全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

三峡工程蓄水运行后新江口水沙特性变化分析
Changes of Hydrodynamics and Sediment Transport at Xinjiangkou after Impounding of the Three Gorges Project

DOI: 10.12677/JWRR.2021.105053, PP. 491-499

Keywords: 三峡工程,清水下泄,断面冲淤,水沙变化
Three Gorges Reservoir
, Release Clear Water, Scouring and Siltation, Water and Sediment Variation Characteristics

Full-Text   Cite this paper   Add to My Lib

Abstract:

三峡工程蓄水运行后,随着出库泥沙大幅减少,造成下游水流挟沙能力处于不饱和状态,改变了原有河道特性及冲淤变化条件,水文站测验受到不同程度的影响。本文以荆江三口之一,松滋新江口水文站为例,通过蓄水前后新江口站附近河段断面冲淤变化,测站水沙变化特征分析,表明三峡工程蓄水运行后,新江口站水文断面有一定的冲刷,断面分流比变化不大而分沙比有逐年增加的趋势。
After the operation of the Three Gorges Reservoir (TGR), the sediment carrying capacity in the downstream flow is in an unsaturated state due to clear water release, which changes the scour and silt characteristics of the original channel. The west branch of Songzi River was selected to analyze the change of scouring and siltation at Xinjiangkou cross-section. The results show that after the impoundment of TGR, the water diversion ratio is changed a little while the sediment diversion ration is increasing annually at the Xinjiangkou cross-section.

References

[1]  胡功宇, 黄火林. 松滋口分流分沙变化分析[J]. 人民长江, 2006, 37(12): 47-48. HU Gongyu, HUANG Huolin. Analysis of flow and sediment diversion at Songzi River. Yangtze River, 2006, 37(12): 47-48. (in Chinese)
[2]  李彦彦, 杨贵山, 万荣荣, 等. 1968~2018年洞庭湖江湖连通工程松滋口冲淤变化特征[J]. 长江流域资源与环境, 2020, 29(10): 2239-2249. LI Yanyan, YANG Guishan, WAN Rongrong, et al. Channel erosion and deposing of Songzikou Outlet: A river-lake connected channel of Dongting Lake during 1968-2018. Resources and Environment in the Yangtze Basin, 2020, 29(10): 2239-2249. (in Chinese)
[3]  毛北平, 梅军亚, 张金辉, 等. 洞庭湖三口洪道水沙输移变化分析[J]. 人民长江, 2010, 41(2): 38-42+46. MAO Beiping, MEI Junya, ZHANG Jinhui, et al. Analysis of water and sediments transportation of three river-outlets flood channels from Yangtze River to Dongting Lake. Yangtze River, 2010, 41(2): 38-42+46. (in Chinese)
[4]  黄火林, 吴世勇. 三峡蓄水前后新江口水位流量变化分析[J]. 水利水电快报, 2007, 28(12): 22-24. HUANG Huolin, WU Shiyong. Analysis on the change of water level and discharge of Xinjiangkou hydrologic station before and after Three Gorges impoundment. Express Water Resources & Hydropower Information, 2007, 28(12): 22-24. (in Chinese)
[5]  卢金友. 荆江三口分流分沙变化规律研究[J]. 泥沙研究, 1996(4): 54-61. LU Jinyou. Study on laws of runoff and sediment diverted from three outfalls on the Jingjiang Reach of the Yangtze River. Journal of Sediment Research, 1996(4): 54-61. (in Chinese)
[6]  高耶, 谢永红, 邹冬生. 三峡工程运行前后荆江三口水文情势的变化[J]. 长江流域资源与环境, 2020, 29(2): 479-487. GAO Ye, XIE Yonghong, ZOU Dongsheng. Hydrological regime changes in the Three Outelets of Jingjiang River before and after the operation of the Three Gorges Project. Resources and Environment in the Yangtze Basin, 2020, 29(2): 479-487. (in Chinese)
[7]  许全喜, 胡功宇, 袁晶. 近50年来荆江三口分流分沙变化研究[J]. 泥沙研究, 2009(5): 1-8. XU Quanxi, HU Gongyu and YUAN Jing. Research on the flow and sediment diversion in the three outlets along Jingjiang River in recent 50 years. Journal of Sediment Research, 2019(5): 1-8. (in Chinese)
[8]  周才金, 沈健, 熊慧, 等. 新水沙条件下三口分流分沙及荆江平滩河槽形态变化分析[J]. 人民珠江, 2020, 41(6): 22-26. ZHOU Caijin, SHEN Jian, XIONG Hui, et al. Analysis of flow and sediment diversion at three outlets and changes on flat beach channel morphology of Jingjiang River under the condition of fresh water and sediment. Pearl River, 2020, 41(6): 22-26. (in Chinese)

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133