|
冰层锚杆拉拔室内试验研究
|
Abstract:
冰层锚固在实际工程中较少,但冰层在寒区冻土工程中属于常见现象。开展了冰层中预制锚杆、现浇锚杆拉拔室内试验,分析了不同制作方式的锚杆拉拔破坏模式、荷载位移特征。结果表明:锚杆制作方式不同,锚固效果明显不同,现浇锚杆要比预制锚杆锚固效果佳,现浇注浆在冰层中形成局部扩体,增大锚杆–冰界面接触面积,锚杆承载力增强。
Ice anchors are less common in actual projects, but ice is a common phenomenon in cold zone permafrost projects. Indoor tests on the pullout of prefabricated anchor and cast-in-place anchor in ice were carried out, and the pullout damage patterns and load-displacement characteristics of anchor made in different ways were analyzed. The results showed that the anchoring effect was significantly different with different anchor production methods, and the cast-in-place anchor had a better anchoring effect than the prefabricated anchor, and the cast-in-place grout formed a local expansion in the ice, which increased the contact area of anchor-ice interface and the anchor bearing capacity.
[1] | 陈昌富, 梁冠亭, 汤宇, 等. 锚杆锚固体与土体界面特性室内测试新方法[J]. 岩土工程学报, 2015, 37(6): 1115-1122. |
[2] | 王建康, 曹晓卫, 王庆凯, 等. 冰层弯曲强度和弹性模量与等效冰温的试验关系[J]. 南水北调与水利科技, 2016, 14(6): 75-80. |
[3] | 严健, 何川, 李栋林, 等. 冰水堆积体隧道施工过程变形与受力分析[J]. 铁道标准设计, 2017, 61(1): 65-71. |
[4] | 熊治文, 廖小平, 朱本珍, 等. 多年冻土地区路堑边坡病害及其整治原则[J]. 铁道工程学报, 2010, 27(7): 6-10. |
[5] | Zhu, S., Chen, C., Zhang, G., et al. (2022) Theoretical and Experimental Investigations of Anchoring Force Loss Behavior for Prestressed Ground Anchors. Canadian Geotechnical Journal, 59, 1587-1601.
https://doi.org/10.1139/cgj-2021-0220 |
[6] | Zhu, S., Chen, C., Mao, F., et al. (2021) Application of Disturbed State Concept for Load-Transfer Modeling of Recoverable Anchors in Layer Soils. Computers and Geotechnics, 137, Article ID: 104292.
https://doi.org/10.1016/j.compgeo.2021.104292 |
[7] | 夏元友, 陈晨, NI Qing. 基于透明土的4种锚杆拔出对比模型试验[J]. 岩土工程学报, 2017, 39(3): 399-407. |
[8] | 夏元友, 陈晨, NI Qing. 透明土中连续球体型锚杆拔出机理研究[J]. 岩土工程学报, 2017, 39(5): 804-812. |