全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

浅谈房地产项目施工进度管理影响因素及管控措施
Discussion on the Influencing Factors and Control Measures of Construction Schedule Management of Real Estate Projects

DOI: 10.12677/MSE.2023.123030, PP. 276-280

Keywords: 房地产,进度管理
Real Estate
, Schedule Management

Full-Text   Cite this paper   Add to My Lib

Abstract:

房地产项目施工进度管控对节约开发成本、提高行业竞争力具有重大意义,本文分析了影响房地产施工进度的主要因素,并结合现场管理经验,针对性的从完善奖惩机制、制定进度计划、加强对劳动力和材料的管控、确保资金投入、合理安排施工工序、超前识别潜在风险等方面提出相应管理措施,对于加强施工进度控制,缩短施工周期具有较大帮助。
The construction schedule control of real estate projects is of great significance to saving development costs and improving the competitiveness of the industry. This paper analyzes the main factors affecting the construction schedule of real estate, and combines the field management experience. The corresponding management measures are put forward from the aspects of improving the reward and punishment mechanism, making schedule plans, strengthening the control of labor and materials, ensuring capital investment, rationally arranging construction procedures, and identifying potential risks in advance, which is of great help to strengthen the control of construction schedule and shorten the construction period.

References

[1]  吴镝. 房地产土建工程施工进度控制及管理措施探讨[J]. 中国房地产业, 2022(7): 121-123.
[2]  刘桂林. 房地产开发项目进度把控与风险管理[J]. 中国住宅设施, 2023(2): 130-132.
[3]  章占峰. 房地产土建施工进度的管控要点研究[J]. 房地产导刊, 2020(3): 163.
[4]  张丰, 白银, 蔡跃波. 低温条件下不同类型早强组分早强性能研究[J]. 人民长江, 2021, 52(5): 160-166.
[5]  张皓涵. 建筑施工机器人技术的应用与发展[J]. 广东建材, 2021, 37(8): 74-78.
[6]  王汝军. 住宅建筑设计的质量及进度管理研究[J]. 房地产世界, 2022(2): 149-151.
[7]  吴建新. 房地产建筑项目进度管理策略[J]. 大众标准化, 2023(1): 145-147.
[8]  茶仕光. 中小型房地产企业项目成本与进度管理分析[J]. 经济技术协作信息, 2022(13): 30-32.
[9]  冯辉. 房地产工程项目进度管理提效措施探析[J]. 智能建筑与工程机械, 2022, 4(4): 69-71.
[10]  张豫立. 房地产开发项目进度与质量管理[J]. 住宅与房地产, 2020(18): 114.
[11]  马腾. 基于进度风险管理的房地产项目开发预控内容及应对分析[J]. 建筑经济, 2022, 43(9): 49-53.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133