全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

A Review on Quality Management of Prefabricated Buildings

DOI: 10.4236/cus.2022.102012, PP. 212-223

Keywords: Prefabricated Buildings, Quality Management, Literature Review

Full-Text   Cite this paper   Add to My Lib

Abstract:

This paper reviews the research on quality management of prefabricated buildings at home and abroad. In this paper, the literature reading method is used to summarize the development of prefabricated buildings at home and abroad, the research status of quality management, and the quality management of prefabricated buildings. The conclusion is that the quality management of prefabricated buildings is very necessary. Finally, combined with the development of prefabricated buildings in China, this paper puts forward the conclusion that it is necessary to further study and establish a perfect quality management mechanism in order to better promote prefabricated buildings.

References

[1]  Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., & Park, K. (2006). A Formalism for Utilization of Sensor Systems and Integrated Project Models for Active Construction Quality Control. Automation in Construction, 15, 124-138.
https://doi.org/10.1016/j.autcon.2005.01.008
[2]  Behzadan, A. H., Iqbal, A., & Kamat, V. R. (2011). A Collaborative Augmented Reality Based Modeling Environment for Construction Engineering and Management Education. In Proceedings of the 2011 Winter Simulation Conference (WSC) (pp. 3568-3576). Institute of Electrical and Electronics Engineers.
https://doi.org/10.1109/WSC.2011.6148051
[3]  Chen, J., & Wang, E. (2006). Internalization in Technology Innovation: A Case of CRM Adoption. In Proceedings of the 39th Annual Hawaii International Conference on System Sciences (p. 111a). Institute of Electrical and Electronics Engineers.
https://doi.org/10.1109/HICSS.2006.227
[4]  Dweiri, F. T., & Kablan, M. M. (2007). Using Fuzzy Decision Making for the Evaluation of the Project Management Internal Efficiency. Decision Support Systems, 42, 712-726.
https://doi.org/10.1016/j.dss.2005.04.001
[5]  Fard, M. M., Terouhid, S. A., Kibert, C. J., & Hakim, H. (2017). Safety Concerns Related to Modular/Prefabricated Building Construction. International Journal for Consumer & Product Safety, 24, 10-23.
https://doi.org/10.1080/17457300.2015.1047865
[6]  Gagnon, R. M. (1997). Design of Water Based Fire Protection Systems. Delmar Pub.
[7]  Hong, J., Shen, G. Q., Li, Z., Zhang, B., & Zhang, W. (2018). Barriers to Promoting Prefabricated Construction in China: A Cost-Benefit Analysis. Journal of Cleaner Production, 172, 649-660.
https://doi.org/10.1016/j.jclepro.2017.10.171
[8]  Ismail, F., Yusuwan, N. M., & Baharuddin, H. (2012). Management Factors for Successful IBS Projects Implementation. Procedia—Social and Behavioral Sciences, 68, 99-107.
https://doi.org/10.1016/j.sbspro.2012.12.210
[9]  Jabar, I. L., Ismail, F., & Mustafa, A. (2013). Issues in Managing Construction Phase of IBS Projects. Procedia—Social and Behavioral Sciences, 101, 81-89.
https://doi.org/10.1016/j.sbspro.2013.07.181
[10]  Jaillon, L., & Poon, C. S. (2009). The Evolution of Prefabricated Residential Building Systems in Hong Kong: A Review of the Public and the Private Sector. Automation in Construction, 18, 239-248.
https://doi.org/10.1016/j.autcon.2008.09.002
[11]  Jung, J. Y., Wang, Y. J., & Wu, S. (2009). Competitive Strategy, TQM Practice, and Continuous Improvement of International Project Management—A Contingency Study. International Journal of Quality & Reliability Management, 26, 164-183.
https://doi.org/10.1108/02656710910928806
[12]  Kasperzyk, C., Kim, M. K., & Brilakis, I. (2017). Automated Re-Prefabrication System for Buildings Using Robotics. Automation in Construction, 83, 184-195.
https://doi.org/10.1016/j.autcon.2017.08.002
[13]  Li, Y. S., Hwang, B. G., Shan, M., & Looi, K. Y. (2019). Developing a Knowledge-Based Decision Support System for Prefabricated Prefinished Volumetric Construction. IOP Conference Series Earth and Environmental Science, 385, Article ID: 012002.
https://doi.org/10.1088/1755-1315/385/1/012002
[14]  Loss, C., Piazza, M., & Zandonini, R. (2016a). Connections for Steel-Timber Hybrid Prefabricated Buildings. Part II: Innovative Modular Structures. Construction and Building Materials, 122, 796-808.
https://doi.org/10.1016/j.conbuildmat.2015.12.001
[15]  Loss, C., Piazza, M., & Zandonini, R. (2016b). Connections for Steel-Timber Hybrid Prefabricated Buildings. Part I: Experimental Tests. Construction and Building Materials, 122, 781-795.
