Shipbuilding—An Analysis from the Perspective of Enterprise Resources Planning System

DOI: 10.4236/wjet.2023.111008, PP. 81-112

Keywords: Shipbuilding, Shipyard, Production Structures, Enterprise Resource Planning, Processes Flow

Full-Text   Cite this paper   Add to My Lib

Abstract:

Designed as a tool for business intelligence, resource planning is used to manage the essentials of a business by integrating processes into a single system. Enterprise Resource Planning (ERP) solutions ensure all the organizational, operational, and procedural structures interconnection, which can be both an advantage and a disadvantage, knowing that inefficiency within one structure will lead to inefficiency in others. The originality of the approach consists in the unitary analysis of all processes which shipbuilding involves (design; evaluation of ship construction possibilities; contracting of works; contracting of supply of materials and equipment; presentation of inspections for the completed works reception; delivery of the ship into operation). The systemic approach is a notable contribution by highlighting the input and output quantities for the analyzed processes. Also, where it was found relevant, the diagrams highlight the owners of the process and show the interconnectivity of the functional departments within a shipyard. Although it is obviously the expression of in-depth knowledge of the peculiarities of Romanian shipyards, the authors hope that the work can support any shipyard that may be interested in knowing these structures (as a logical scheme mandatory to design a custom ERP software system).

