Located in Shangri-La county, Yunnan Province,
China’s biggest underground nonferrous mine Pulang Copper Mine is under
construction. To date, the defined copper reserves at the Pulang Copper Mine are 4.8 million tonnes of copper
and an average grade of 0.34%. The mineralized zone is 2300 m long, 600 - 800 m wide, and 1000 m high in
a dome shape. The first-stage mining and processing capacity is 12.5 million
tonnes of ore per year. By geotechnical investigation, ore haulage is adopted
via a drift and ore pass development system. From mineralogical analysis, a
majority of the Pulang copper ore body is classified as a type III rock, which
is generally considered to be suitable for block-caving methods. As an update to the traditional mine-to-mill approach, a cave-to-mill integrated production
concept is then introduced. This is essentially the integration of underground
mine production scheduling and monitoring with surface mineral processing
management based on
References
[1]
Brown, E.T. (2003) Block Caving Geomechanics. Julius Kruttschnitt Mineral Research Centre, Queensland.
[2]
China Enfi Engineering Corporation (2014) Preliminary Design for the First-Stage Mining at Pulang Copper Mine. Beijing.
[3]
Clayton, A., Stead, D. and Kinakin, D. (2015) A Discontinuum Numerical Modelling Investigation of Failure Mechanisms. Proceedings of ISRM Congress, Montreal, 14-17 September 2015, 56-59.
[4]
Donati, D., Francioni, M. and Stead, D. (2015) The Influence of Shales on Flexural Toppling in Anisotropic Rock Slopes: A Numerical Modelling Study. Proceedings of CGS Conference, Quebec City, 3-5 July 2015, 17-21.
[5]
Eberhardt, E., Woo, K., Stead, D. and Elmo, D. (2015) Transitioning from Open Pit to Underground Mass Mining: Meeting the Rock Engineering Challenges of Going Deeper. Proceedings of ISRM Congress, Montreal, 14-17 September 2015, 47-49.
[6]
Elmo, D. and O’Connor, C. (2007) Integrated Modelling of Subsidence Mechanisms and Impacts due to Mine Caving. CIM Conference and Exhibition, Montreal, 23-26 February 2007.
[7]
Elmo, D., Vyazmensky, A., Stead, D. and Rance, J. (2008) A Hybrid FEM/DEM Approach to Model the Interaction between Open-Pit and Underground Block-Caving Mining. Proceedings of 1st Canada-U.S. Rock Mechanics Symposium, Vancouver, 27-31 May 2007, 114-115.
[8]
Feng, X.L. (2010) Research into the Digital Evaluation and Simulation Technique for Ore-bearing Rock Engineering Quality of Block Caving Method. Central South University, Changsha.
[9]
Feng, X.L., Li, D., Wang, L.G., et al. (2011) A New Method of Block Shape Classification. China Technology and Science, 54, 110-115. https://doi.org/10.1007/s11431-010-4221-z
[10]
Flores, G. and Karzulovic, A. (2004) Geotechnical Guidelines for a Transition from Open Pit to Underground Mining. Project ICS-II, Task 4. RCSS Express, Moskow.
[11]
Gilbride, L.J., Free, K.S. and Kehrman, R. (2005) Modeling Block Cave Subsidence at the Molycorp, Inc., Questa Mine. Proceedings of 40th U.S. Symposium on Rock Mechanics, Anchorage, 25-29 June 2005, 56-60.
[12]
He, C.S. (2006) Ore-bearing Rock Cavability Evaluation, Classification and Domain Definition for Block Caving Method. Central South University, Changsha.
[13]
Karzulovic, A. (1990) Evaluation of Angle of Break to Define the Subsidence Crater of Rio Blanco Mine’s Panel III. Technical Report. Andina Division, CODELCO-Chile, Santiago.
[14]
Karzulovic, A., Cavieres, P. and Pardo, C. (1999) Caving Subsidence at El Teniente Mine. Proceedings of SIMIN 99, Santiago, 17-19 May 1999, 9-14.
[15]
Laubscher, D.H. (2000) Block Caving Manual. Prepared for International Caving Study, JKMRC and Itasca Consulting Group, Inc., Brisbane.
[16]
Rogers, S.F., Kennard, D.K., Dershowitz, W.S. and van As, A. (2008) Characterising the in Situ Fragmentation of a Fractured Rock Mass Using A Discrete Fracture Network Approach. Proceedings of 1st Canada-U.S. Rock Mechanics Symposium, Vancouver, 27-31 May 2007, 48-50.
[17]
Van As, A. (2003) Subsidence Definitions for Block Caving Mines. Technical Report. Francis II Express, Paris.
[18]
Vyazmensky, A., Elmo, D., Stead, D. and Rance, J. (2008) Combined Finite-Discrete element Modelling of Surface Subsidence Associated with Block Caving Mining. Proceedings of 1st Canada-U.S. Rock Mechanics Symposium, Vancouver, 27-31 May 2007, 33-35.
[19]
Zhang, W. (2014) Evaluation of Effect of Viscosity Changes on Bubble Size in a Mechanical Flotation Cell. Transactions of Nonferrous Metals Society of China, 24, 2964-2968. https://doi.org/10.1016/S1003-6326(14)63432-4
[20]
Zhang, W. (2016) A Review on the Dissection of Quenched Blast Furnaces—Spanning from the Early 1950s to the 1970s. Processes, 4, Article No. 36. https://doi.org/10.3390/pr4040036
[21]
Zhang, W. (2016) Technical Problem Identification for the Failures of the Liberty Ships. Challenges, 7, Article No. 20. https://doi.org/10.3390/challe7020020
[22]
Zhang, W. (2016) Optimizing Performance of SABC Comminution Circuit of the Wushan Porphyry Copper Mine—A Practical Approach. Minerals, 6, Article No. 127. https://doi.org/10.3390/min6040127
[23]
Zhang, W., Tan, Z., Li, T., Guan, X., Zhou, S., Li, H. and Wang, C. (2023) An Innovative Sensor-Based Approach for Evaluating Performance of Flotation Circuit at the Expansion of Toromocho Copper Mine. Processes, 11, Article No. 1230. https://doi.org/10.3390/pr11041230