https://doi.org/10.1016/j.conbuildmat.2015.12.002
[16]  Mao, C., Xie, F., Hou, L., Wu, P., Wang, J., & Wang, X. (2016). Cost Analysis for Sustainable Off-Site Construction Based on a Multiple-Case Study in China. Habitat International, 57, 215-222.
https://doi.org/10.1016/j.habitatint.2016.08.002
[17]  Mao, Y., & Xu, T. (2011). Research of 4M1E’s Effect on Engineering Quality Based on Structural Equation Model. Systems Engineering Procedia, 1, 213-220.
https://doi.org/10.1016/j.sepro.2011.08.034
[18]  Marasini, R., Dawood, N. N., & Hobbs, B. (2001). Stockyard Layout Planning in Precast Concrete Products Industry: A Case Study and Proposed Framework. Construction Management & Economics, 19, 365-377.
https://doi.org/10.1080/01446190110035636
[19]  Mohammad, M. F. (2013). Construction Environment: Adopting IBS Construction Approach towards Achieving Sustainable Development. Procedia—Social and Behavioral sciences, 85, 8-15.
https://doi.org/10.1016/j.sbspro.2013.08.332
[20]  Moody, D. L., & Shanks, G. G. (2003). Improving the Quality of Data Models: Empirical Validation of a Quality Management Framework. Information Systems, 28, 619-650.
https://doi.org/10.1016/S0306-4379(02)00043-1
[21]  Motamedi, A., & Hammad, A. (2009). RFID-Assisted Lifecycle Management of Building Components Using BIM Data. In C. H. Caldas, W. J. O’Brien, S. Chi, J. Gong, & X. Luo (Eds.), Proceedings of 26th International Symposium on Automation and Robotics in Construction (ISARC) (pp. 109-116). International Association for Automation and Robotics in Construction.
https://doi.org/10.22260/ISARC2009/0064
[22]  Murray, N., Fernando, T., & Aouad, G. (2003). A Virtual Environment for the Design and Simulated Construction of Prefabricated Buildings. Virtual Reality, 6, 244-256.
https://doi.org/10.1007/s10055-003-0107-8
[23]  Ng, T., Palaneeswaran, E., & Kumaraswamy, M. (2012). Costs and Benefits of ISO9000-Based Quality Management Systems to Construction Contractors. Australasian Journal of Construction Economics & Building, 8, 23-29.
https://doi.org/10.5130/AJCEB.v8i2.3003
[24]  Pavese, A., & Bourna, D. A. (2011). Experimental Assessment of the Seismic Performance of a Prefabricated Concrete Structural Wall System. Engineering Structures, 33, 2049-2062.
https://doi.org/10.1016/j.engstruct.2011.02.043
[25]  Srivannaboon, S., & Milosevic, D. Z. (2007). The Process for Aligning Project Management and Business Strategy: An Empirical Study. In M. Hörlesberger, M. El-Nawawi, & T. Khalil (Eds.), Challenges in the Management of New Technologies (pp. 227-240). World Scientific.
https://doi.org/10.1142/9789812770318_0016
[26]  Staub-French, S., Russell, A., & Tran, N. (2008). Linear Scheduling and 4D Visualization. Journal of Computing in Civil Engineering, 22, 192-205.
https://doi.org/10.1061/(ASCE)0887-3801(2008)22:3(192)
[27]  Tam, V., Tam, C. M., Zeng, S. X., & Ng, W. C. Y. (2007). Towards Adoption of Prefabrication in Construction. Building and Environment, 42, 3642-3654.
https://doi.org/10.1016/j.buildenv.2006.10.003
[28]  Teng, Y., Li, K., Pan, W., & Thomas Ng, S. (2018). Reducing Building Life Cycle Carbon Emissions through Prefabrication: Evidence from and Gaps in Empirical Studies. Building and Environment, 132, 125-136.
https://doi.org/10.1016/j.buildenv.2018.01.026
[29]  Thompson, R. L., Smith, H. J., & Iacovou, C. L. (2007). The Linkage between Reporting Quality and Performance in IS Project. Information & Management, 44, 196-205.
https://doi.org/10.1016/j.im.2006.12.004
[30]  Vonder, S. V. D., Demeulemeester, E., & Herroelen, W. (2007). A Classification of Predictive-Reactive Project Scheduling Procedures. Journal of Scheduling, 10, 195-207.
https://doi.org/10.1007/s10951-007-0011-2
[31]  Wang, Z. L., Shen, H. C., & Zuo, J. (2019). Risks in Prefabricated Buildings in China: Importance-Performance Analysis Approach. Sustainability, 11, Article No. 3450.
https://doi.org/10.3390/su11123450
[32]  Zhang, K., & Tsai, J. S. (2021). Identification of Critical Factors Influencing Prefabricated Construction Quality and Their Mutual Relationship. Sustainability, 13, Article No. 11081.
https://doi.org/10.3390/su131911081
[33]  Zhang, Z., Yuan, Z., Ni, G., Lin, H., & Lu, Y. (2020). The Quality Traceability System for Prefabricated Buildings Using Blockchain: An Integrated Framework. Frontiers of Engineering Management, 7, 528-546.
https://doi.org/10.1007/s42524-020-0127-z

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133