群洞开挖顺序对隧道仰坡的影响研究
|
Abstract:
随着城市化进程的加快,寸土寸金的城市建设局面,涌现出大量的岩土工程技术问题亟待解决。研究群洞的开挖顺序对隧道仰坡的影响已经成为了城市地下工程建设中必须面临的一项重要课题。本论文依托重庆市红岩村隧道群工程,采用数值模拟方法,分别对三种开挖顺序进行了模拟。结果表明,开挖顺序为“先开挖车站隧道,再开挖上部的主线隧道”时群洞开挖引起仰坡的竖向位移最小,即隧道群开挖对隧道仰坡的影响最小。
With the acceleration of urbanization and the situation of urban construction, a large number of geotechnical engineering problems have emerged to be solved urgently. It has become an important task to study the influence of excavation sequence of group caves on the slope of tunnel. Based on the Hongyancun Tunnel group Project in Chongqing, this paper adopts numerical simulation method to simulate three kinds of excavation sequence. The results show that when the excavation sequence is “first excavating station tunnel, then excavating upper main tunnel”, the vertical displacement of inverted slope caused by group excavation is the least, that is, the impact of group excavation on the inverted slope of tunnel is the least.
[1] | 杨举. 地下水封油库洞室群应力应变规律与设计优化研究[D]: [硕士学位论文]. 武汉: 中国地质大学(武汉), 2011. |
[2] | 刘会波, 肖明, 陈俊涛. 复杂地下洞室围岩开挖扰动空间效应参数化研究[J]. 四川大学学报: 工程科学版, 2012, 44(3): 47-54. |
[3] | Rousset, H.W.G. (1994) Thermoplastic Behavior of Deep Tunnels. Journal of Thermal Stresses, 17, 337-359.
https://doi.org/10.1080/01495739408946265 |
[4] | Rinne, M., Shen, B. and Backers, T. (2013) Modelling Fracture Propagation and Failure in a Rock Pillar under Mechanical and Thermal Loadings. Journal of Rock Mechanics & Geotechnical Engineering, 5, 73-83.
https://doi.org/10.1016/j.jrmge.2012.10.001 |
[5] | 万涛, 林刚, 习淑娟. 超小净距地铁三洞隧道群施工动态数值模拟[J]. 铁道工程学报, 2016, 33(12): 93-98. |
[6] | 李为洁. 小净距隧道断面施工过程的数值分析[J]. 广东建材, 2012, 28(7): 72-75. |
[7] | 王腊梅, 段方情, 张可能. 某隧道偏压段初期施工出现的问题及分析、处理[J]. 岩体工程界, 2007, 10(10): 71-73. |
[8] | 李伟, 杨琨, 施劭矗, 李弘毅, 俞凡. 四洞并行公路隧道群开挖稳定性影响因素研究[J]. 西部探矿工程, 2022, 34(1): 195-199. |
[9] | 李涵宇. 小净距大型洞室群稳定性研究[D]: [硕士学位论文]. 贵州: 贵州大学, 2021.
https://doi.org/10.27047/d.cnki.ggudu.2021.000250 |