References

[1]  “Mircea celBatrin” Naval Academy, Constanta, Romania.
https://www.anmb.ro/eng/
[2]  Kaune, J.E. (1979) Managing the Shipyard Process—Key to Success. Naval Engineers Journal, 91, 81-93.
https://doi.org/10.1111/j.1559-3584.1979.tb03914.x
[3]  Lee, D.K., Kim, Y., Hwang, I.H., et al. (2014) Study on a Process-Centric Modeling Methodology for Virtual Manufacturing of Ships and Offshore Structures in Shipyards. International Journal of Advanced Manufacturing Technology, 71, 621-633.
https://doi.org/10.1007/s00170-013-5498-4
[4]  Jeong, D., Kim, D., Choi, T. and Seo, Y. (2020) A Process-Based Modeling Method for Describing Production Processes of Ship Block Assembly Planning, Processes, 8, 880.
https://doi.org/10.3390/pr8070880
[5]  Lameira, P.I.D., Loureiro, E.S.P. and Benjamin, C.M. (2015) Optimization Design of Planning and Production Control in a Shipyard-Case Study: The Amazon Region. In: Maritime Technology and Engineering, CRC Press, London, 373-383.
[6]  Kafali, M., Unsan, Y. and Ozkok, M. (2018) A Production Planning and Control Methodology Proposal for Shipyards. Journal of ETA Maritime Science, 6, 47-59.
https://doi.org/10.5505/jems.2018.02986
[7]  Song, T. and Zhou, J. (2021) Research and Implementation of Lean Production Mode in Shipbuilding. Processes, 9, 2071.
https://doi.org/10.3390/pr9112071
[8]  Pinto, P.J.F., Grecco, C.H.D. and Cosenza, C.A.N. (2020) Fuzzy Model for the Priorization Analysis of Variable Quality Performance: An Approach in Shipbuilding. Fuzzy Information and Engineering, 12, 181-203.
https://doi.org/10.1080/16168658.2020.1792610
[9]  Johannessen, J.A. and Hauan, A. (1992) Reaching Out for Hierarchy: A Study of the Reorganizing of a Norwegian Shipyard. Cybernetics and Systems, 23, 169-189.
https://doi.org/10.1080/01969729208927456
[10]  Bernhard, B.S. (1993) Benefits of Quality Control Techniques in Series Ship Construction by Computer-Integrated Manufacturing. Marine Technology and SNAME News, 30, 308-318.
https://doi.org/10.5957/mt1.1993.30.4.308
[11]  Dwivedi, S.N. and Maffioli, P. (2003) Total Value Management in Shipbuilding. Total Quality Management & Business Excellence, 14, 549-569.
https://doi.org/10.1080/1478336032000053582
[12]  Blanco-Novoa, ó., Fernández-Caramés, T.M., Fraga-Lamas, P. and Vi-lar-Montesinos, M.A. (2018) A Practical Evaluation of Commercial Industrial Augmented Reality Systems in an Industry 4.0 Shipyard. IEEE Access, 6, 8201-8218.
https://ieeexplore.ieee.org/document/8281493
https://doi.org/10.1109/ACCESS.2018.2802699
[13]  Munitic, A., Dvornik, J. and Simundic, S. (2003) System Dynamics Continuous Com- puter Simulation Model of Shipbuilding Process. 1st International Industrial Simulation Conference, Valencia, 2003, 336-338.
https://www.bib.irb.hr/169783
[14]  Greenwood, A.G., Vanguri, S. and Walden, C.T. (2005) Simulation Optimization Decision Support System for Ship Panel Shop Operations. Proceedings of the Winter Simulation Conference, Orlando, FL, USA, 4 December 2005, 9 p.
https://ieeexplore.ieee.org/document/1574490
[15]  Cha, J.H., Roh, M.I. and Lee, K.Y. (2010) Integrated Simulation Framework for the Process Planning of Ships and Offshore Structures. Robotics and Computer Integrated Manufacturing, 26, 430-453.
https://doi.org/10.1016/j.rcim.2010.01.001
[16]  Ozkok, M. and Helvacioglu, I.H.A. (2013) Continuous Process Improvement Application in Shipbuilding. Brodogradnja, 64, 31-39.
[17]  Kang, S.K., Jung, H. and Lee, J.H. (2013) Active Discrete Event Simulation Using Probability Distribution of Shipbuilding Process. 4th International Conference on Information Science and Applications (ICISA), Pattaya, 24-26 June 2013, 1-3.
https://doi.org/10.1109/ICISA.2013.6579480
[18]  Back, M.G., Lee, D.K. and Woo, J.H. (2016) A Study for Production Simulation Model Generation System Based on Data Model at a Shipyard. International Journal of Naval Architecture and Ocean Engineering, 8, 496-510.
https://doi.org/10.1016/j.ijnaoe.2016.05.005
[19]  Park, K.P., Ham, S.H. and Lee, C.Y. (2016) Application and Validation of Production Planning Simulation in Shipbuilding. Ocean Engineering, 114, 154-167.
https://doi.org/10.1016/j.oceaneng.2016.01.008
[20]  Basan, N.P., Achkar, V.G. and Garcia-del-Valle, A. (2017) A Heuristic Simulation- Based Framework to Improve the Scheduling of Blocks Assembly and the Production Process in Shipbuilding. Winter Simulation Conference (WSC), Las Vegas, 3-6 December 2017, 3218-3229.
https://doi.org/10.1109/WSC.2017.8248040
[21]  Suheon, J., Saenal, S., Huiqiang, S., Yong-Kuk, J. and Jong Gye, S. (2020) System Development for Establishing Shipyard Mid-Term Production Plans Using Backward Process-Centric Simulation. International Journal of Naval Architecture and Ocean Engineering, 12, 20-37.
https://doi.org/10.1016/j.ijnaoe.2019.05.005
[22]  Medeiros, D.J., Traband, M., Tribble, A., Lepro, R., Fast, K. and Williams, D. (2000) Simulation Based Design for a Shipyard Manufacturing Process. 2000 Winter Simulation Conference (WSC), Orlando, 10-13 December 2000, 1411-1414.
https://doi.org/10.1109/WSC.2000.899118
[23]  Kim, H., Lee, S.S., Park, J.H. and Lee, J.G. (2005) A Model for a Simulation-Based Shipbuilding System in a Shipyard Manufacturing Process. International Journal of Computer Integrated Manufacturing, 18, 427-441.
https://doi.org/10.1080/09511920500064789
[24]  Stanic, V., Hadjina, M. and Matulja, T. (2018) Toward Shipbuilding 4.0—An Industry 4.0 Changing the Face of the Shipbuilding Industry. Brodogradnja, 69, 111-128.
https://doi.org/10.21278/brod69307
[25]  Fraga-Lamas, P., Fernandez-Carames, T.M. and Vilar-Montesinos, M.A.A. (2018) Review on Industrial Augmented Reality Systems for the Industry 4.0 Shipyard. IEEE Access, 6, 13358-13375.
https://doi.org/10.1109/ACCESS.2018.2808326
[26]  Lee, Y.G., Ju, S. and Woo, J.H. (2020) Simulation-Based Planning System for Shipbuilding. International Journal of Computer Integrated Manufacturing, 33, 626-641.
https://doi.org/10.1080/0951192X.2020.1775304
[27]  Pang, T.Y., Restrepo, J.P.D. and Miletic, M. (2021) Developing a Digital Twin and Digital Thread Framework for an “Industry 4.0” Shipyard. Applied Sciences-Basel, 11, 1097.
https://doi.org/10.3390/app11031097
[28]  Nam, S., Shen, H.Q. and Shin, J.G. (2018) SCP-Matrix Based Shipyard APS Design: Application to Long-Term Production Plan. International Journal of Naval Architecture and Ocean Engineering, 10, 741-761.
https://doi.org/10.1016/j.ijnaoe.2017.10.003
[29]  Cho, S., Lee, J.M. and Woo, J.H. (2021) Development of Production Planning System for Shipbuilding Using Component-Based Development Framework. International Journal of Naval Architecture and Ocean Engineering, 13, 405-430.
https://doi.org/10.1016/j.ijnaoe.2021.05.001
[30]  Lee, J.K., Lee, K.J. and Choi, H.R. (1995) DAS-Intelligent Scheduling Systems for Shipbuilding. AI Magazine, 16, 78-94.
[31]  Sharma, R. and Sha, O.P. (2007) Development of an ERP Model for Modularly Designed Ships for Medium Scale Shipyards I: Manufacturing Management. Journal of Marine Engineering and Technology A, 10, 17-43.
https://doi.org/10.1080/20464177.2007.11081885
[32]  Sharma, R. and Sha, O.P. (2007) Development of an ERP Model for Modularly Designed Ships for Medium Scale Shipyards II: Marketing Management. Journal of Marine Engineering and Technology A, 10, 45-65.
https://doi.org/10.1080/20464177.2007.11020202

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133