcon.2017.10.026
[19]
Xie, L., Chen, Y., & Chang, R. (2021). Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm. Applied Sciences, 11, Article 5531. https://doi.org/10.3390/app11125531
[20]
Xu, Z., Wang, X., & Rao, Z. (2020). Automated Optimization for the Production Scheduling of Prefabricated Elements Based on the Genetic Algorithm and IFC Object Segmentation. Processes, 8, Article 1593. https://doi.org/10.3390/pr8121593
[21]
Yu, M., Li, T., & Ma, J. (2022). Joint Optimization Method of Production Scheduling for Prefabricated Components Based on Preventive Maintenance. In 2022 41st Chinese Control Conference (CCC) (pp. 1940-1944). IEEE. https://doi.org/10.23919/CCC55666.2022.9901757
[22]
Yu, X. (2021). A RBF Fuzzy Logic Neural Network Algorithm for Construction Resource Scheduling. Journal of Intelligent & Fuzzy Systems, 41, 4937-4945. https://doi.org/10.3233/JIFS-189980
[23]
Yuan, Y., Ye, S., Lin, L., & Gen, M. (2021a). Multi-Objective Multi-Mode Resource-Con-strained Project Scheduling with Fuzzy Activity Durations in Prefabricated Building Construction. Computers & Industrial Engineering, 158, Article 107316. https://doi.org/10.1016/j.cie.2021.107316
[24]
Yuan, Y., Ye, S., Yang, H., & Lin, L. (2021b). A Cooperative Co-Evolution Algorithm for Fuzzy Production Planning and Scheduling in Prefabricated Building Construction. In Proceedings of the 2021 International Conference on Bioinformatics and Intelligent Computing (pp. 269-274). Association for Computing Machinery. https://doi.org/10.1145/3448748.3448791
[25]
Yuan, Z., Qiao, Y., Guo, Y., Wang, Y., Chen, C., & Wang, W. (2020). Research on Lean Planning and Optimization for Precast Component Production Based on Discrete Event Simulation. Advances in Civil Engineering, 2020, Article ID: 8814914. https://doi.org/10.1155/2020/8814914
[26]
Zaalouk, A., Moon, S., & Han, S. (2023). Operations Planning and Scheduling in Off-Site Construction Supply Chain Management: Scope Definition and Future Directions. Automation in Construction, 153, Article 104952. https://doi.org/10.1016/j.autcon.2023.104952
[27]
Zhai, Y., Xu, G., & Huang, G. Q. (2019). Buffer Space Hedging Enabled Production Time Variation Coordination in Prefabricated Construction. Computers & Industrial Engineering, 137, Article 106082. https://doi.org/10.1016/j.cie.2019.106082