溃坝洪水对下游高速铁路的影响计算
|
Abstract:
溃坝洪水对下游桥梁安全影响重大。本文以实际工程设计为案例,以溃坝经验公式、曼宁公式和水位流量关系曲线为工具,通过对经验公式有关参数及边界条件的分析和率定,计算溃坝流量,根据洪水演变规律,采用两种方法推算下游桥址断面最高洪水位和洪峰传播时间,为桥梁防洪安全设计提供重要依据。文中的思路和方法,对缺乏水文资料地区溃坝洪水计算具有一定参考与借鉴价值。
The dam break flood has a major impact on the safety of downstream bridges. This paper takes actual engineering design as a case, uses dam-break empirical formula, Manning’s formula, and water level-discharge relationship curve as tools, and calculates the dam-break discharge by analyzing and calibrating the relevant parameters and boundary conditions of the empirical formula. According to the law of flood evolution, two methods are used to calculate the highest flood level and peak propagation time of the downstream bridge site section, and provide an important basis for the design of bridge flood control safety. This study has reference value for the calculation of dam-break flood in areas lacking hydrological data.
[1] | 河海大学, 梁忠民, 钟平安, 华家鹏, 主编. 水文水利计算[M]. 第二版. 北京: 中国水利水电出版社, 2008: 364-366.
Hohai University, LIANG Zhongmin, ZHONG Pingan, HUA Jiapeng, Editor-in-Chief. Hydrology and water conservancy calculation. Second Edition. Beijing: China Water Power Press, 2008: 364-366. (in Chinese). |
[2] | 张发鸿, 岳青华, 郭靖. 缺乏水文资料的复杂天然河道断面水位流量关系曲线计算[J]. 水资源研究, 2020, 9(3): 320-328.
ZHANG Fahong, YUE Qinghua, GUO Jing. Calculation of water level-discharge relationship curve of complex natural river section lacking hydrological data. Water Resources Research, 2020, 9(3): 320-328. (in Chinese). |
[3] | 铁道部第三勘测设计院. TB10017-1999铁路工程水文勘测设计规范[S]. 北京: 中国铁道出版社, 1999.
The Third Survey and Design Institute of the Ministry of Railways. TB10017-1999 code for hydrological survey and design of railway engineering. Beijing: China Railway Publishing House, 1999. (in Chinese). |
[4] | 湖北省水文水资源局. 湖北河流集[M]. 武汉: 1998.
Hubei Provincial Hydrology and Water Resources Bureau. Hubei river collection. Wuhan: 1998. (in Chinese). |
[5] | 卢生亮, 罗放. 浅析溃坝流量对桥址断面洪水计算的影响[J]. 内蒙古水利, 2017(1): 14-15.
LU Shengliang, LUO Fang. Analysis of the influence of dam-breaking flow on flood calculation of bridge site section. Inner Mongolia Water Resources, 2017(1): 14-15. (in Chinese). |