Analytic and Heuristic Methodologies for Solving the Resource Constrained Project Scheduling Problem (RCPSP): a review Part 1

DOI: https://doi.org/10.17230/ingciencia.10.19.12

Keywords: task scheduling, constrained resources, heuristic methods, exact methods.

Full-Text   Cite this paper   Add to My Lib

Abstract:

This paper presents and describes the most relevant methods for the solution of the Resource Constrained Project Scheduling Problem, RCPSP. A critical review of the state of the art, based on the most signicant papers published in the academic literature on this topic is carried out. First, several exact methods of solution are shown and their main advantages and disadvantages are explained; the Branch and Bound methods, considered as the best exact algorithms for solving this problem, are described. Subsequently, several heuristic methods, especially those that have been implemented for sequencing problems, are considered

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133