全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
-  2010 

Optimising a two-echelon capacity-constrained material requirement manufacturing system using a linear programming model

Keywords: material requirement planning (MRP), production/procurement lot sizing, two-echelon manufacturing system

Full-Text   Cite this paper   Add to My Lib

Abstract:

A mixed integer linear programming model representing a two-echelon manufacturing system was implemented. Optimal deci- sions could be made about raw material/component provisioning by using the model. The model was programmed by using an algebraic modeller which was then integrated into a computational tool from which defining parameters could be managed as well as consulting the results once the model had been executed. The model was validated on a real manufacturing system; be- sides providing good representation of the system, optimal provisioning decisions were also reached. The article emphasises that such decisions cannot be made by using usual MRP reasoning

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133