The state of Cameroon, faced with the
situation the electricity deficits, is promoting the
development of renewable energies in general and to meet rural electrification
needs in particular. The purpose of this work is to study the feasibility of
the MHP of Batcheu, to show its contribution to sustainable development in this
locality and to prove that it is a profitable project. After study, it appears
that the waterfall of Batcheu is favourable to the establishment of a MHP with
an installed power of 260 kW with an operating diagram corresponding to a
Francis turbine. Given that it is a renewable energy that can supply more
than 800 households in rural areas, its contribution to sustainable development is obvious. Its investment
cost is estimated at 171,465,396 FCFA. It is a profitable project
with a payback time of 7 years and 2 months.
References
[1]
Antoine, F.N., Bertrand, G.T.C., Bertrand, K.S.E. and Blanco, C.J.C. (2020) Sustainable Development around Small-Scale Mining Areas by the Development of Micro Hydro Power: Application Cases in Cameroon. Journal of Power and Energy Engineering, 8, 36-48. https://doi.org/10.4236/jpee.2020.83003
[2]
Elie Bertrand, K.S., Abraham, K. and Lucien, M. (2020) Sustainable Energy through Wind Speed and Power Density Analysis in Ambam, South Region of Cameroon. Frontiers in Energy Research, 8, Article 176. https://doi.org/10.3389/fenrg.2020.00176
[3]
Elie Bertrand, K.S., Hamandjoda, O. and Jean, N. (2016) Modeling of Characteristics of Wind by Weibull Distribution and Estimation of Wind Energy in Douala, Littoral Region of Cameroon. International Journal of Innovative Research in Science, Engineering and Technology, 5, 6601-6608. https://doi.org/10.15680/IJIRSET.2016.0505001
Kengne Signe, E.B., Hamandjoda, O. and Nganhou, J. (2017) Methodology of Feasibility Studies of Micro-Hydro Power Plants in Cameroon: Case of the Micro-Hydro of KEMKEN. Energy Procedia, 119, 17-28. https://doi.org/10.1016/j.egypro.2017.07.042
[6]
Tekounegning (2010) Feasibility Study of de MHPP in the West Region of Cameroon. Ph.D. Thesis, University of Dschang, Yaoundé.
[7]
Elie Bertrand, K.S., Hamandjoda, O., Nganhou, J. and Wegang, L. (2017) Technical and Economic Feasibility Studies of a Micro Hydropower Plant in Cameroon for a Sustainable Development. Journal of Power and Energy Engineering, 5, 64-73. https://doi.org/10.4236/jpee.2017.59006
[8]
Rapport Centre d’Etudes Techniques Maritimes et Fluviales (2012) Microcentrales hydroélectriques, Note de synthèse’, Ministère de l’Ecologie du Développement Durable, des Transport et du Logement en France.
[9]
Elie Bertrand, K.S., Hamandjoda, O., Gubong, T.C. and Fanyep, N.A. (2017) Modeling of Rainfall-Runoff by Artificial Neural Network for Micro Hydro Power Plant: A Case Study in Cameroon. The International Journal of Innovative Research in Science, Engineering and Technology, 6, 15511-15519.
[10]
National Institute of Statistics (INS) (2016) Brief Summary of Inflation over the First’s Nine Months of the Year. http://www.statistics-cameroon.org
[11]
(2011) LAW N° 2011/022 of Governing the Electricity Sector in Cameroon.
[12]
Elie Bertrand, K.S., Hamandjoda, O. and Nganhou, J. (2015) Local Blacksmith’s Activity in the West Region of Cameroon and Their Contribution to the Development of Micro Hydroelectric Power Plants in That Region. African Journal of Environmental Science and Technology, 9, 428-437. https://doi.org/10.5897/AJEST2014.1798
[13]
Blanco, C.J.C., Secretan, Y. and Mesquita, A.L.A. (2008) Decision Support System for Micro-Hydro Power Plants in the Amazon Region under a Sustainable Development Perspective. Energy for Sustainable Development, 12, 25-33. https://doi.org/10.1016/S0973-0826(08)60435-4
[14]
Kengne Signe, E.B., Bogno, B., Aillerie, M. and Oumarou, H. (2019) Performance in Feasibility Studies of Micro Hydro Power Plants. New Software Development and Application to the Case of Cameroon. Energy Procedia, 157, 1391-1403. https://doi.org/10.1016/j.egypro.2018.11.304