全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
-  2019 

Optimization of Spool Fabrication Process

Keywords: Monte Carlo,stok kesme problemi,stokastik optimizasyon

Full-Text   Cite this paper   Add to My Lib

Abstract:

Spool manufacturing in a workshop environment is a preferred method in recent years for refinery and petrochemical plants. Spool manufacturing involves cutting and welding pipe and fittings in different length and quantities. It is aimed to have the least amount of loss when determining pipes to be cut for a spool. The purpose of this study is to optimize stock material usage to maximize spool quantity or Weld Dia Inch (WDI) total depending on the selected performance criteria. As part of a digital transformation project that covers all stages of the spool manufacturing process for a real factory, a Monte-Carlo algorithm has been developed to solve the optimization problem in the NP-hard category. Material Resource Planning (MRP) which provides the best performance criterion with minimum loss, is determined with the developed method

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133